Violet Line (Delhi Metro) Explained

Violet Line
(Line 6)
Type:Rapid transit
System:Delhi Metro
Status:Fully Operational
Locale:Delhi and Faridabad
Start:Kashmere Gate
End:Raja Nahar Singh
Stations:34
Daily Ridership:300,000 (May 2018)[1]
Open:
Owner:DMRC
Operator:Delhi Metro Rail Corporation
Character:Underground and Elevated
Stock:Mitsubishi-ROTEM-BEML Standard gauge
Linelength:46.34km (28.79miles)
Electrification: overhead catenary
Map State:Show

The Violet Line (Line 6) is a metro rail line of the Delhi Metro, a rapid transit system in Delhi, India. The line connects Kashmere Gate station in New Delhi with Raja Nahar Singh in Ballabhgarh via Faridabad.[2] The line consists of 34 metro stations with a total length of 46.34km (28.79miles).[3]

This line acts as a parallel link for those who travel in the heavily used Yellow Line and connects the interior parts of South Delhi, and a little of Central Delhi to the satellite town of Faridabad.[4] The stretch between ITO metro station and Kashmere Gate metro station is popularly known as the Heritage Line.[5] The line will be extended further in the coming future up to the upcoming Noida International Airport in Jewar via Palwal.

History

The Violet Line was originally planned to open in March 2010.[6] On 12 July 2009, a portion of an under-construction bridge collapsed when its cantilever pier collapsed on load of launching girder at Zamrudpur, near East of Kailash, on the Central Secretariat  - Badarpur corridor. Six people were killed and 15 others injured.[7] The day after, on 13 July 2009, a crane that was removing the debris collapsed, and with a bowling pin effect knocking down two other nearby cranes, injuring six.[8]

An extension from the Badarpur metro station of the line was opened on 6 September 2015 to provide connectivity to the neighbouring satellite city of Faridabad. This is the second line to cross the Delhi-Haryana border after the Yellow Line to Gurgaon. This extension runs fully elevated for 13.87 km and has 9 stations.[9]

A further extension to Ballabhgarh (Raja Nahar Singh metro station) was opened on 19 November 2018.[10]
The following dates represent the dates the section opened to the public, not the private inauguration.

History
PhaseExtension dateTerminiLengthStations
II 3 October 2010Central SecretariatSarita Vihar15.34km (09.53miles)13
14 January 2011Sarita ViharBadarpur Border4.82km (03miles)3
III 26 June 2014Mandi HouseCentral Secretariat3.23km (02.01miles)2
8 June 2015Mandi HouseITO0.97km (00.6miles)1
6 September 2015Badarpur BorderEscorts Mujesar13.56km (08.43miles)9
28 May 2017Kashmere GateITO5.07km (03.15miles)4
19 November 2018Escorts MujesarRaja Nahar Singh3.35km (02.08miles)2
TotalKashmere GateRaja Nahar Singh46.34km (28.79miles)34

The depot is in Sarita Vihar adjacent to Mohan Estate metro station as a part of Phase-II of the Delhi Metro Network of the Violet Line, and in Ajronda adjacent to Neelam Chowk Ajronda metro station as a part of Phase-III of the Delhi Metro Network of the Violet Line.[11]

Stations

Violet Line
Station NamePhaseOpeningInterchange ConnectionStation LayoutPlatform Level TypeDepot ConnectionDepot Layout
EnglishHindi
1Kashmere Gateकश्मीरी गेट328 May 2017

Kashmere Gate ISBT
UndergroundIslandNone
2Lal Qilaलाल क़िलाNone
3Jama Masjidजामा मस्जिद
4Delhi Gateदिल्ली गेट
(Phase 4 - Under Construction)
5ITOआईटीओ8 June 2015None
6Mandi Houseमंडी हाउस26 June 2014
7JanpathजनपथNone
8Central Secretariatकेंद्रीय सचिवालय23 October 2010Side
9Khan Marketखान मार्केटNoneIsland
10Jawaharlal Nehru Stadiumजवाहर लाल नेहरू स्टेडियम
11Jangpuraजंगपुरा
12Lajpat Nagarलाजपत नगर

(Phase 4 - Under Construction)
ElevatedSide
13MoolchandमूलचंदNone
14Kailash Colonyकैलाश कॉलोनी
15Nehru Placeनेहरू प्लेस
16Kalkaji Mandirकालकाजी मंदिर
17GovindpuriगोविंदपुरीNone
18Harkesh Nagar Okhlaहरकेश नगर ओखला
19Jasola Apolloजसोला अपोलो
20Sarita Viharसरिता विहारSarita Vihar DepotAt Grade
21Mohan Estateमोहन एस्टेट14 January 2011None
22Tughlakabad Stationतुग़लकाबाद स्टेशन
(Phase 4 - Under Construction)
Tughlakabad railway station
23Badarpur Borderबदरपुर बॉर्डरNone
24Saraiसराय36 September 2015
25NHPC Chowkएनएचपीसी चौक
26Mewla Maharajpurमेवला महाराजपुर
27Sector 28सेक्टर २८
28Badkhal Morबदखल मोर
29Old Faridabadओल्ड फ़रीदाबादFaridabad railway station
30Neelam Chowk Ajrondaनीलम चौक अज्रोंडाNoneNeelam Chowk Ajronda DepotAt Grade
31Bata Chowkबाटा चौकNone
32Escorts Mujesarएस्कॉर्ट्स मुजेसर
33Sant Surdas - Sihiसंत सूरदास - सिही19 November 2018
34Raja Nahar Singhराजा नाहर सिंहBallabhgarh railway station

Train info

Violet Line
RakesMitsubishiHyundai RotemBEML
Train Length6
Train Gauge4 ft in (1,435 mm) standard gauge
Electrification25 kV, 50 Hz AC through overhead catenary
OHE
Train's Maximum Speed100 km/h
Train OperationDelhi Metro

Rolling stock

This line has the standard gauge trains manufactured by a consortium of Mitsubishi-ROTEM-BEML. A total of 196 cars were ordered for 4-car configuration (46 trains) and 6-car configuration (2 trains). These trains are used in this line and Green Line. One train was manufactured in Changwon in South Korea and rest of the trains are manufactured at BEML's facility in Bangalore. Trains are as compared to of broad gauge trains.[12]

See also

External links

Notes and References

  1. News: Goswami. Sweta. Violet Line users for more coaches. 6 September 2015. 15 June 2015.
  2. Web site: PM to flag off Delhi metro's Escorts Mujesar-Raja Nahar Singh section on Monday. .
  3. Web site: Route map. 2021-08-23. www.delhimetrorail.com.
  4. News: Delhi Metro's Mandi House-Central Secretariat line opens. 13 August 2014. 26 June 2014. toi25.
  5. Book: Dayal, Anuj . 5 April 2018 . Delhi Metro - Phase 3 Challenges . New Delhi . Delhi Metro Rail Corporation.
  6. Web site: Metro's Noida, Badarpur lines running late « Railway job India . 2 October 2010 . https://web.archive.org/web/20110718104331/http://railwayjob.wordpress.com/2009/09/28/metros-noida-badarpur-lines-running-late/ . 18 July 2011 . dead . dmy-all .
  7. News: A chronology of Delhi Metro accidents. 2009-07-12. Indo-Asian News Service. Hindustan Times Online. 2009-07-12.
  8. News: Day 2: 3 cranes fall, Metro image takes beating. https://web.archive.org/web/20121103144923/http://articles.timesofindia.indiatimes.com/2009-07-14/delhi/28207036_1_cranes-metro-construction-sites-launcher. dead. 2012-11-03. 2009-07-14. Megha Suri. The Times of India. 2010-01-06.
  9. News: PM Modi set to launch Faridabad corridor on September 6. 31 August 2015. PTI. IBN Live. 27 August 2015.
  10. Web site: Delhi Metro Violet Line Escorts Mujesar-Ballabgarh flagged off by PM Modi - WeForNews | Latest News, Blogs.
  11. Web site: Badarpur (Delhi) - YMCA Chowk (Faridabad) Corridor Details.
  12. Web site: The Hindu Business Line : Delhi Metro gets standard gauge train . 5 September 2010 . https://web.archive.org/web/20090623134155/http://www.thehindubusinessline.com/2009/03/18/stories/2009031850811500.htm . 23 June 2009 . dead . dmy-all .