Ranger Uranium Mine Explained

Ranger
Width:300px
Pushpin Map:Northern Territory
Pushpin Label:Ranger Uranium Mine
Pushpin Map Caption:Location in the Northern Territory
Coordinates:-12.6833°N 187°W
Place:Kakadu National Park
Subdivision Type:Territory
State/Province:Northern Territory
Country:Australia
Owner:Energy Resources of Australia Limited
Official Website:http://www.energyres.com.au/
Products:Uranium oxide (U3O8)
Financial Year:Mine lifetime
Amount:132,000 tonnes U3O8
Opening Year:1980
Closing Year:2021
Discovery Year:1969
Module:
Stroke-Colour:
  1. C60C30
Stroke-Width:3
Marker:industrial
Marker-Colour:
  1. 1F2F57
Zoom:11

The Ranger Uranium Mine was a uranium mine in the Northern Territory of Australia. The site is surrounded by, but separate from Kakadu National Park, 230 km east of Darwin. The orebody was discovered in late 1969, and the mine commenced operation in 1980, reaching full production of uranium oxide in 1981 and ceased stockpile processing on 8 January 2021. Mining activities had ceased in 2012.[1] [2] It was owned and operated by Energy Resources of Australia (ERA), a public company 86.33% owned by Rio Tinto Group, the remainder held by the public. Uranium mined at Ranger was sold for use in nuclear power stations in Japan, South Korea, China, UK, France, Germany, Spain, Sweden and the United States.

The original Ranger 1 orebody was mined out by the end of 1995, although some ore remained stockpiled. A second orebody, Ranger 3, began mining in 1997. Both were open-pit mines. Mining finished at Ranger in late 2012, efforts to exploit Ranger 3 Deeps failed, and the mine plant processed some stockpiled ore until January 2021. ERA has tenure and access to the site, principally for rehabilitation activities, until 8 January 2026.[3]

Discovery

The Ranger uranium orebody, the richest in the southern hemisphere, was discovered in late 1969, when an aerial radiometric survey conducted by Geophysical Resources Development Co., a company based in Sydney, on contract to Noranda Aluminum, detected a large spike in gamma radiation when passing over Mount Brockman, known as Djidbidjidbi to the Mirarr traditional owners of the area. The instrument that detected the anomaly was a Nuclear Enterprises gamma ray spectrometer using a Thallium doped Sodium Iodide cylindrical crystal. At time of discovery the aircraft was flying at an altitude of . The anomaly could still be detected at almost 915m (3,002feet). The crew members on board were Bill Hay, the pilot, Harvey Morton, the navigator and Frank Lanza, the instruments operator, who first recognised the significance of the anomaly.[4]

Ranger Uranium Environmental Inquiry

In 1975, Gough Whitlam appointed Justice Russell Fox, a judge of the Supreme Court of the Australian Capital Territory, to lead an inquiry into the environmental dangers posed by mining uranium in the Northern Territory and the associated risks of exporting it, including those of nuclear proliferation. The inquiry produced two reports, published in 1976[5] and 1977.[6]

Ore bodies

The Ranger No. 1 and Ranger No. 3 ore bodies occur in the Cahill Formation, consisting of Lower Proterozoic metasediments, located in the Alligator Rivers Uranium Field.[7] [8] The mine commenced operation in 1980, reaching full production of uranium oxide in 1981. Owing to the environmental sensitivity of the site, a special statutory authority, the Supervising Scientist, was created to provide oversight of the operation and conduct environmental research in the region.

Ranger mine covers two of a line of uranium orebodies that extend from near Nourlangie Rock in Kakadu north-eastwards to Koongarra, underneath Mount Brockman, then northwards through the Ranger One line of orebodies (in order Number 2, Number 1, and Number 3), then via Hades Flat, where there is uranium mineralisation, to Jabiluka where the line turns westward through the Barote and Ranger 4 orebodies. The mine covers No 1 Orebody and No 3 Orebody. No 2 Orebody was excluded from the mining lease at the request of the traditional owners and included in Kakadu National Park. From Ranger 4 the line again turns northwards and then swings westward round an Archaean basement dome before turning south towards Nourlangie Rock again. Uranium mineralisation is known at several other places along this line but has never been explored in detail because of the creation of Kakadu. The name 'Ranger' for the series of discoveries made by Geopeko, the exploration arm of Peko-Wallsend, in the period 1969 to 1972, was thought up by Judy Ryan, the wife of the geologist in charge of the program. Koongarra and Jabiluka were retained by the companies that found them: Noranda Australia and Pancontinental Mining respectively, although since sold to other parties. The other discoveries were enclosed in the National Park.

ERA was named Explorer of the Year at the sixth annual Australian Mining Prospect Awards held in Sydney in November 2009. During 2008, ERA's exploration programme identified a significant mineral resource adjacent to the operating Ranger 3 pit. The area, known as Ranger 3 Deeps, ranked among the world's most significant new uranium discoveries of recent years.[9]

Ranger 3 Deeps

As production from the existing mines declined in the early 2010s, ERA constructed a $120 million Ranger 3 Deeps exploration decline (tunnel) to conduct close spaced underground exploration drilling and explore areas adjacent to the Ranger 3 Deeps resource. This was never developed as of 2024. The Ranger 3 Deeps mineralised zone contains an estimated resource of 32620t of uranium oxide, comprising measured, indicated and inferred categories totalling 11.9 million tonnes of ore grading 0.274% U3O8.[10]

New permissions would have been needed to mine this resource. In parallel with the construction of the exploration decline, ERA began a $57 million project to prepare a Prefeasibility Study into the potential development of a Ranger 3 Deeps underground mine. This Study determined the economic viability of the project, optimal mining methods, and metallurgical performance and production rates. Environmental studies were also conducted and published. ERA consulted further with the Gundjeihmi Aboriginal Corporation as a component of a broader social impact assessment.[11]

ERA formally commenced the statutory approval process for the proposed Ranger 3 Deeps underground mine in January 2013 with the submission of a referral to the Commonwealth Department of Sustainability, Environment, Water Population and Communities under the Environmental Protection and Biodiversity Control Act 1999. At the same time, ERA separately lodged a notice of intent with the Northern Territory Environment Protection Authority under the Northern Territory Environmental Assessment Act.[12] However, as reported by World Nuclear News in 2021, "Traditional owners of the land covered by the Ranger uranium project informed ERA in 2015 that they did not support any extension of the authority to mine in the project area. ERA decided not to proceed with a final feasibility study at Ranger 3 Deeps, which is an extension of the Ranger orebody. ERA today said it now expects to begin work to close the 2.2 km, 400-500 m deep Ranger 3 Deeps decline, excavated as part of those studies, during the first-half of this year."[13]

Ore processing

Ore was crushed, ground, then leached with sulphuric acid. Uranium was removed using kerosene with amine then stripped with ammonium sulphate solution and gaseous ammonia. Ammonium diuranate was precipitated by increasing the pregnant solution pH, and converted to uranium oxide (U3O8) in a furnace.[14]

In early 2006, ERA announced an expansion to the processing plant which allowed production to extend into lower-grade ore and in November 2006 the company announced plans to invest in a laterite processing plant, which would allow it to process ore with a high clay content that has been stockpiled since the mine began operating. This ore had been already included in stated reserves. The laterite processing plant contributed 400 tonnes of uranium oxide per year from 2008 until closure.[15]

Water management

Water management is a critical component of ERA's business, and between 2009 and 2012, it completed water management projects for a total cost of $82 million.[16] This included surface water interception trenches around stockpiles to protect local waterways, installation of continuous real-time monitoring stations, and additional ground water bores to augment the extensive ground water monitoring programme.

In addition, ERA completed a 2.3-metre life of the Tailings Storage Facility, constructed a new pond water retention pond to store up to one gigalitre of pond water, and installed contingency water pumping system between the Tailings Storage Facility and Pit 3.From 2012 to 2014, ERA expected to expend a total of $316 million in various water management projects including the $220 million Brine Concentrator Project.[16] Brine Concentrators use thermal energy to evaporate water, which is subsequently condensed and discharged as clean distilled water.

The Brine Concentrator had the capacity to produce 1.83 gigalitres of clean water per year through the treatment of process water.[17] Hatch was appointed EPCM contractor for the Brine Concentrator project. It was successfully commissioned in November 2013 with a budget of AUD $220 Million dollars.[18]

In 2012, ERA and the Mirarr Traditional Owners represented by the Gundjeihmi Aboriginal Corporation (GAC), conducted a jointly facilitated independent expert review of the quality of surface water around the Ranger Project Area. The Independent Surface Water Working Group consisted of representatives from ERA, GAC, the Supervising Scientists Division and the Northern Land Council. Over a six-month period, the working group examined the impacts, monitoring and reporting of surface water flowing from the Ranger mine.

The working group agreed in findings released in March 2013 that the surface water management and regulatory systems in place at the Ranger mine were of a very high standard.[19] Going forward, the Group agreed an action plan to ensure that surface water management systems at Ranger remained "best leading practice".

Safety breaches and controversy

Environment Australia (an agency of the Government of Australia) have documented over 200 environmental incidents since 1979. The great majority of these were minor, but the significant ones are detailed below.[20] In 2013, a spokesperson from the Public Health Association of Australia claimed that there had been a hundred safety incidents linked to the mine in the thirty years prior.[21]

In May 2005 the company was convicted for breaching environmental guidelines - the first such prosecution of a mining company in the Northern Territory, relating to accidental radiological exposure to ERA employees.[22] Radioactively contaminated process water had entered the drinking water supply and some workers drank and washed in it. Dozens of mine employees were found to have showered in and consumed water containing 400 times the legal limit of uranium.[23] The maximum radiation exposure of workers was likely to have been much less than the regulatory limit, and no harmful long-term health effects are likely.[24]

Other incidents involving decontamination of vehicles have been identified. When the work-for-welfare mechanic in Jabiru opened the engine bay, he was unaware of the nature of the mud and dirt which fell on the floor. The court heard that in the following weeks, after he had swept the material outside his shed, his children played and built sandcastles in mud contaminated with uranium.[25]

Another significant controversy over Ranger's environmental impact is the public legal confrontation over releases into Magela Creek in the 1995 wet season. More recently, the ARRAC report from 2002 details a major leak of about 2 megalitres of potentially polluted water, over a number of months.

In 2007, water breached a retention pond, overflowing back into the pit. The original authorisation required that this water be contained at all times. In 2006, water management systems were disrupted by Cyclone Monica.

In May 2010, it was reported that a tailings dam may have released millions of litres of radioactive water into world heritage-listed wetlands in Kakadu National Park, home to about 500 Aboriginal people.[26]

In November 2013, four drums previously used to transport yellowcake were found in a rural area of Darwin. The company recovered the drums amid concerns about the potential spread of radioactive contamination.

On 7 December 2013 there was an incident at a mine site inside Kakadu National Park, with about a million litres of slurry, comprising crushed ore and acid, believed spilled, workers evacuated and production shut down. A leaching tank containing the slurry burst at about 1am. The spilled material was entirely contained within the safety bunds and no material leaked into the wider ecosystem.[27] [28]

See also

References

External links

Notes and References

  1. Web site: Regulating the Ranger Uranium Mine . Department of Industry, Science, Energy and Resources . 17 January 2022 . Canberra . 22 December 2021.
  2. News: Ranger mine ends processing operations . 17 January 2022 . World Nuclear News . World Nuclear Association . 8 January 2021 . London.
  3. Web site: 2020 Ranger Mine Closure Plan . Energy Resources of Australia Ltd . 17 January 2022 . 3-12 . October 2020.
  4. Web site: Buglione . Sonia . One life, one story - Part 1 - Francesco Lanza . SBS Italian . 17 January 2022 . Crows Nest, NSW . 11 August 2016.
  5. Ranger Uranium Environmental Inquiry & Fox, R. W. (1976). Ranger Uranium Environmental Inquiry : first report Retrieved November 12, 2021, from http://nla.gov.au/nla.obj-1474163294
  6. Ranger Uranium Environmental Inquiry & Fox, R. W. (1977). Ranger uranium environmental inquiry, second report, May, 1977 Retrieved November 12, 2021, from http://nla.gov.au/nla.obj-2203646406
  7. Book: Zoellner. Tom. Uranium. 2009. Penguin Books. New York. 9780143116721. 180–181.
  8. Book: Nash. J. Thomas. Frishman. David. Chemical Data and Statistical Interpretations for Rocks and Ores from the Ranger Uranium Mine N.T., Australia, USGS Open-File Report 83-239. 1983. US Government. 2.
  9. Web site: Ranger 3 Deeps exploration decline - Application for approval . Energy Resources of Australia . 25 October 2021.
  10. Web site: Ranger 3 Deeps Draft Environmental Impact Statement . Northern Territory Environment Protection Authority . Energy Resources of Australia Ltd . 17 January 2022 . Darwin NT . 3 October 2014.
  11. Web site: Ranger 3 Deeps - Energy Resources of Australia.
  12. https://ntepa.nt.gov.au/your-business/public-registers/environmental-impact-assessments-register/terminated-assessments/assessments-on-hold-register/ranger-3-deeps-underground-mine | available here.
  13. https://www.world-nuclear-news.org/Articles/Processing-ends-at-Ranger-mine
  14. Web site: Ranger . Australia's Uranium Mines . World Nuclear Association . 12 January 2009 . 2 November 2019 . https://web.archive.org/web/20191102061842/https://www.world-nuclear.org/information-library/country-profiles/countries-a-f/australia.aspx . dead .
  15. Web site: ERA Approves Laterite Processing Plant . Energy Resources of Australia . 2007-01-16 . ASX announcement . 29 November 2006 . dead . https://web.archive.org/web/20110524195453/http://www.energyres.com.au/showpdf.php3?id=236 . 24 May 2011.
  16. Energy Resources of Australia 2012 Annual Report, p. 32
  17. Energy Resources of Australia 2012 Annual Report, p. 18
  18. Web site: EPCM Services. 2014. Digiscend.com. 2014-08-21.
  19. Web site: Media Releases - Energy Resources of Australia.
  20. Web site: Regulating the Ranger, Jabiluka, Beverly and Honeymoon uranium mines - Appendix 6. Senate Environment, Communications, Information Technology and the Arts Committee. 14 October 2003.
  21. Web site: 2013-11-21 . Ranger Uranium Mine asked to explain safety breach . 2023-01-23 . Australasian Mine Safety Journal.
  22. John Carroll v Energy Resources of Australia [2005] NTMC 067
  23. Web site: Opray. Max. 2021-08-14. Kakadu mining and radiation. 2021-08-14. The Saturday Paper. en.
  24. Web site: Contamination incidents at Ranger mine . Department of the Environment and Heritage annual report 2004-05 . . 2005 . 1441-9335 . 2007-01-15.
  25. News: ERA fined $150,000 over contamination . 1 June 2005 . 2007-01-15 . The Age.
  26. Web site: Kakadu being poisoned by Rio Tinto mine, group warns. MURDOCH. LINDSAY. 24 May 2010. Brisbane Times. 25 May 2010.
  27. Web site: Radioactive acid spill at ERA Ranger mine in Kakadu. 7 December 2013. The Australian.
  28. News: Uranium mine spill near Jabiru, Northern Territory, locals fear for Kakadu National Park. 7 December 2013. ABC News. Australian Broadcasting Corporation. 7 December 2013.