Ruby Group Explained

The Ruby Group of two 600 ton Fourth Rate vessels were part of the 1651 Programme. They were the two larger vessels. Initially five vessels were specified, three of 410 tons at 6.10.0d[1] per ton and two of 600 tons at £7.10.0d[2] per ton. The size of these vessels grew from the 1647 predecessors with 600 tonners being much broader. The two 600-ton vessels would be completed as 42-gun Fourth Rates.[3]

Design and specifications

The construction one vessels was assigned to Portsmouth Dockyard with one vessel contracted to Peter Pett I of Ratcliffe. The dimensional data was so varied that it will be listed on the individual vessels along with their gun armament composition.[4]

Ships of the 1651 Programme Group

Name Builder Launch date Remarks
Deptford Dockyard 15 March 1652
  • Rebuilt at Blackwall 1687
Deptford Dockyard 15 March 1652
  • Captured by the French on 20 September 1693

References

Notes and References

  1. The cost accounting for inflation of approximately £ in reference to today
  2. The cost accounting for inflation of approximately £ in reference to today
  3. Winfield
  4. Winfield