Ruzizi IV Hydroelectric Power Station explained

Ruzizi IV Hydroelectric Power Station
Location Map:Rwanda
Location Map Caption:Map of Rwanda showing the location of
Ruzizi IV Hydroelectric Power Station
Coordinates:-2.7011°N 28.97°W
Status:P
Dam Crosses:Ruzizi River
Plant Commission:2030 (expected)
Plant Type:R
Plant Capacity:287MW

Ruzizi IV Hydroelectric Power Station, is a proposed hydro-power plant, with planned capacity installation of when completed.[1]

Location

The power station is located on Ruzizi River, straddling the common border between Rwanda and the Democratic Republic of the Congo (DC). Its location is approximately 5km (03miles), as the crow flies, west of the town of Bugarama, in Rusizi District, in Rwanda's Western Province, approximately 252km (157miles), southwest of Kigali, the capital city of that country.[2] Ruzizi IV, lies in proximity to three other hydroelectric power stations along River Ruzizi, namely Rizizi I, II and III.[1]

Overview

This power station is the fourth in a cascade of power stations on the Ruzizi River, benefiting the countries of Burundi, DRC and Rwanda. The power stations include Ruzizi I (29.8 megawatts) and Ruzizi II (43.8 megawatts), both located northwest of Ruzizi III and both operational as of January 2020.[1] Ruzizi III Hydroelectric Power Station is a 147 megawatts hydroelectricity power station under development since the early 2010s.[3] The power generated from these power stations is shared equally between the three neighboring countries.[1]

Funding

In January 2020, the African Development Bank approved a grant of €8 million towards the preparation of this project. This follows another grant of US$980,000 approved in late 2018 by the Partnership for Africa Development's Infrastructure Project Preparation Facility (NEPAD-IPPF), towards the same goal.[1] [4]

External links

Notes and References

  1. Web site: Rwanda: AfDB to Fund Ruzizi IV Hydro Power Project . 14 January 2020 . . 20 January 2020 . New Times . . Kigali.
  2. Web site: 20 January 2020 . Globefeed.com . Globefeed.com . Distance between Kigali and Bugarama, Western Province, Rwanda . 20 January 2020.
  3. Web site: 20 January 2020 . AfDB approves financing for 147-MW Ruzizi 3 hydropower plant . Hydroworld.com . Michael Harris . 4 January 2016.
  4. Web site: 14 January 2020 . AfDB approves €8m grant for Ruzizi IV hydropower project preparation . NS Energy Business News . 20 January 2020 . NS Energy Staff Writer . United Kingdom.