Native Name: | Рублёво-Архангельская линия |
Native Name Lang: | ru |
Color: | Brown |
Type: | Rapid transit |
System: | Moscow Metro |
Locale: | Moscow |
Stations: | 10 |
Operator: | Moskovsky Metropoliten |
Character: | Underground |
Linelength: | 18.7km (11.6miles) |
Electrification: | Third rail |
Rublyovo-Arkhangelskaya line (Russian: Рублёво-Архангельская линия) or Line 17 of the Moscow Metro is currently under construction. It began in 2021 and will end after 2028, opening in two phases.[1] [2] Phase 1 is scheduled to be completed by 2026-2027 completing the section from Delovoy Tsentr to Lipovaya Roscha station and phase two is scheduled to open after 2028 expanding the line from Lipovaya Roshcha to Ilyinskaya station. In the future it will be connected with Biryulyovskaya line.[3]
Ilyinskaya | Ильинская | Planned | |||
Rublyovo-Arkhangelskoe | Рублево - Архангельское | Planned | |||
Lipovaya Roscha | Липовая Роща | Planned | |||
Strogino | Строгино | Planned | |||
Zhivopisnaya | Живописная | Planned | |||
Bulvar Karbysheva | Бульвар Карбышева | Under Construction | 2026 | ||
Karamyshevskaya | Карамышевская | Under Construction | 2026 | ||
Zvenigorodskaya | Звенигородская | Under Construction | 2026 | ||
Shelepikha | Шелепиха | (within walking distance) | Opened | 2018 | |
Delovoy Tsentr | Деловой Центр | (within walking distance) (within walking distance) (within walking distance) | Opened | 2018 |