Rannoch railway station explained

Rannoch
Native Name:Gaelic; Scottish Gaelic: Raineach[1]
Symbol Location:gb
Symbol:rail
Borough:Rannoch, Perth and Kinross
Country:Scotland
Coordinates:56.6859°N -4.577°W
Grid Name:Grid reference
Manager:ScotRail
Platforms:2
Code:RAN[2]
Opened:7 August 1894
Footnotes:Passenger statistics from the Office of Rail and Road
Embedded:
Embed:yes
Designation1:Category B
Designation1 Date:21 December 1988
Designation1 Number:LB12245

Rannoch railway station, on the West Highland Line, serves the area of Rannoch in Perth and Kinross, Scotland. In 2017, Simon Jenkins reported it to be one of the best 10 stations in Britain.[3] It is situated between Corrour and Bridge of Orchy, 64miles from Craigendoran Junction, near Helensburgh.[4] ScotRail manage the station and operate most services, along with Caledonian Sleeper.

History

When the West Highland Line was built across Rannoch Moor, its builders had to float the tracks on a mattress of tree roots, brushwood and thousands of tons of earth and ashes to prevent the heavy steel tracks sinking in the bog.

Rannoch station opened to passengers on 7 August 1894.

The station was laid out with a crossing loop and an island platform. There were sidings on both sides, and a turntable on the east side of the line.[5] The siding on the east side has been removed. The station was host to a LNER camping coach from 1937 to 1939.[6]

On 25 January 1987, the crossing loop was altered to right-hand running. The original Down platform has thus become the Up platform, and vice versa. The change was made in order to simplify shunting at this station, by removing the need to hand-pump the train-operated loop points to access the sidings.

At the north end of the platform is a sculptured head, carved in stone by the navvies (workmen) who built the line. It commemorates James Renton, a director of the West Highland Railway, who gave part of his personal fortune to save the line from bankruptcy during construction when the brushwood raft was continually sinking into Rannoch Moor.[7]

Signalling

The signal box, which had 17 levers, was situated on the island platform. From the time of its opening in 1894, the West Highland Railway was worked throughout by the electric token system.

In 1967, the method of working between and Rannoch was changed to the Scottish Region Tokenless Block system.

In August 1985, the method of working between Crianlarich and Rannoch reverted to the electric token block system. The semaphore signals were removed on 3 November 1985 in preparation for the introduction of Radio Electronic Token Block (RETB).

The RETB system was commissioned by British Rail between and Fort William Junction on 29 May 1988. This resulted in the closure of Rannoch signal box and others on that part of the line. The RETB is controlled from a Signalling Centre at Banavie railway station.

The Train Protection & Warning System was installed in 2003.

There was formerly another crossing point on Rannoch Moor, at Gorton[8] near where the railway crossed the Rannoch Drove Road, and operationally dividing the long section between Bridge of Orchy and Rannoch stations. It remains today as an engineer's siding but devoid of the original buildings.

Location

Although the railway links the station with Glasgow and Fort William on the West Highland Line, the station area is otherwise more closely linked, by road, with central Highland towns and villages on or near the A9 road.[9] The B846 road meets the A9 between Pitlochry and Blair Atholl, about 34miles east of the station. Its remote location on Rannoch Moor is picturesque and makes it attractive to walkers.

Facilities

The station is well equipped despite its rural location, with a café and visitor centre, toilets, a phone and a car park and bike racks. However, the only access is via a stepped footbridge, so the station does not have step-free access.[10] As there are no facilities to purchase tickets, passengers must buy one in advance, or from the guard on the train.

Passenger volume

Passenger Volume at Rannoch[11] !!2002-03!2004-05!2005-06!2006-07!2007-08!2008-09!2009-10!2010-11!2011-12!2012-13!2013-14!2014-15!2015-16!2016-17!2017-18!2018-19!2019-20!2020-21
Entries and exits12,46211,25111,45311,21417,09315,02810,31210,3449,1308,2669,4869,4348,3787,7807,9808,8347,290966
The statistics cover twelve month periods that start in April.

Services

Monday to Saturday, ScotRail operates three services north to Mallaig and three services south to Glasgow Queen Street. On Sundays, this decreases to just two each way. Caledonian Sleeper run six services per week (not Saturday nights) each way to Fort William, and London Euston via Edinburgh. The sleeper also carries seated coaches and can therefore be used by regular passengers to/from stations towards Edinburgh, as it is booked to pick up/set down at some stations.[12] [13] [14]

See also

Bibliography

External links

Notes and References

  1. Book: Brailsford . Martyn . Railway Track Diagrams 1: Scotland & Isle of Man . 6th . December 2017 . 1987 . Trackmaps . Frome . 978-0-9549866-9-8 . Gaelic/English Station Index .
  2. Web site: Deaves . Phil . Railway Codes . railwaycodes.org.uk . 27 September 2022.
  3. Web site: 10 of the best railway stations in Britain. 1 October 2017. the Guardian.
  4. Book: TRACKatlas of Mainland Britain: A Comprehensive Geographic Atlas Showing the Rail Network of Great Britain . Platform 5 Publishing Ltd . 2017 . 978 1909431 26 3 . Bridge . Mike . 3rd . Sheffield . 88, 90.
  5. Web site: Rannoch station on OS Six-inch map Argyll and Bute Sheet XXXIV.SW (includes: Fortingall; Lismore and Appin). 1900. National Library of Scotland . 8 June 2020.
  6. McRae (1997), page 11
  7. Book: Thomas, John . The West Highland Railway . David and Charles . 1965 . 0-7153-7281-5 . Newton Abbot.
  8. (- still marked on OS maps
  9. Web site: Rannoch Station . 2023-06-12 . Explore Kinloch Rannoch & Highland Perthshire . en-GB.
  10. Web site: National Rail Enquiries - . 2022-09-02 . www.nationalrail.co.uk.
  11. Web site: Estimates of station usage ORR Data Portal . 2022-09-02 . dataportal.orr.gov.uk.
  12. eNRT May 2022 Edition, Table 218
  13. eNRT December 2021 Edition, Table 218
  14. eNRT May 2022 Edition, Table 220