Beijing Subway restricted stations explained
Beyond, the terminus that is accessible to the public, there are two other stations on Line 1, Beijing Subway.
53# station is located under a military base, therefore rendering it inaccessible to the public.
station is under renovation.[1] [2]
Fushouling station
See main article: Fushouling station. station, previously known as 52# station, is currently under renovation. It is the second last station of Line 1, Beijing Subway. However, its location is actually outside of the military zone, and thus it was decided to open the station to the public. On 25 November 2021, the station began renovation,[3] and it is expected that the station will open in 2023. The station will also serve the nearby Beijing Banking & Insurance Business Park (北京银行保险产业园).[4]
39.9383°N 116.1646°W
53# station (Gaojing station, No. 101)
53# station, also known as Gaojing by Shijingshan District Government,[5] [6] [7] is located under a military base. There are two side platforms with space for two tracks, one of which (facing) has been left unbuilt.
39.9482°N 116.1423°W
Connection to Sanjiadian railway station
After 53# station, there is a spur to the Sanjiadian railway station in Mentougou District, also located in Beijing's Western Hills.
See also
External links
Notes and References
- Web site: 地铁1号线福寿岭站改造工程将于今年底前开工. 2020-01-07. 2020-01-07. 2020-07-26. https://web.archive.org/web/20200726170512/http://www.bjd.com.cn/a/202001/07/WS5e1418fde4b0e6e5839377a9.html. dead.
- Web site: 北京市人民政府办公厅关于印发《2020年北京市交通综合治理行动计划》的通知. 2020-02-17. 2020-02-17. https://web.archive.org/web/20200217070926/http://www.beijing.gov.cn/zhengce/zhengcefagui/202002/t20200217_1644724.html. 2020-02-17. live.
- Web site: 机电公司北京分公司承建的福寿岭启用改造项目正式动工. 2021-12-01. https://web.archive.org/web/20211218183557/http://jd.crec4.com/content-3203-4852-1.html. 2021-12-18.
- Web site: 重磅 1号线福寿岭站即将启用 建设北京·银行保险产业园至中关村西区、金融街半小时交通圈. 2019-07-31. https://web.archive.org/web/20190806093754/http://bx.hongrenxingyuan.com/index.php?s=/Home/Article/detail/id/381.html. 2019-08-06. 2019-08-06. live.
- Web site: 北京地铁1号线福寿岭站年内竣工!高井站开启改造研究. 2023-01-05. https://web.archive.org/web/20230124025617/https://bj.bjd.com.cn/5b165687a010550e5ddc0e6a/contentShare/5b16573ae4b02a9fe2d558f9/AP63b6ae04e4b0fb99eeb2fa00.html. 2023-01-24.
- Web site: 石政发〔2022〕1号 北京市石景山区人民政府关于印发2022年折子工程的通知. 26.启动地铁1号线高井站前期研究。 牵头领导:齐春利 主责单位:区西部建设办.
- Web site: 石景山2022年工作计划出炉,邀你一起"乘风破浪"!. 2021-12-14. https://archive.today/20211215155845/http://ie.bjd.com.cn/a/202112/14/AP61b899d6e4b0d5b7f3615e8a.html. 2021-12-15. 石景山区投资促进中心. 2022-01-03. live.