Rutshuru Power Station | |
Location Map Caption: | Map of the Democratic Republic of the Congo location of Rutshuru |
Country: | Democratic Republic of the Congo |
Location: | Rutshuru, North Kivu |
Status: | O |
Dam Crosses: | Rutshuru River |
Res Elevation: | 1600m (5,200feet) |
Plant Commission: | December 16, 2015 |
Plant Type: | R |
Plant Turbines: | 2 |
Plant Capacity: | 13.8MW |
Location Map: | Democratic Republic of the Congo |
Coordinates: | -1.2258°N 29.46°W |
Rutshuru Hydroelectric Power Station, also referred to as Rutshuru Hydropower Station, (French: Centrale hydroélectrique de Rutshuru) is a 13.8MW hydroelectric power station under construction in the Democratic Republic of the Congo.[1] The plant was finished on December 16, 2015.[2]
The power station is located near the town of Rutshuru, in Rutshuru Territory, North Kivu Province, in eastern Democratic Republic of the Congo. This location lies at an altitude of about, on Rutshuru River, in the Virunga Mountains, close to the International borders with the Republic of Uganda and the Republic of Rwanda. Rutshuru lies approximately, by road, north of Goma, the location of the provincial capital.[3]
Rutshuru Power Station is a run of river, mini-hydropower plant, with planned installed capacity of 12.5 Megawatts.[4] It is one of three mini-hydropower stations planned for construction in Virunga National Park, in North Kivu, in eastern DRC. The other two mini hydropower stations are the planned Lubero Hydroelectric Power Station,[5] and Mutwanga Hydroelectric Power Station, which was commissioned in August 2013.
The Howard G Buffett Foundation, an American philanthropic organization, which provided technical and financial support from the beginning of the project, has committed another US$19.7 million towards the completion of the Rutshuru Hydropower Station. Construction began in December 2013 and commissioning is expected in 2016.[6]