Ramadan-class missile boat explained

The Ramadan-class missile boat are a series of six missile boats that have been in service with the Egyptian Navy since 1981, which were constructed in the United Kingdom. The first ship was launched in 1979 and entered service in 1981. Four remain in service with two laid up.

Design and description

Based on a British design, the Ramadan class measures 52m (171feet) long overall and between perpendiculars with a beam of and a draught of . The missile boats have a standard displacement of 307t and a full load displacement of . The vessels are powered by four MTU 20V538 TB 91 diesel engines turning four propeller shafts creating 18000bhp and a maximum speed of 37kn. The ships have storage for of oil fuel giving them a range of 2000nmi at .

The Ramadan-class missile craft are armed with two twin launchers for Otomat surface-to-surface missiles (SSMs). They also mount one OTO Melara 76mm gun forward and a pair of twin-mounted Breda anti-aircraft guns. They are equipped with Marconi S820 air and surface search radar, S180 radar and two ST802 fire control radars. The two ST802 radars work in tandem with the Marconi Sapphire fire control system alongside two Lawrence Scott optical directors. The ships are also equipped with a Decca-Racal Cygnus jammer, two MEL Protean chaff dispensers and Cutlass intercept radar. These all supply information to the Ferranti CAAIS automated data system. They have a complement of 40.

Ships in class

Construction data
NumberName BuilderLaid downLaunchedCommissionedStatus
561, 670RamadanVosper Thornycroft, Portchester, United Kingdom22 September 19786 September 197920 July 1981Laid up
562, 674 El Kadesseya 23 February 197931 January 198015 September 1981Laid up
563, 672 Khyber23 April 197919 February 19806 April 1982Active
564, 676 El Yarmouk15 May 197912 June 198018 May 1982Active
565, 678Badr29 September 197917 June 198117 June 1982Active
566, 680 Hettein29 February 198025 November 198028 October 1982Active

Construction and career

The six ships were ordered on 4 September 1977 from Vosper Thornycroft of the United Kingdom. After construction the first pair sailed together for Egypt and arrived on 13 November 1981. The second pair arrived on 23 July 1982 and the third pair in December 1982. In 1998, two of the class had their radars upgraded, followed by the remaining four beginning in 2001. In March 2000, all six vessels had their communications systems upgraded. Beginning in 2007, their CAAIS data system was upgraded to the Nautis-3 command-and-control data system along with an upgrade from the Mk1 Otomats to the Mk2 version. El Kadesseya was taken out of service in 2000, followed by Ramadan in 2005.

References

External links