TE Rijeka | |
Name Official: | Termoelektrana Rijeka |
Coordinates: | 45.2861°N 14.5206°W |
Country: | Croatia |
Location: | Kostrena |
Status: | M |
Construction Began: | 1974 |
Commissioned: | 1978 |
Owner: | Hrvatska elektroprivreda |
Th Fuel Primary: | Fuel oil |
Ps Units Operational: | 1 × 320 MW |
Ps Units Manu Model: | Ansaldo Energia |
Ps Electrical Capacity: | 320 MW |
The Rijeka Thermal Power Station (Croatian: Termoelektrana Rijeka, TE Rijeka, also known as TE Urinj) is an oil-fired power station east of Rijeka at Kostrena, Croatia. It was built between 1974 and 1978 and it has one generation unit with capacity of 320 MW.[1] [2] [3] [4] The height of the boiler house including its rooftop flue gas stack is .[1]
Turbine for the power station was supplied by Ansaldo Energia. Ansaldo Energia was also awarded engineering, procurement and construction contract. Boilers were supplied by Waagner-Biro.[1] [3]
The power station is owned and operated by Hrvatska elektroprivreda.[1] [3] Its annual production varies, averaging 917 GWh, but only 141 GWh in 2011.[5] It is expected to undergo decommissioning in 2020, but it is doubtful that it will remain operational until then because of its pollution problem.[6], Rijeka Thermal Power Station is offline, ready to resume generation within 160 hours of notice.[7] On 18 October 2022, it was unofficially reported that HEP plans to restart the operation of the power plant in order to cover the losses incurred during the energy crisis.[8]
On December 15, 2023, HEP issued a notice on the start-up of the Rijeka Thermal Power Plant and related operations, which are planned for December 18, 2023, in accordance with the Intervention Plan on measures to protect the security of the gas supply of the Republic of Croatia (NN 127/22) with the aim of ensuring electricity stability of the Republic of Croatia. During operation, additional tests of process systems will be carried out with burner adjustment for optimal operation at higher loads, which could not be tested during short-term operation during February 2023. The duration of the operation will be determined by the completion of the test and measurement program and the target consumption of stored fuel. In order to determine compliance with the measures given in the environmental permit, measurements of pollutant emissions into the air will be carried out.[9]