Rwekunye–Apac–Aduku–Lira–Kitgum–Musingo Road Explained

Country:UGA
Rwekunye–Apac–Aduku–Lira–Kitgum–Musingo Road
Length Mi:217.5
History:Designation in 2015
Expected completion TBD
Direction A:South
Terminus A:Rwekunye
Junction:Apac
Lira
Acholibur
Kitgum
Direction B:North
Terminus B:Musingo

Rwekunye–Apac–Aduku–Lira–Kitgum–Musingo Road is a road in the Northern Region of Uganda, connecting the towns of Masindi Port in Kiryandongo District to Apac in Apac District, Lira in Lira District, Acholibur in Pader District, Kitgum in Kitgum District, and Musingo in Lamwo District at the international border with South Sudan.

Location

The road starts at Rwekunye, a suburb of the town of Masindi Port, on the Kampala-Gulu highway, about 5km (03miles) west of the Victoria Nile. The road continues through five northern Ugandan districts to end at Musingo, a distance of about 350km (220miles).[1] The coordinates of the road near Lira are 2°22'27.0"N, 32°56'04.0"E (Latitude:2.374167; Longitude:32.934444).

Upgrading to bitumen

In 2009, the Ugandan government commissioned a feasibility study and a detailed engineering design for this road and for the 167km (104miles) Acholibur–Gulu–Olwiyo Road, both in northern Uganda. The reports became available in 2013.[1]

In February 2015, the upgrade from unsealed gravel surface to class II bitumen surface began. President Yoweri Museveni commissioned the start of the project on 21 February 2015. The work on the 86km (53miles) from Acholibur to Musingo is assigned to Chongqing International Construction Corporation. Work is expected to last three years.[2] The road project is fully funded by the Ugandan government.[3] The work on the Rwekunye to Acholibur section of the road will be commissioned at a later date.[2]

On 21 October 2020, President Museveni flagged off two other sections of the same road. The 91km (57miles) Rwekunye–Apac section was awarded to Sadeem Al Kuwait General Trading & Contracting Company, of Kuwait. The Apac–Lira–Purang’a section, measuring 100.1km (62.2miles)) was awarded to Gulsan Insaat Sanayi Turizm Nakliyat Ve Tecaret A.S. of Turkey. The budgeted cost of renovating these two sections is USh735 billion (approximately (US$201 million).[4]

In February 2022, UNRA officials estimated the scope of work on this road as 80 percent complete.[5]

See also

External links

2.3742°N 34.2714°W

Notes and References

  1. Web site: 16 July 2015 . April 2013 . Rwekunye–Apac–Lira–Kitgum–Musingo, Olwiyo–Gulu–Kitgum Roads . AICPI . Aicprogetti.it (AICPI).
  2. Web site: Museveni launches road works . 15 July 2015 . 23 February 2015 . Dan Michael . . Kampala . Komakech.
  3. Web site: Solicitor General clears contracts for 450km of roads . . 29 June 2014 . Billy Rwothungeyo . 23 October 2020 . Kampala.
  4. Web site: Museveni flags off Shs753b roadworks . . 23 October 2020 . Daily Monitor . 23 October 2020 . Kampala.
  5. Web site: All oil roads will be ready by 2025, says Kagina . . 28 February 2022 . Ismail Musa Ladu . 28 February 2022 . Kampala, Uganda.