Rio Grande Project | |
Headerstyle: | background:#ccf; |
Labelstyle: | background:#ddf; |
Header1: | General statistics |
Label2: | Begun |
Data2: | 1905 |
Label3: | Completed |
Data3: | 1952 |
Label4: | Dams and reservoirs |
Data4: | Elephant Butte Caballo Percha (diversion) Leasburg (diversion) Mesilla (diversion) American (diversion) Riverside (diversion) Picacho North (flood control) Picacho South (flood control) |
Label5: | Power plants |
Data5: | Elephant Butte (27.95 MW) |
Label6: | Canals |
Data6: | 1061miles (total) 596miles (irrigation) 465miles (drainage) |
Header7: | Operations |
Label8: | Storage capacity |
Data8: | 2453413acre feet |
Label9: | Annual water yield |
Label10: | Land irrigated |
Data10: | 193000acres |
Label11: | Power plant capacity |
Data11: | 27.95 MW |
Belowstyle: | background:#ddf; |
The Rio Grande Project is a United States Bureau of Reclamation irrigation, hydroelectricity, flood control, and interbasin water transfer project serving the upper Rio Grande basin in the southwestern United States. The project irrigates 193000acres along the river in the states of New Mexico and Texas.[1] Approximately 60 percent of this land is in New Mexico. Some water is also allotted to Mexico to irrigate some 25000acres on the south side of the river. The project was authorized in 1905,[2] but its final features were not implemented until the early 1950s.
The project consists of two large storage dams, 6 small diversion dams, two flood-control dams, 596miles of canals and their branches and 465miles of drainage channels and pipes. A small hydroelectric plant at one of the project's dams also supplies electricity to the region.[3]
Long before Texas was a state, the Pueblo Indians used the waters of the Rio Grande with simple irrigation systems that were noted by the Spanish in the 16th century while conducting expeditions from Mexico to North America. In the mid-19th century, American settlers began intensive irrigation development of the Rio Grande watershed. Small dikes, dams, canals, and other irrigation works were constructed along the Rio Grande and its tributaries. The river would take out some of these primitive structures in its annual floods, and a large, coordinated project would be needed to construct permanent replacements. However, investigations to begin this project did not begin until the early twentieth century.
Like many rivers of the American Southwest, runoff in the Rio Grande basin is limited and varies widely from year to year.[4] By the 1890s, water use in the upper basin was so great that the river's flow near El Paso, Texas, was reduced to a trickle in dry summers. To resolve these problems, plans were drafted up for a large storage dam at Elephant Butte, about 120miles downstream of Albuquerque, New Mexico. The Newlands Reclamation Act was passed in 1902, authorizing the Rio Grande Project as a Bureau of Reclamation undertaking. For the next two years, surveyors and engineers undertook a comprehensive feasibility study for the project's dams and reservoirs.
The first elements of the project to be built were the Leasburg Diversion Dam and about 6miles of supporting canal, begun in 1906 and finished in 1908. Elephant Butte Dam, the largest dam on the Rio Grande, was authorized by the United States Congress on February 15, 1905. Construction began in 1908, when groundworks were laid. Conflicts over the lands to be submerged under the future reservoir bogged down the project for a while, but work resumed in 1912 and the reservoir began to fill by 1915. The Franklin Canal was an existing 1890 canal purchased by the Bureau of Reclamation in 1912 and rebuilt from 1914 to 1915. The Mesilla and Percha Diversion Dams, East Side Canal, West Side Canal, Rincon Valley Canal, and an extension of the Leasburg Canal were built in the period between 1914 and 1919.[3]
In the late 1910s, a problem developed with rising local groundwater levels caused by irrigation. In response, Reclamation began planning for the extensive 465miles drainage system of the Rio Grande Project in 1916. Contracts for the construction of these drainage systems, as well as distribution canals (laterals) were not awarded until the period from 1917 to 1918. Before 1929, the entire irrigation system would be overhauled. This involved repairing, rebuilding and extending old canals; and construction of new laterals. Work is still in progress, as agricultural development in the region continues to grow.[3]
The last major components of the project were constructed from the 1930s to the early 1950s. Caballo Dam, the second major storage facility of the project located 21 miles south of Truth or Consequences, New Mexico was built from 1936 to 1938. Caballo was built to provide flood protection for the projects downstream, stabilize outflows from Elephant Butte, and replace storage lost in Elephant Butte Reservoir due to sedimentation. With the benefit of flow regulation, a small hydroelectric plant was completed in 1940 at the base of Elephant Butte Dam. The construction of power transmission lines was begun in 1940, and was finally completed by 1952.[3] [5]
The Elephant Butte Irrigation District is a 6870acres historic district providing recognition and limited protection for the history of much of the system, which was listed on the National Register of Historic Places in 1997. The listing included three contributing buildings and 214 contributing structures. Noted as historic are the diversion dams and the unlined irrigation canals; most of the mechanical fixtures in the system have been routinely replaced and are non-historic.[6]
See main article: Elephant Butte Dam. The Elephant Butte Dam (also referred to as Elephant Butte Dike) is the main storage facility for the Rio Grande Project. It is a 1674feet long concrete gravity dam standing 193feet above the river and 301feet high from its foundations. The dam is 228feet thick at the base and tapers to about 18feet thick at the crest.[7] The dam took 629500yd3 of material to construct.
The full volume of Elephant Butte Reservoir is some 2109423acre.ft, accounting for about 85% of the project's storage capacity. The outlet works of the dam can release 10800cuft/s, while the service spillway can release 34750cuft/s.[7]
The reservoir and dam receive water from a catchment of 28900sqmi, about 16% of the Rio Grande's total drainage area.[7] The Elephant Butte hydroelectric station is a base load power plant that draws water from the reservoir and has a capacity of 27.95 megawatts.[8]
See main article: Caballo Dam. Caballo Dam is the second major storage dam of the Rio Grande Project, located about 25miles below Elephant Butte. The dam is 78feet high above the river, 96feet high from its foundations, and 4558feet long. It forms the Caballo Reservoir, which can store up to 343990acre feet of water.
The outlet works can release 5000ft3 cubic feet per second, while the spillway has a capacity of 33200ft3 per second.[9] The dam has no power generation facilities, although it has been proposed that a small hydroelectric plant be installed at its base for local irrigation districts.[10]
See main article: Percha Diversion Dam. Percha Diversion Dam lies downstream from and 1miles west of the Caballo Dam. It consists of a concrete overflow section flanked by earthen wing dikes totaling 2489feet in length, standing 19feet high above the riverbed and 29feet above its foundations..[11] The dam diverts water into the Rincon Valley Main Canal, which is 28.1miles long and has a capacity of 350cuft/s. Water from the canal irrigates 16260acres of land in the Rincon Valley.[3]
See main article: Leasburg Diversion Dam. Leasburg Diversion Dam is downstream and nearly identical in design to the Percha Diversion Dam. It is 7feet high above the river and 10feet high above its foundations. The dam and adjacent dikes total 3922.3feet in length. The dam's spillway is a broad-crested weir about 600feet long with a capacity of 17000cuft/s.[12] The dam diverts water into the 13.7miles Leasburg Canal, which irrigates 31600acres of land in the upper Mesilla Valley. The canal has a capacity of 625ft3 per second.
Pichacho North and Pichacho South dams impound North Pichacho Arroyo and South Pichacho Arroyo, respectively, to provide flood protection for the Leasburg Canal. Both arroyos are ephemeral, and so the dams operate only during storm events. The dams were both built in the 1950s.
See main article: Mesilla Diversion Dam. The Mesilla Diversion Dam is located about 40miles upstream of El Paso and consists of a gated overflow structure. The dam is 10feet high above the Rio Grande, 22feet high above its foundations, and measures 303feet long. The spillway has a capacity of 15000cuft/s.[15] The dam diverts water into the East Side Canal and West Side Canal, which provide irrigation water to 53650acres of land in the lower Mesilla Valley. The East Side Canal is 13.5miles long, and has a capacity of 300cuft/s. The West Side Canal is larger at 23.4miles long, and has a capacity of 650cuft/s. Near its end, the West Side Canal crosses underneath the Rio Grande via the Montoya Siphon.[3]
See main article: American Diversion Dam and American Canal.
The American Diversion Dam is a gated dam flanked by earthen dikes about 2miles northwest of El Paso and just above the Mexico–United States border. It is 5feet high above the riverbed, and 18feet from crest to foundation. The spillway is 286feet long and has a capacity of 12000cuft/s.[16] The dam diverts water into the American Canal, which carries up to 1200cuft/s of water for 2.1miles to the beginning of the Franklin Canal. The Franklin Canal is 28.4miles long and takes water into the El Paso Valle, where it irrigates 17000acres.[3]
See main article: Riverside Diversion Dam. Riverside Diversion Dam is the lowermost dam of the Rio Grande Project. The dam is 8feet above the streambed, 17.5feet above its foundations, and 267feet long. Its service spillway consists of six 16feetx8.17feet radial gates, and an uncontrolled overflow weir serves as an emergency spillway.[17] The Riverside Canal carries water 17.2miles to the El Paso Valley, and has a capacity of about 900cuft/s. The Tornillo Canal, with a capacity of 325cuft/s, branches 12miles off the Riverside Canal. Excess waters from the canals are diverted to irrigate about 18000acres in Hudspeth County, Texas.[3]
The Rio Grande Project furnishes irrigation water year-round to a long, narrow area of 178000acres[2] in the Rio Grande Valley in south-central New Mexico and western Texas. Crops grown in the region include grain, pecans, alfalfa, cotton, and many types of vegetables. Power generated at the Elephant Butte power plant is distributed through an electrical grid totaling 490miles of 115-kilovolt transmission lines and 11 substations. Originally built by Reclamation, the power grid remained under its ownership until 1977, when it was sold to a local company.[8]
Caballo and Elephant Butte reservoirs are both popular recreational areas. Elephant Butte Reservoir, with 36897acres of water at full pool, is popular for swimming, boating, and fishing. Cabins, fishing tackle, and boat rental services are available at the reservoir. Downstream Caballo Reservoir, with an area of 11500acres, is also a popular site for picnicking, fishing and boating. Elephant Butte Lake State Park and Caballo Lake State Park serve the two reservoirs, respectively.[3]
Even before the Rio Grande Project, the waters of the Rio Grande were already overtaxed by human development in the region. At the end of the 19th century, there were some 925 diversions of the river in the state of Colorado alone. In 1896, it was affirmed by the United States Geological Survey (USGS) that the river's flow was decreasing by 200000acre.ft annually. The river has run dry many times since the 1950s at Big Bend National Park. At El Paso, Texas, the river is non-existent for much of the year. Tributaries of the river, both on the Mexican and American sides, have been diverted heavily for irrigation. The Rio Grande is said to be "one of the most stressed river basins in the world".[18] In 2001, the river failed to reach the Gulf of Mexico but instead ended 500feet from the shore behind a sandbar, "not with a roar but with a whimper in the sand".[19]
The river's decreasing flow has posed problems for international security. In the past, the river was wide, deep and fast-flowing in its section through Texas, where it forms a large section of the Mexico–United States border. Illegal immigrants once had to swim across the river at the border, but with the river so low immigrants need only wade across for most of the year. Other than extensive diversions, exotic introduced, fast-growing and water-consuming plants, such as water hyacinth and hydrilla, are also leading to reduced flows. The United States government has recently attempted to slow or stop the progress of these weeds by introducing insects and fish that feed on the invasive plants.[19]