Rumoi Main Line Explained

Rumoi Main Line
Color:2cb431
Type:Regional rail
Status:In operation
Locale: JR Hokkaido
Stations:5
Open:23 October 1910
Close:5 December 2016 (Rumoi–Mashike)
1 April 2023 (Ishikari-Numata–Rumoi)
March 2026 (entire line) (planned)
Owner:JR Hokkaido
Operator:JR Hokkaido
Character:Rural
Stock:KiHa 54 series DMU, KiHa 150 series DMU
Linelength:14.4km (08.9miles)
Speed:95 km/h (59 mph)
Electrification:None
Tracks:Entire line single tracked

The is a Japanese railway line in Hokkaido operated by Hokkaido Railway Company (JR Hokkaido) which connects Fukagawa Station in Fukagawa and Ishikari-Numata Station in Numata. Following the discontinued service from Rumoi to Ishikari-Numata on April 1, the Rumoi Main Line is the shortest railway line in Japan, to be classified as a 'main line' at 14.4 kilometers.

On 19 November 2016, JR Hokkaido's president announced plans to further rationalize the network by up to 1237km (769miles), or approximately 50% of the network,[1] including closure of the remaining section of the Rumoi Main Line (the Rumoi to Mashike section closed on 5 December 2016). This section of track from Ishikari-Numata to Rumoi was closed on 1 April 2023, with the final train running on the 31 March 2023.

Stations

Stops legend: ●: All trains stop, ◆: some trains skip bidirectionally, ▼: some down trains skip

No.Station nameJapaneseBetween
(km)
Distance
(km)
StopTransfersLocation
深川0.0 Hakodate Main LineFukagawa
北一已3.83.8 
秩父別5.08.8 Chippubetsu,
Uryū District
北秩父別2.411.2 
石狩沼田3.214.4 Numata,
Uryū District

Closed section

Station nameJapaneseBetween
(km)
Distance
(km)
Location
真布3.417.8Numata,
Uryū District
恵比島2.920.7
峠下7.628.3Rumoi
幌糠6.234.5
藤山5.540.0
大和田4.244.2
留萌5.950.1
瀬越2.152.2
礼受4.056.2
阿分1.357.5Mashike,
Mashike District
信砂2.760.2
舎熊0.861.0
朱文別1.762.7
箸別1.364.0
増毛2.866.8

History

The initial section of the line, between Fukagawa and Rumoi opened on 23 October 1910, and was extended to Mashike on 5 November 1921.[2] The line was reclassified as a "main line" from 10 October 1931.[2] With the privatization of Japanese National Railways (JNR) on 1 April 1987, the line came under the control of JR Hokkaido.[2]

Closure plans

On 10 August 2015, JR Hokkaido informed the mayors of Rumoi and Mashike of its plans to close the 16.7km (10.4miles) section of the line from Rumoi to Mashike in 2016.[3] In April 2016, it was officially announced that the section from Rumoi to Mashike would close, and the last service operated on 4 December of that year.[4]

The 4 towns and cities along the remaining line, Rumoi, Numata, Chippubetsu and Fukagawa were in discussion with JR Hokkaido regarding the line's future, but Rumoi left the group as the city was already well-equipped so they didn't see keeping the railway open as necessary after Rumoi IC opened in Fukagawa-Rumoi Expressway.[5]

In September 2022, JR Hokkaido submitted a proposal to the Ministry of Land, Infrastructure, Transport and Tourism to close an additional 35.7km (22.2miles) between Ishikari-Numata and Rumoi.[6] [7] As the closure was approved on 9 December 2022,[8] the end of service was announced for 31 March 2023, and the closure occurred on 1 April 2023.[9] [10]

Although the rest of the municipalities proposed that the rest of the line remains open, the proposal failed when JR Hokkaido demanded 300,000,000 yen yearly to keep the line open. As a result, The remaining 14.4km (08.9miles) section to Fukagawa is slated to be closed in March 2026.

Notes and References

  1. Web site: JR Hokkaido says it can't maintain half of its railways. 10 May 2013. 26 November 2016. 20 November 2016. https://web.archive.org/web/20161120135811/http://www.japantimes.co.jp/news/2016/11/19/business/jr-hokkaido-says-cant-maintain-half-railways/#.WDjkB9J96Ul. live.
  2. Book: ja: 停車場変遷大辞典 国鉄・JR編 . Station Transition Directory - JNR/JR. JTB . Ishino. Tetsu. 1998 . Japan . ja . I. 83, 129. 4-533-02980-9.
  3. Web site: http://rail.hobidas.com/news/info/article/post_279.html. ja: 留萌線(留萌~増毛間)の鉄道事業廃止について. Closure of Rumoi Line between Rumoi and Mashike. 10 August 2015. Tetsudo Hobidas. Neko Publishing Co., Ltd.. Japan. ja. 11 August 2015. 8 December 2015. https://web.archive.org/web/20151208165438/http://rail.hobidas.com/news/info/article/post_279.html. live.
  4. Web site: http://dd.hokkaido-np.co.jp/news/society/society/1-0257233.html. ja: JR留萌線留萌―増毛間12月4日に廃止 増毛町が同意. Mashike agrees to closure of JR Rumoi Line between Rumoi and Mashike on 4 December . 8 April 2016. Doshin Web. The Hokkaido Shimbun Press. Japan. ja. https://web.archive.org/web/20160408151523/http://dd.hokkaido-np.co.jp/news/society/society/1-0257233.html. 2016-04-08. dead. 14 April 2016.
  5. Web site: big5 . 2022-11-02 . 【JR北海道】二段階で廃止へ-留萌本線を残せなかった理由とは . 2024-04-30 . 鉄道協議会日誌 . ja.
  6. Web site: 10 September 2022 . JR北海道,留萌本線 石狩沼田—留萌間の鉄道事業廃止届を提出 . JR Hokkaido Rumoi Main Line Ishikari-Numata - Rumoi service discontinuation proposal submitted . https://web.archive.org/web/20220911032156/https://railf.jp/news/2022/09/10/160000.html . 11 September 2022 . 14 September 2022 . Japan Railfan Magazine Online . ja.
  7. Web site: 9 September 2022 . 留萌本線「一部廃止」来春にも JR北海道が国交相に届出、残る区間も3年半後まで . Rumoi Main Line "Partially abolished": JR Hokkaido will notify the Minister of Land, Infrastructure, Transport and Tourism next spring, and the remaining section will be closed 3 and a half years later . https://web.archive.org/web/20220909084751/https://news.railway-pressnet.com/archives/43798 . 9 September 2022 . 14 September 2022 . news.railway-pressnet.com . ja.
  8. Web site: 2022-12-09 . 留萌本線の一部廃止「来年4月1日」確定 朝ドラ『すずらん』明日萌駅も消滅 鉄道ニュース【鉄道プレスネット】 . 2022-12-13 . ja.
  9. News: 鉄道事業の一部廃止の日を繰り上げる届出について . 国土交通省北海道運輸局鉄道部 . 2023-02-17 . https://web.archive.org/web/20221209074237/https://wwwtb.mlit.go.jp/hokkaido/content/000283326.pdf . 2022-12-09.
  10. News: 留萌線(石狩沼田・留萌間)の廃止日繰上げの届出について . 北海道旅客鉄道 . 2023-02-17 . https://web.archive.org/web/20221209052157/https://www.jrhokkaido.co.jp/CM/Info/press/pdf/221209_KO_Rmoi_line.pdf . 2022-12-09.