Ranaghat–Krishnanagar City–Lalgola line explained

Box Width:28em
Ranaghat–Krishnanagar City–Lalgola line
System:Electrified
Status:Operational
Locale:West Bengal
Start:Ranaghat
End:Lalgola
Stations:35
Open: (Aistala Ghat–Shantipur–Krishnanagar City NG line)
(Ranaghat–Krishnanagar City–Krishnapur BG line)
Owner:Indian Railway
Operator:Eastern Railway
Depot:Ranaghat EMU Carshed
Linelength:1550NaN0 - Ranaghat–Krishnanagar City–Lalgola
360NaN0 - Ranaghat–Shantipur–Krishnanagar City
Tracks:2
Gauge: broad gauge
Old Gauge: - Aistala Ghat–Nabadwip Ghat section
Electrification:Yes
Speed:up to
Map State:collapsed

The Ranaghat–Krishnanagar City–Lalgola line is a 155km (96miles) long broad gauge railway line which connects Ranaghat Junction in the Nadia district with Lalgola in the Murshidabad district of the Indian state of West Bengal. The line runs up to the Bangladesh border near the Ganga river and is a part of the Sealdah railway division of the Eastern Railway zone.[1]

Services

There are three express services, which connect Lalgola with Kolkata (Hazarduari Express and Dhano Dhanye Express) and Sealdah (Bhagirathi Express), that traverse the entire length of the line connecting major towns like Krishnanagar and Berhampore in between.[2] These services are further augmented by locomotive hauled passenger trains that stop at every station on the line.[3] In 2012, daily MEMU services were started between Sealdah and Lalgola.[4]

The Ranaghat–Krishnanagar City section along with the Kalinarayanpur–Shantipur–Krishnanagar City loop line is a part of the suburban section of the Kolkata Suburban Railway linking with the system at Ranaghat Junction.[5] The Sealdah–Ranaghat–Krishnanagar City section is served with total pairs of 231 Daily and 187 Sunday EMU services. There are also 3 pairs of EMU services between Ranaghat and Krishnanagar via the Shantipur Loop line. Shantipur is further connected to Bangaon via the Ranaghat–Bangaon branch line with 2 pairs of daily EMU services.

A majority of the Sealdah–Ranaghat–Krishnanagar City section is served by 9-car EMU rakes from the Narkeldanga EMU Carshed. The Ranaghat EMU Carshed, commissioned in 2007, mainly serves the Bangaon–Ranaghat–Shantipur–Krishnanagar City section and the Ranaghat–Lalgola section, where EMU services were introduced from 2017, with 12-car EMU and MEMU rakes.

History

Pre–Partition

Ranaghat–Krishnanagar Light Railway

While the main line of the eastern section of the Eastern Bengal Railway was opened from Calcutta to Kushtia via Ranaghat in 1862, it bypassed Krishnanagar and Shantipur, two very prominent heritage centers of art, culture and learning of the 18th and 19th century Bengal.[6] [7] To resolve this issue, Martin's Light Railways constructed a 20.25miles long, 2 ft 6 in narrow gauge line from Aistala Ghat, on the west bank of the Churni river, near Ranaghat to Krishnanagar via Shantipur in 1899 which was known as the Ranaghat–Krishnanagar Light Railway.[8] EBR further constructed a 1.6miles long broad gauge line from Ranaghat station to Churni Ghat, known as the Churni Extension railway, from where a direct ferry connection to Aistala Ghat was established.[9] The administration of the Ranaghat–Krishnanagar Light Railway passed onto EBR in 1904.[10]

Murshidabad Branch Railway

EBR opened the Ranaghat–Murshidabad–Bhagwangola–Krishnapur branch line in 1905. This was known as the Murshidabad Branch Railway. This was further extended to Lalgola Ghat on the south bank of the Ganges in 1907 and the line came to be known as the Lalgola Ghat Branch Railway.[11] In 1909, a metre gauge line from Katihar to Godagari Ghat (on the north bank of the Ganges), known as the Godagari Ghat Branch Railway was built, from where a ferry connection was established to Lalgola Ghat, thus providing a direct link from Katihar to Calcutta.[12] [13]

Further extensions

in 1925. a broad gauge extension was built from Churni Bridge (present day Kalinarayanpur Junction railway station) to Shantipur thus establishing direct connectivity from Sealdah to Shantipur.[14] This made the Aistala Ghat–Shantipur section and the Churni Extension Railway redundant following which they were dismantled and the line was known as Shantipur–Krishnanagar Light Railway.[15]

The Shantipur–Krishnanagar Light Railway was extended up to Nabadwip Ghat on the east bank of the Bhagirathi river, in 1926 and a direct ferry connection was established to Nabadwip Dham, an important pilgrimage centre of Bengal.[16]

In 1928, a 2.01miles long branch line was constructed from Azimganj on the B.B. loop line to the Nashipur Road station on the Ranaghat–Lalgola line via a bridge across the Bhagirathi river for carrying stone freight traffic.[17] This bridge was destroyed in the Second World War, leading to connectivity problems between the twin cities of Azimganj and Jiaganj located on the opposite sides of the Bhagirathi river.[18]

Post-partition

Following the partition of India in 1947, the link between Sealdah and Katihar via this line was snapped[19] affecting the connection of South Bengal with North Bengal, North Bihar and Assam due to which the ferry connection was moved to between Sakrigali Ghat railway station in the Sahibganj Loop to Manihari Ghat railway station in the Katihar–Teznarayanpur branch line.[20] The Katihar–Singhabad section was converted to broad gauge in 1962 with the construction of the new Howrah–New Jalpaiguri line.[21] [22]

The line along with other EBR lines came under the jurisdiction of the Sealdah railway division of the Eastern Railway post zonal re-organisation in 1952.[23]

Gauge conversion & Nabadwip Dham Connection

The Shantipur–Krishnanagar City narrow gauge line was sanctioned for gauge conversion to broad gauge in 2001.[24] The line closed for gauge conversion in 2010 which was completed and the new line was commissioned on 7 February 2012.[25] [26] [27]

The Krishnanagar–Nabadwip Ghat section was sanctioned for gauge conversion in 2007 along with a planned extension of the line to on the B.B. loop line with a bridge over the Bhagirathi.[28] While the gauge conversion of the section has been completed from Krishnanagar City to Amghata railway station it has not been commissioned because of unauthorized crossings and the stretch between Amghata and Nabadwip Ghat has been blocked due to a temple and a mosque being on the alignment.[29] Similarly, while the superstructure of the bridge between the Nabadwip Ghat and railway stations over the Bhagirathi is ready, tracks leading to the bridge haven't been built because of land acquisition problems and protests by the locals.[30] [31]

On 15 October 2023, a trial run of a goods train was conducted between the and Amghata railway stations in order to check the heath of the unutilized section of the new gauge converted line. It is planned to short terminate trains at Amghata till the land acquisition problems between the Amghata–Nabadwip Ghat section are sorted out.[32] [33] [34]

Nashipur rail bridge

See main article: Nashipur Rail Bridge. A new railway bridge between Azimganj and Murshidabad, across the Bhagirathi river was sanctioned in 2001 owing to the long time demand of the people of the area.[35] While the superstructure of the bridge was completed by 2013, since the approach roads couldn't be built due to land acquisition problems and local protests related to employment, the tracks leading to the bridge couldn't be constructed.[36] [37] [18] [38]

The hurdles related to land acquisition & employment were finally cleared & work for laying the tracks was started on December 2022.[39] [40] [41] Track renewal work by replacing the old railway panels was underway as of September 2023 and the entire work is expected to be completed by March 2024.[42] Meanwhile the area near the bridge has become a popular picnic spot.[43]

Once commissioned, the Indian Railways plans to use the bridge for North Bengal bound trains from Sealdah like Darjeeling Mail as it provides a shorter route between Sealdah and New Jalpaiguri leading to significant savings in cost and time.[44] [45]

Track

The Ranaghat–Krishnanagar City–Lalgola section along with the Ranaghat–Shantipur section is a double line section while the Shantipur–Krishnanagar City section is a single line section.

Electrification

The Ranaghat–Krishnanagar City and the Ranaghat–Shantipur section were electrified in 1963–64.[46] The 128km (80miles) long Krishnanagar City–Lalgola stretch was electrified in 2007.[47] The single electrified line of the Shantipur–Krishnanagar City section was commissioned after gauge conversion in 2012.

EMU Carsheds

The Ranaghat–Krishnanagar City section of the line is primarily served by 9-car EMU rakes from the Narkeldanga EMU Carshed with a few 12-car EMU rakes from Ranaghat EMU Carshed as well. Further to this most 12-car EMU rakes from Ranaghat EMU Carshed serve in the Ranaghat–Lalgola section and the Krishnanagar City–Shantipur–Ranaghat–Bangaon section. The Ranaghat EMU Carshed also maintains 12-car MEMU rakes which started serving from Sealdah to Lalgola in 2012.

While the section was initially served by the Narkeldanga EMU carshed which opened on 1963, due to the increasing traffic requirements in the Ranaghat–Gede, Ranaghat–Bangaon, Ranaghat–Shantipur–Krishnanagar City and Ranaghat–Lalgola sections owing to the electrification and gauge conversions of various lines, the Ranaghat EMU carshed was commissioned in 2007. EMU services were introduced between Ranaghat and Lalgola in 2017.

As of January 2024, the Narkeldanga carshed had 28 9-car EMU rakes, a few of which served the Sealdah South section mostly via the Circular line, while rest served the Sealdah North section lines. The Ranaghat EMU carshed contains 1 9-car EMU rake, 16 12-car EMU rakes (of which 1 is a 3 phase EMU) and 8 12-car MEMU rakes. 4 of the 12-car MEMU rakes are three phase MEMU.

Routes and stations

Stations

Names in bold indicate that the station is a major stop or an important interchange/terminal station.

Names in italics indicate that the station is now defunct

Ranaghat–Krishnanagar City–Lalgola main line

Ranaghat–Krishnanagar City–Lalgola main line
Distance from Ranaghat Junction (km)Station NameStation CodeExisting ConnectionsStation Category[48]
10RHARanaghat–Bangaon line / Sealdah–Ranaghat–Gede lineSG-2
24KLNPShantipur loop lineSG-3
38BIJSG-3
411THPSG-3
516BDZSG-3
621JKLHG-3
726KNJShantipur loop line SG-2
833BPDNSG-6
939DHUNSG-6
1044MGMNSG-6
1154BTYNSG-5
1258SVHNSG-6
1366DEBNSG-5
1471PCXNSG-6
1577PLYNSG-5
1682SRJNHG-3
1786REJNSG-6
1895BEBNSG-5
19101BFTNSG-6
20104SGVNSG-6
21108NBPHHG-3
22113BPCNSG-4
23116CSZNSG-5
24124 JunctionMBBAzimganj Jn. Link Line NSG-5
25129NSO
26132JJGNSG-5
27137SBNMHG-3
28144BQGNSG-5
29147PRTLHG-3
30153KRPNSG-5
31155LGLNSG-5
32160Lalgola GhatLGG
† End of suburban section of Kolkata Suburban Railway

Shantipur loop line

Shantipur loop line
Distance from Ranaghat Junction (km)Station NameStation CodeExisting ConnectionsStation Category[49]
10RHARanaghat–Bangaon line / Sealdah–Ranaghat–Gede lineSG-2
24KLNPRanaghat–Lalgola lineSG-3
38HBESG-3
412FLUSG-3
516BTKBHG-3
621STBSG-3
827DTGHG-3
733KNJRanaghat–Lalgola lineSG-2
† End of suburban section of Kolkata Suburban Railway

Planned extensions

Krishnanagar–Karimpur–Berhampore line

There have been multiple demands for a new railway line from Krishnanagar to Berhampore via Karimpur and Domkal, two major towns in the Nadia and Murshidabad districts of West Bengal.[50] [51] [52] While multiple surveys have been conducted for the proposed railway line since 1905, it was not sanctioned for construction.[53] In January 2023, the Indian Ministry of Railways has given an approval to start survey work on the Krishnanagar–Karimpur railway line again, at a cost of Rs.2 crore.[54] As per the plans, the survey work started in August 2023.[55]

Two new railway line projects, Dhubulia–Charatala and Krishnanagar City–Chapra have been sanctioned in the railway budget in 2001 and 2002 respectively. While the final line survey for both the newly planned lines have been completed, there has been no further progress made in the project.

Notes and References

  1. Web site: Sealdah Division System Map. 11 November 2021.
  2. Web site: Arrivals at LGL/Lalgola - Express trains. 1 February 2022. India Railinfo.
  3. Web site: Arrivals at LGL/Lalgola - Passenger Trains. 1 February 2022. India RailInfo.
  4. Web site: Highlights of TRS Organisation, Sealdah division, Eastern Railway . 10 January 2024.
  5. Web site: Details of Operating Department: Sealdah Division, Eastern Railway. 30 November 2021.
  6. Web site: Administration Report on Railways 1918. 28 November 2021.
  7. Web site: 5 December 2020. The Santipur Local – Part 2. 1 February 2022. GetBengal.
  8. https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n56/mode/1up “Administration Report on Railways 1918” page48-49, pdf page 56
  9. https://archive.org/stream/BombayBarodaAndCentralIndiaRailwaySystem/Bombay_Baroda_And_Central_India_Railway_System#page/n51/mode/1up “Administration Report on Railways 1918” page 42 (pdf51)
  10. Web site: J. H. E. Garrett. Nadia, Bengal District Gazetteers (1910). live. https://web.archive.org/web/20121028190255/http://irfca.org/docs/history/nadia.html. 28 October 2012. 2012-02-10. IRFCA.
  11. http://www.forgottenbooks.com/readbook_text/BejvG_1000695561/163 "Bengal District Gazetteer" / Mukshidabad by L S S O’Malley, Indian Civil Service, Calcutta; Pages 150-151"
  12. [iarchive:BombayBarodaAndCentralIndiaRailwaySystem/page/n55/mode/1up|“Administration Report on Railways 1918” page 47 (pdf56)]
  13. Book: Assam Information. 1971. Directorate of Information & Public Relations.. en.
  14. https://archive.org/details/in.ernet.dli.2015.36650 “Administration Report on Railways 1937” page 71 (pdf98)
  15. Web site: 5 December 2020. The Santipur Local – Part 2. 1 February 2022. GetBengal.
  16. https://archive.org/details/in.ernet.dli.2015.36650 “Administration Report on Railways 1937” page 78 (pdf105)
  17. https://archive.org/details/in.ernet.dli.2015.36650 “Administration Report on Railways 1937” page 70 (pdf95)
  18. Web site: Passengers association call for hunger strike for railway bridge. The Times of India. 11 October 2021.
  19. Book: Assam Information. 1971. Directorate of Information & Public Relations.. en.
  20. Web site: Katihar Division – North East Frontier Railway. 2 February 2022. North East Frontier Railway.
  21. Web site: Speech of Shri Jagjivan Ram introducing the Railway Budget for 1961-62 on, 15th February, 1961. 4 February 2022. Indian Railways.
  22. Web site: Speech of Sardar Swaran Singh: Introducing the Railway Budget for 1963-64, on 19t h February, 1963. 4 February 2022. Indian Railways.
  23. http://www.er.indianrailways.gov.in/view_section.jsp?lang=0&id=0,6,442,452 Brief Detail of Sealdah Division
  24. Web site: Ongoing projects Eastern Railway. 2 February 2022. Eastern Railway.
  25. Web site: List of sanctioned projects commissioned – Eastern Railway. 2 February 2022. Eastern Railway.
  26. Web site: Brief status of sanctioned projects – Eastern Railway. 2 February 2022. Eastern Railway.
  27. Web site: Mamata rolls out rly sops for Nadia. dead. https://archive.today/20120710144906/http://articles.timesofindia.indiatimes.com/2010-01-08/kolkata/28141187_1_narrow-gauge-broad-gauge-railway-jobs. 2012-07-10. 2012-02-10. The Times of India.
  28. Web site: Ongoing projects Eastern Railway. 2 February 2022. Eastern Railway.
  29. Web site: Brief status of sanctioned projects – Eastern Railway. 2 February 2022. Eastern Railway.
  30. Web site: Nabadwip Dham-Sealdah Rail Link Work Suspended Over Land Dispute. 2022-02-02. News from Nadia. 18 January 2019. en-US.
  31. Web site: Trinamul accused of double standards as party leaders press Nadia villagers to give up land. 2022-02-02. The Telegraph.
  32. Web site: সংবাদদাতা . নিজস্ব . আমঘাটা অবধি লাইন চালু হবে, ছুটল ওয়াগন . 2024-01-10 . www.anandabazar.com . bn.
  33. Web site: 2023-10-22 . ১৩ বছর পর কৃষ্ণনগর–নবদ্বীপ লাইনে ছুটল রেল ইঞ্জিন, দ্রুতই চালু হবে জানালেন সাংসদ . 2024-01-10 . Hindustantimes Bangla . bn.
  34. Web site: ১৩ বছর পর চালু নবদ্বীপ-কৃষ্ণনগর ট্রেন লাইন, বন্ধ রেললাইনে ছুটল ট্রেন . 2024-01-10 . Eisamay . bn.
  35. Web site: The Nashipur syndrome. 2022-02-02. The Week. en.
  36. Web site: The Nashipur syndrome. 2022-02-02. The Week. en.
  37. Web site: Left landowners play spoilsport in railway project. dead. https://web.archive.org/web/20120614104446/http://www.thestatesman.net/index.php?option=com_content&view=article&id=320427&catid=72. 14 June 2012. 2012-02-10. The Statesman, 19 February 2010. dmy-all.
  38. Web site: ananda . abp . 2022-01-30 . ৮ বছরেও তৈরি হয়নি মুর্শিদাবাদ-আজিমগঞ্জ রেলপথ, 'চাকরির দাবিতে আন্দোলনে সমস্যা', দাবি রেলের . 2024-01-10 . bengali.abplive.com . bn.
  39. Web site: 2022-12-01 . দীর্ঘ প্রতিক্ষার পর অবশেষে কাজ শুরু হল নশিপুর রেলব্রিজের . 2024-01-10 . News18 বাংলা . bn.
  40. Web site: Work on Nashipur railway bridge resumes . 2024-01-10 . www.telegraphindia.com . en.
  41. Web site: জমি জট কেটে যাওয়ায় আড়াই দশক পার, নশিপুর রেলব্রিজ দিয়ে ছুটবে ট্রেন . 2024-01-10 . Eisamay . bn.
  42. Web site: 2023-09-05 . উত্তরবঙ্গ আরও কাছে এসে যাবে, সফল ট্রায়াল রান নশিপুর রেল ব্রিজে . 2024-01-10 . News18 বাংলা . bn.
  43. Web site: সংবাদদাতা . আনন্দবাজার অনলাইন . নশিপুর রেলসেতু এখন পর্যটন কেন্দ্র! ভিড় উপচে পড়ছে রোজ . 2024-01-10 . www.anandabazar.com . bn.
  44. Web site: Darjeeling Mail gears up for short route, cheaper fare. 11 October 2021.
  45. News: 2023-12-08 . Darj Mail set to run on new route from March, save travel time by 90 mins . 2024-01-10 . The Times of India . 0971-8257.
  46. Web site: History of Electrification . . 2012-02-10 . https://web.archive.org/web/20071225163912/http://irfca.org/docs/electrification-history.html . 25 December 2007 . dead .
  47. Web site: Important Landmarks of Indian Railways Electrification. 2022-02-03. Central Organization for Railway Electrification (CORE).
  48. Web site: Category of stations - Eastern Railway. 24 December 2021.
  49. Web site: Category of stations - Eastern Railway. 24 December 2021.
  50. Web site: 9 February 2017. Regarding demand for Behrampore-Karimpur via Domkal Islampur new railway line in Murshidabad district in West Bengal. 7 February 2022. India Kanoon.
  51. Web site: Regarding demand for Behrampore-Karimpur via Domkal Islampur new railway line in Murshidabad district in West Bengal.. 7 February 2022. Parliament of India, Lok Sabha, Digital Library.
  52. Web site: 2018-03-22. Demand For Rail Link Revived In Karimpur. 2022-02-07. News from Nadia. en-US.
  53. Web site: Bengal Polls 2021: Rail link remains elusive to Karimpur. 2022-02-07. The Telegraph Online.
  54. Web site: Biswas . Amitabh . 4 January 2023 . করিমপুরে রেল চলার সমীক্ষা, পোস্ট মহুয়ার . 10 September 2023 . www.anandabazar.com . Anandabazar Patrika . bn . Karimpur.
  55. Web site: 8 September 2023 . দু’মাসে দু’বার সমীক্ষা, দিনের আলো দেখবে কি কৃষ্ণনগর-করিমপুর রেল প্রকল্প? প্রশ্ন দুই জনপদে . 10 September 2023 . www.anandabazar.com . Anandabazar Patrika . bn . Krisnanagar.