Rail transportation in the Greater Manila Area explained

Rail transportation in the Greater Manila Area
Locale:Greater Manila Area, Philippines
Lines:9 (3 operational, 4 under-construction, 1 approved, 1 stopped operations)
System Length: (operational)
(under construction)
Stations:82 (operational)
Daily Ridership:601,195 (2022)
Annual Ridership:216,209,925 (2022)
Track Gauge: (PNR)
(current and future lines)
Transit Type:Urban rail transit
Map State:collapsed
Owner:Government of the Philippines
Department of Transportation

Rail transportation in the Greater Manila Area is a major part of the transportation system in Metro Manila and its surrounding areas. The railway network, collectively known as the Greater Capital Region Railway System,[1] [2] [3] consists of the Manila Light Rail Transit System (LRT), Manila Metro Rail Transit System (MRT), and Philippine National Railways lines within the region.

The network makes up the majority of active railways in the country and bear the brunt of providing the metropolis with rail as a faster alternative mode of transport other than buses and jeepneys. However, these systems are currently insufficient for the rapidly expanding metropolis; to address this, new lines and line extensions are under construction, which will extend the system far out into neighboring regions.[4]

Network

There are three primary rail systems in the region:

In 2022, the system served 601,195 passengers daily on average.

All lines are open every day of the year from 4:30 am PST (UTC+8) at the earliest until 10:15 pm at the latest. During Holy Week, a public holiday in the Philippines, the rail system is closed for annual maintenance, owing to fewer commuters and traffic around the metro. Normal operation resumes after Easter Sunday.[6] During the Christmas and year-end holidays, the operating hours of the system are shortened due to the low ridership of the system during the holidays.[7]

Line number/name and colorOpenedLast extensionTerminiStationsTypeLength
Manila Light Rail Transit System
Line 1Fernando Poe Jr.20Light rail19.651NaN1
Line 213Heavy rail17.61NaN1
Manila Metro Rail Transit System
Line 313Light rail16.9km (10.5miles)
Line 42028[8] (projected)11Heavy rail15.56km (09.67miles)
Line 72025[9] (projected)North Triangle14Heavy rail22.8km (14.2miles)
Metro Manila Subway (MMS)2026[10] (projected)
NAIA Terminal 3
15Heavy rail36km (22miles)
Philippine National Railways
Metro Commuter36Commuter rail60km (40miles)
North–South Commuter Railway (NSCR)2031 (projected)
36Urban rail transit (S-train)147km (91miles)
Other transit lines
Makati SubwayCancelled13Heavy rail10km (10miles)
SkyTrainUptown Bonifacio2People moverTBD

Stations

History

Early rail systems

Rail transportation in the Manila area dates back to 1878 when an official from Spain's Department of Public Works for the Philippines submitted a proposal for a Manila streetcar system, now referred to as the Tranvía. The system proposed was a five-line network emanating from Plaza San Gabriel in Binondo, running to Intramuros, Malate, Malacañan Palace, Sampaloc and Tondo. The project was approved and in 1882, Spanish-German businessman Jacobo Zóbel de Zangroniz, Spanish engineer Luciano M. Bremon, and Spanish banker Adolfo Bayo, founded the Compañia de los Tranvias de Filipinas to operate the concession granted by the Spanish colonial government. The first line opened in the system, the Tondo line, would open on December 9, 1883, predating the Ferrocarril de Manila–Dagupan by nine years, serving as the first rail transport in the country. Numerous other lines would open in the following years; the Intramuros line would open in 1886, the Sampaloc line in 1887, and the Malabón line in 1888.

The Ferrocarril de Manila–Dagupan, which constitutes much of the PNR North Main Line today, began construction on July 31, 1887, with the laying of the cornerstone for Tutuban station, and the 195adj=onNaNadj=on line opened on November 24, 1892. Expansion of the Philippine railway network would not begin until the American colonial period, when on December 8, 1902, the Philippine Commission passed legislation authorizing the construction of another railway line from Manila to Southern Luzon.

American period

With the American takeover of the Philippines, legislation was passed in 1909 authorizing further railway construction and the use of government bonds to finance them, and by 1916, 792.5km (492.4miles) of track had been built by the company, which had reorganized itself as the Manila Railroad Company of New Jersey (MRR).[11] The Manila Railroad Company, which preceded the PNR, operated various local trains between Manila and its neighboring provinces. Trains from Tutuban lead to Naic in Cavite, Pagsanjan in Laguna, Montalban in Rizal, and Bulacan during the 1920s.[12]

Meanwhile, the Philippine Commission allowed the Manila Electric Railroad and Light Company (Meralco) to take over the properties of the Compañia de los Tranvias de Filipinas,[13] with the first of twelve mandated electric tranvia (tram) lines operated by MERALCO opening in Manila in 1905.[14] At the end of the first year around 63 kilometers (39 mi) of track had been laid.[15] A five-year reconstruction program was initiated in 1920, and by 1924, 170 cars serviced many parts of the city and its outskirts. Although it was an efficient system for the city's 220,000 inhabitants, by the 1930s the streetcar network had stopped expanding.[16] Much of the Tranvía network and rail services would be destroyed during World War II.

Post-war period

Following the war, the MRR was able to restore limited services, using surplus military equipment and payments made by the United States Army and the Philippine Commonwealth Army for use of railway facilities in the Philippines Campaign. However, the tram network was damaged beyond repair and was dismantled; jeepneys became the city's primary form of transportation, plying the routes once served by the tram lines. With the return of buses and cars to the streets, traffic congestion became a problem.

In 1966, the Philippine government granted a franchise to Philippine Monorail Transport Systems (PMTS) for the operation of an inner-city monorail.[17] The monorail's feasibility was still being evaluated when the government asked the Japan International Cooperation Agency (JICA) to conduct a separate transport study.[16] Prepared between 1971 and 1973, the JICA study proposed a series of circumferential and radial roads, an inner-city rapid transit system, a commuter railway, and an expressway with three branches. After further examination, many recommendations were adopted; however, none of them involved rapid transit and the monorail was never built. PMTS' franchise subsequently expired in 1974.[18]

Meanwhile, the MRR's successor, the Philippine National Railways, opened its commuter service from Manila North Harbor to Biñan, Laguna. During this decade, more stations were opened although some were either closed or relocated. In 1976, the commuter system peaked and extended as far north as San Fernando, Pampanga,[19] Guadalupe (located in Mandaluyong on the other side of Pasig River) to the east, and College to the south.[20] There were also services in the now-defunct Carmona branch line.[21]

Another study was performed between 1976 and 1977, this time by Freeman Fox and Associates and funded by the World Bank. It originally suggested a street-level railway, but its recommendations were revised by the newly formed Ministry of Transportation and Communications (now the Department of Transportation). The ministry instead called for an elevated system because of the city's many intersections. However, the revisions increased the price of the project from ₱1.5 billion to ₱2 billion. A supplementary study was conducted and completed within three months.

In 1978, at the request of the Philippine government, the Japan International Cooperation Agency conducted a study on the electrification of the PNR's north and south commuter lines in Metro Manila.[22] The plan, formulated to keep up with the increasing demand for transportation in the Manila area, called for the replacement of the diesel-run trains and the electrification of the PNR commuter line. Two experts from the Japanese National Railways were sent to conduct the study.

Introduction of rapid transit

President Ferdinand Marcos created the Light Rail Transit Authority (LRTA) on July 12, 1980, by virtue of Executive Order No. 603[23] giving birth to what was then dubbed the "Metrorail". Construction of Metrorail started in September 1981. The line was test-run in March 1984, and the first half of the line from Baclaran to Central Terminal was opened on December 1, 1984. With the opening of its first segment, LRT Line 1 became the first rapid transit service in Southeast Asia.[24] The second half, from Central Terminal to Monumento, was opened on May 12, 1985.[25] Overcrowding and poor maintenance resulted in the system's inefficiency and disruptions to operations. The premature aging of Line 1 led to an extensive refurbishing and structural capacity expansion program with the help of Japan's ODA.[26]

During the construction of the LRT Line 1, Electrowatt Engineering Services of Zürich also designed a comprehensive plan for metro service in Metro Manila. The plan—still used as the basis for planning new metro lines—consisted of a 150sp=usNaNsp=us network of rapid transit lines spanning all major corridors within 20 years.[27] The plan would be revised in 1999 as the Metro Manila Urban Transportation Integration Study by the Japan International Cooperation Agency.[28]

In the 1993 Updated Traffic and Transport Management Plan, which proposes the network of five LRT lines that were approved in 1995:[29] [30]

For the 1995 and 1999 MMUTIS master plans of a network,[31] which revise the routes, they are:

The construction of the Metro Rail Transit system's first line, MRT Line 3, would officially began in 1989 under the name "LRT-3" with the Hong Kong-based EDSA LRT Corporation winning the public bidding for the line's construction during the term of President Corazon Aquino.[32] However, construction could not commence, with the project stalled as the Philippine government conducted several investigations into alleged irregularities with the project's contract.[33] In 1995, the Supreme Court upheld the regularity of the project (G.R. No. 114222, April 6, 1995) which paved the way for construction to finally begin during the term of President Fidel V. Ramos. A consortium of local companies, led by Fil-Estate Management was later joined by Ayala Land, and 5 others, later formed the Metro Rail Transit Corporation (MRTC) in June 1995 and took over the EDSA LRT Corporation. Construction began on October 15, 1996, with a BLT agreement signed between the Philippine government and the MRTC. On December 15, 1999, the initial section from North Avenue to Buendia was inaugurated by President Joseph Estrada.[34]

In 1990, the PNR's commuter system underwent renovations under the working title of Metrotrak.[35] By May of that year, the system was inaugurated as Metrotren to distinguish it from the LRT Line 1, then named "Metrorail".[36] However, the Metrotren system eventually suffered neglect due to lack of funding and maintenance. Plans for expansion and rehabilitation such as the Manila–Clark rapid railway project and Guadalupe line revival was also never realized.[37] In addition, numerous natural disasters and neglect forced the line from Manila to Northern Luzon to close.[38]

LRT Line 2 would begin construction in 1996, twelve years after the opening of LRT Line 1, with the granting of the soft loans for the line's construction. However, construction barely commenced, with the project stalled as the Philippine government conducted several investigations into alleged irregularities with the project's contract. The consortium of local and foreign companies, led by Marubeni Corporation, formed the Asia-Europe MRT Consortium (AEMC) which won the contract and restarted the project in 2000 after getting cleared from the allegations.[39]

Expansion

Numerous rail projects would be completed in the early 2000s. On July 20, 2000, the rest of the MRT Line 3 stations opened a little over a month past the original deadline, due to DOTC's inclusion of additional work orders such as the Tramo overpass in Pasay leading to NAIA.[40] Initially having low ridership due to high fares,[41] the government subsidized fares to reduce the line's ticket prices, causing ridership to increase. On April 5, 2003, LRT Line 2's initial section, from Santolan to Araneta Center-Cubao was inaugurated by President Gloria Macapagal Arroyo,[42] with all remaining stations opening on April 5, 2004, except for Recto which opened on October 29, 2004.[43]

Rehabilitation of the PNR and NorthRail

The Arroyo administration attempted to modernize the PNR system by rebuilding the lines and purchasing new rolling stock. PNR purchased 6 brand new diesel multiple units from South Korea and became its first order in 35 years.[44] The government also started the NorthRail project, which would have revived the North Main Line from Tutuban to Malolos, with the first phase covering Caloocan to Malolos segment.[45] The project was estimated to cost around US$500 million, and the funding was to be covered by a US$400 million by the Export–Import Bank of China, and the rest to be shouldered by the government through BCDA and NLRC.[46] [47] However, due to allegations of overpricing and other problems,[45] the line's construction was repeatedly halted, until it was finally discontinued in 2011.[48] [46] The succeeding Aquino administration rebuilt the stations along the line to accommodate high-floor trains. PNR also acquired second-hand multiple units from Japan as stopgap measures to its train fleet, ending the Metrotren era.[49]

Strong Republic Transit System

See main article: Strong Republic Transit System.

The Strong Republic Transit System was launched in 2004 to integrate the various rail lines providing public transport in Manila in the Philippines. The program was initiated by former president Gloria Macapagal-Arroyo on June 14, 2003. It aimed to provide a "reliable, seamless and integrated mass transit system that would be at par with international standards" through the unification of already-existing rail infrastructure under one transit system and fare structure. The Manila Light Rail Transit System (Line 1 and Line 2), the Manila Metro Rail Transit System (Line 3) and the Philippine National Railways (PNR) Northrail and Southrail lines were covered by the SRTS project.[50]

These are the existing and proposed lines under the SRTS:

Contemporary history

Numerous extensions to the existing lines would be opened beginning in 2010. The construction of LRT Line 1's north extension to Roosevelt began in 2007 and would be completed by 2010. Originally supposed to end at North Avenue, bureaucracy in the Department of Transportation, corporate feud, and issues related to its proposed location hindered the station's construction, which would only begin in 2017.[51] [52] [53] [54] LRT Line 1 would also be privatized in 2015.[55] Construction of another extension of the line up to Cavite began in 2019.[56] On July 5, 2021, the east extension of the LRT Line 2, which began construction in 2015, was opened to the public.[57] The extension adds the Marikina and Antipolo stations, with the latter being the first rail transit station to be opened outside of Metro Manila.

However, the early 2010s were also marked by the deterioration of some lines. PNR's commuter line in the region would further decline as services were further suspended to Santa Rosa in 2014,[58] and to Alabang in 2015 due to safety issues and accidents on the line.[59] The national government would later procure new rolling stock and rehabilitate the line, enabling services to in the north and in the south to be reopened by 2019.[60] [61] Meanwhile, MRT Line 3 deteriorated due to poor maintenance and overcrowding. As a response, the government started procuring additional trainsets in 2013, with the first trainsets received in 2016. However, various compatibility issues and the line's poor condition lead to the trainsets only being used in limited capacity beginning in 2020. The rehabilitation of the line started in 2019 and was completed in 2021.[62]

Several new railway projects are being undertaken by the national government and the private sector. These include the North–South Commuter Railway, the Metro Manila Subway, and MRT Line 7, all of which are under construction.[63] Other line extensions and railway lines are in the planning stage.[64] [65]

For the 2020s proposal, the Greater Capital Region Railway System consists of seven lines:[66] [67]

Rolling stock

The railway systems in the Greater Manila Area use multiple types of rolling stock.

Manila LRT

Four types of rolling stock run on the system, with three types used on Line 1 and another used on Line 2. Line 1 railway cars were made either in Belgium by La Bruggeoise et Nivelle, South Korea by Hyundai Precision and Adtranz (La bruggeoise et Nivelle and Adtranz are now part of Bombardier Transportation), or Japan by Kinki Sharyo and Nippon Sharyo.[68] [69] [70] The Line 2, unlike the Line 1, runs heavy rail metro cars made in South Korea by Hyundai Rotem and provided by the Asia-Europe MRT Consortium led by Marubeni Corporation that have higher passenger capacity and maximum speed.[71] All four types of rolling stock are powered by electricity supplied through overhead wires.

Of the two LRTA lines, the Line 2 prominently employs wrap advertising in its rolling stock. LRT Line 1 have also begun using wrap advertising as well initially for their second-generation trains, followed by their third-generation trains.

Manila MRT

Currently, the system uses two types of rolling stock on its single line, MRT Line 3. Like LRT Line 1, the line uses light rail vehicles. The first railway cars were manufactured by ČKD Tatra in 1999. The second railway cars, commonly referred to as the Dalian Train, were manufactured by CRRC Dalian in 2016. The deployment of the Dalian trainsets was delayed due to several factors, including weight limits on existing tracks and inconsistencies in production, which has since been corrected. Though some train cars have passed validation tests, none of the Dalian trains are in operation for daily revenue services.

The MRT Line 4, Line 7, and the Metro Manila Subway will use heavy rail metro cars unlike Line 3, with the trains of the Metro Manila Subway being similar to that of the North–South Commuter Railway.[72]

Philippine National Railways

See main article: List of Philippine National Railways rolling stock.

The Metro Commuter Line has always used diesel-powered rolling stock since the services were opened in 1970. There were no new orders until 2009 when PNR ordered the Hyundai Rotem DMUs, followed by second-hand multiple units and coaches from Japan. PNR later ordered 7 new trains from Indonesian manufacturer PT INKA in 2018, subsequently increased to 9. The DOST Hybrid Electric Train also entered trial service the same year.[73] The agency then commenced the refurbishment of its entire fleet the following year, which introduced polycarbonate windows that can resist stoning as well as a new livery. After all the INKA trainsets have arrived and the refurbishment of older trains are completed, the Hyundai Rotem DMUs and the INKA trainsets will become the Metro Commuter fleet while the older Japanese trainsets will be transferred to the Bicol Region for its new commuter service unless PNR decides otherwise.

The North–South Commuter Railway will use a total of 464 electric multiple unit train cars, equivalent to 58 train sets. 104 of these are the thirteen 8-car EM10000 class trainsets being built by the Japan Transport Engineering Company (J-TREC), while the other 304 will also be built by J-TREC with the same design and specifications to the EM10000 class trains.[74] The trainsets are based on JR East commuter stock such as the E233 series but adopted to standard gauge. The first commuter train arrived on November 21, 2021.[75] On the other hand, an order for 56 airport express trainsets (7 sets) are being procured as of 2022.[76] The Department of Transportation later announced it will acquire its airport express train from Japanese manufacturers on May 10, 2021.[77]

Further reading

Notes and References

  1. Web site: LOOK: Upcoming railway system to connect seven train lines in Greater Manila Area . 2024-08-13 . Philstar Life.
  2. Web site: DOTr’s Greater Capital Region railway system map previews ‘operating lines by 2030’ . 2024-08-13 . . en.
  3. Web site: Rodriguez . Mia . September 6, 2023 . LOOK: Here's What Our Train Lines Might Be Like by 2030 . Spot.PH.
  4. Web site: March 9, 2021. Praiseworthy progress in commuter rail infrastructure. July 13, 2021. The Manila Times. en. March 24, 2021. https://web.archive.org/web/20210324073538/https://www.manilatimes.net/2021/03/09/opinion/editorial/praiseworthy-progress-in-commuter-rail-infrastructure/848945/. live.
  5. Web site: Relativo . James . PNR to suspend Metro Manila operations to 'speed up NSCR project' . 2024-04-14 . Philstar.com.
  6. News: Ronda, Rainier Allan . LRT, MRT closed for Holy Week . . PhilStar Daily, Inc. . March 31, 2010 . March 16, 2022 .
  7. News: Here are the LRT-1, LRT-2, MRT-3 schedules for Christmas 2021. Leandre. Grecia. Top Gear Philippines. December 21, 2021. March 16, 2022.
  8. News: Subingsubing. Krixia. January 10, 2020. MRT 4 project targeted for completion in 2025. Inquirer.net. July 13, 2021. June 21, 2020. https://web.archive.org/web/20200621052511/https://newsinfo.inquirer.net/1211139/mrt-4-project-targeted-for-completion-in-2025. live.
  9. News: February 19, 2021. MRT-7 more than 50% complete, set to open by Dec. 2022. CNN Philippines. February 20, 2021. July 13, 2021. https://web.archive.org/web/20210713092647/https://cnnphilippines.com/404.html. dead.
  10. Web site: September 5, 2020. DOTr says Metro Manila Subway will be flood-proof. December 5, 2020. Inquirer.net. September 22, 2020. https://web.archive.org/web/20200922005058/https://business.inquirer.net/306673/dotr-assures-metro-manila-subway-will-be-flood-proof. live.
  11. Report of Survey of the Manila Railroad Company and the Preliminary Survey of Railroads for Mindanao. De Leuw, Cather & Company. Chicago. 1–12. Chapter I: Present Conditions. 1951.
  12. Orbon. Glenn. Dungca. Joana. 2015. The Philippine Railway System. Movement Systems.
  13. Book: The Philippines' Oldest Business House. Filipinas Foundation. 1984. Makati. 68–70.
  14. Satre, Gary L.. June 1998. The Metro Manila LRT System—A Historical Perspective. dead. Japan Railway and Transport Review. 16. 33–37. https://web.archive.org/web/20060505060037/http://www.jrtr.net/jrtr16/pdf/f33_satre.pdf. May 5, 2006. May 8, 2006.
  15. Web site: Manila Electric Company (Meralco).. November 10, 2004. History of Meralco. dead. https://web.archive.org/web/20090918153259/http://www.meralco.com.ph/Corporate/about/mh_100_years2.htm. September 18, 2009. January 18, 2010. Meralco company website.
  16. Web site: Light Rail Transit Authority Company History. dead. https://web.archive.org/web/20120825023912/http://www.lrta.gov.ph/lrt_history.htm. August 25, 2012. October 7, 2012. Light Rail Transit Authority.
  17. Republic of the Philippines. (Approved: June 14, 1966). Republic Act No. 4652 – An Act Granting the Philippine Monorail Transit System, Incorporated a Franchise to Establish, Maintain and Operate a Monorail Transportation Service in the City of Manila and Suburbs and Cebu City and Province . Retrieved December 13, 2009, from the Chan Robles Virtual Law Library.
  18. Republic of the Philippines. (Enacted: October 4, 1971). Republic Act No. 6417 – An Act Amending Sections Three And Seven Of Republic Act Numbered Forty-Six Hundred Fifty-Two, Entitled "An Act Granting the Philippine Monorail Transit System, Incorporated a Franchise to Establish, Maintain and Operate a Monorail Transportation Service in the City Of Manila and Suburbs and Cebu City and Province" . Retrieved December 13, 2009, from the Chan Robles Virtual Law Library.
  19. Web site: PNR Schedule effective September 11, 1976. July 23, 2020. www.flickr.com. November 7, 2015. https://web.archive.org/web/20151107015746/https://www.flickr.com/photos/79691913@N05/7203660366/sizes/h/. live.
  20. Web site: Old PNR stations. July 23, 2020. Reddit. July 23, 2020. https://web.archive.org/web/20200723073238/https://i.redd.it/my69n3n3ni241.jpg. live.
  21. News: April 1973. Carmona's Commuter Train. Times Journal. July 23, 2020. July 13, 2021. https://web.archive.org/web/20210713092736/https://www.flickr.com/photos/fairlane/5542692950/. live.
  22. Web site: December 1978. REPORT ON STUDY OF THE ELECTRIFICATION OF THE PNR COMMUTER SERVICE. live. https://web.archive.org/web/20210522061302/https://openjicareport.jica.go.jp/pdf/10458966_01.pdf. May 22, 2021. February 15, 2021. Japanese International Cooperation Agency (JICA).
  23. Web site: Republic of the Philippines.. July 12, 1980. Executive Order No. 603. https://web.archive.org/web/20070519193039/http://www.lrta.gov.ph/eo603.htm. May 19, 2007. Retrieved February 15, 2010, from the Light Rail Transit Authority Website.
  24. Web site: Marasigan. Lorenz S.. January 28, 2021. New trains for LRT-1 arrive in PHL Lorenz S. Marasigan. July 13, 2021. BusinessMirror. en-US. February 13, 2021. https://web.archive.org/web/20210213112443/https://businessmirror.com.ph/2021/01/28/new-trains-for-lrt-1-arrive-in-phl/. live.
  25. http://www.lrta.gov.ph/line1_metrorail.htm The Line 1 System – The Yellow Line
  26. Web site: Japan International Cooperation Agency. Line 1 Capacity Expansion Project. JICA official page. July 13, 2021. July 13, 2021. https://web.archive.org/web/20210713092644/https://www.jica.go.jp/english/our_work/index.html. live.
  27. Web site: Light Rail Transit Authority Company History. dead. https://web.archive.org/web/20140924073453/http://www.lrta.gov.ph/company_history.php. September 24, 2014. September 13, 2014. Light Rail Transit Authority.
  28. News: Abadilla. Emmie V.. July 1, 2021. P4.5-B LRT-2 East Extension to start operation next week. Manila Bulletin. July 1, 2021. July 11, 2021. https://web.archive.org/web/20210711040327/https://mb.com.ph/2021/07/01/p4-5-b-lrt-2-east-extension-to-start-operation-next-week/. live.
  29. Web site: Urban Railway Projects In Bangkok - Measures for Securing Financial Resources .
  30. News: May 27, 1995 . Malacañang okays five more LRT projects . Manila Standard . 17.
  31. Final Report Summary . Iwata . Shizuo . March 5, 1999 . . October 2, 2021 . https://web.archive.org/web/20211002110225/https://openjicareport.jica.go.jp/pdf/11580446.pdf . October 2, 2021 . live . Metro Manila Urban Transportation Integration Study.
  32. News: Anonas, Alma S.. June 10, 1999. On track and heading for Year 2K on MRT-3. Manila Standard. Kamahalan Publishing Corporation. January 21, 2014. July 10, 2021. https://web.archive.org/web/20210710105532/https://news.google.com/newspapers?nid=1370&dat=19990610&id=SpQVAAAAIBAJ&pg=5285,1683911. live.
  33. News: Macaspac, Joem H.. Garcia, Ma. Luisa M.. March 28, 1996. First phase of Edsa metro rail transit system under way. Manila Standard. Kamahalan Publishing Corporation. January 21, 2014. July 10, 2021. https://web.archive.org/web/20210710105532/https://news.google.com/newspapers?nid=1370&dat=19960328&id=oJ8VAAAAIBAJ&pg=4705,4566016. live.
  34. News: December 15, 1999. Miracle rail project to rid Edsa of jams. New Straits Times. The New Straits Times Press (M) Bhd.. January 21, 2014. July 13, 2021. https://web.archive.org/web/20210713092641/https://news.google.com/newspapers?nid=1309&dat=19991215&id=801OAAAAIBAJ&pg=2667%2C3110141. live.
  35. Web site: January 4, 1990. MetroTrak. July 22, 2020. Philippine Journal. Philippine News Agency. July 13, 2021. https://web.archive.org/web/20210713092700/https://www.flickr.com/photos/79691913@N05/8416775188/. live.
  36. Web site: May 11, 1990. Metrotren inaugural. July 22, 2020. Manila Chronicle. July 13, 2021. https://web.archive.org/web/20210713092641/https://www.flickr.com/photos/79691913@N05/9719461423/. live.
  37. Web site: July 15, 2008. Off track: Northrail timeline. July 23, 2020. ABS-CBN News. February 17, 2019. https://web.archive.org/web/20190217142246/https://news.abs-cbn.com/nation/07/15/08/track-northrail-timeline. live.
  38. News: Camus. Miguel. July 16, 2015. Gov't rolls out P171-B railway project. Philippine Daily Inquirer. July 23, 2020. July 23, 2020. https://web.archive.org/web/20200723074535/https://business.inquirer.net/195368/govt-rolls-out-p171-b-railway-project. live.
  39. News: July 6, 2021. Manila Light Rail Transit Line 2 East Extension Line Starts Operation. Marubeni Corporation. July 8, 2021. July 9, 2021. https://web.archive.org/web/20210709183529/https://www.marubeni.com/en/news/2021/release/00059.html. live.
  40. News: July 16, 2000. MRT 3 Fully Completed; Inauguration, Turnover Set on July 20. Manila Bulletin. Manila Bulletin Publishing Corporation. subscription. August 14, 2014. July 13, 2021. https://web.archive.org/web/20210713092754/https://www.gale.com/databases/questia. live.
  41. News: Trinidad, Andrea H.. January 2, 2000. Metrostar Express proves a big disappointment. Philippine Daily Inquirer. Philippine Daily Inquirer, Inc.. January 21, 2014. July 13, 2021. https://web.archive.org/web/20210713092648/https://news.google.com/newspapers?nid=2479&dat=20000102&id=64c1AAAAIBAJ&pg=3112%2C21370266. live.
  42. Web site: Japan International Cooperation Agency. Metro Manila Strategic Mass Rail Transit Development. JICA Official Page. July 13, 2021. July 13, 2021. https://web.archive.org/web/20210713092650/https://www.jica.go.jp/english/our_work/index.html. live.
  43. News: Bergonia, Allan.. October 28, 2004. Line 2 Recto Station Opens. People's Journal. dead. https://web.archive.org/web/20050308020226/http://www.lrta.gov.ph/news/news_item_102804_RectoStationsOpens.htm. March 8, 2005. Retrieved May 11, 2006, from the LRTA Website.
  44. Web site: May 25, 2009. Ballast Train in Tayuman. July 23, 2020. July 13, 2021. https://web.archive.org/web/20210713092644/https://www.flickr.com/photos/14564368@N02/3653041039. live.
  45. Web site: July 15, 2008. Off track: Northrail timeline. live. https://web.archive.org/web/20190217142246/https://news.abs-cbn.com/nation/07/15/08/track-northrail-timeline. February 17, 2019. February 17, 2019. ABS-CBN News.
  46. Web site: Inquirer. Philippine Daily. WHAT WENT BEFORE: The Northrail Project. live. https://web.archive.org/web/20190214005346/https://newsinfo.inquirer.net/1074035/what-went-before-the-northrail-project. February 14, 2019. February 16, 2019. newsinfo.inquirer.net. January 17, 2019 . en.
  47. News: April 6, 2004. RP, China break ground for Manila–Ilocos railway. Malaya. dead. https://web.archive.org/web/20100509062704/http://www.lrta.gov.ph/news/news_item_040604_RpChinaBreakGroundForManila-IlocosRailway.htm. May 9, 2010.
  48. News: Philippines: China-funded Northrail project derailed. en-GB. Financial Times. July 23, 2020. August 17, 2018. https://web.archive.org/web/20180817144908/https://www.ft.com/content/7f7f314c-522b-3a68-b6ad-4188ff607f4d. live.
  49. News: Montecillo. Paolo. September 26, 2011. PNR gets old trains from Japan. July 23, 2020. July 23, 2020. https://web.archive.org/web/20200723232926/https://business.inquirer.net/21601/pnr-gets-old-trains-from-japan. live.
  50. https://web.archive.org/web/20040203065430/http://www.lrta.gov.ph/srts_project.htm The Strong Republic Transit System
  51. News: Kris Bayos. February 4, 2015. Common station at SM North EDSA pushed for Lines 1, 3, and 7. Manila Bulletin. live. March 24, 2015. https://web.archive.org/web/20150402094235/http://www.mb.com.ph/common-station-at-sm-north-edsa-pushed-for-lrt1-mrt3-and-mrt7/. April 2, 2015.
  52. News: Judith Balea. June 14, 2014. Why SM is after the MRT-LRT common station. Rappler. live. March 26, 2015. https://web.archive.org/web/20150416221922/http://www.rappler.com/business/industries/175-real-estate/60529-sm-ayala-mrt-lrt-common-station. April 16, 2015.
  53. News: Mick Basa. November 20, 2014. DOTC eyeing another LRT-MRT common station. Rappler. live. March 26, 2015. https://web.archive.org/web/20150417010615/http://www.rappler.com/business/industries/208-infrastructure/75267-sm-north-common-station. April 17, 2015.
  54. Web site: Danessa O. Rivera. August 1, 2014. SC stops DOTC, LRTA from building common station in front of Trinoma. live. https://web.archive.org/web/20150408132714/http://www.gmanetwork.com/news/story/372930/economy/companies/sc-stops-dotc-lrta-from-building-mrt-lrt-common-station-in-front-of-trinoma. April 8, 2015. March 26, 2015. GMA News.
  55. Web site: Line 1 Cavite Extension and Operation & Maintenance. dead. https://web.archive.org/web/20150316021231/http://ppp.gov.ph/?p=7641. March 16, 2015. March 24, 2015. Public-Private Partnership Center.
  56. Web site: Manila Light Rail Transit Line 1 (LRT-1) Cavite Extension. September 14, 2020. Railway Technology. January 26, 2021. https://web.archive.org/web/20210126203338/https://www.railway-technology.com/projects/manila-light-rail-transit-line-1-lrt-1-cavite-extension/. live.
  57. News: Garcia. Leandre. July 5, 2021. The new LRT-2 stations in Marikina and Antipolo are now operational. Top Gear Philippines. July 5, 2021. July 11, 2021. https://web.archive.org/web/20210711051439/https://www.topgear.com.ph/news/motoring-news/lrt-2-east-extension-opening-a4354-20210705. live.
  58. News: Macaraig. Ayee. May 6, 2014. Senate panel: Extend PNR, improve services. Rappler. July 23, 2020. July 23, 2020. https://web.archive.org/web/20200723101323/https://rappler.com/nation/senate-extend-pnr-25-years. dead.
  59. News: Corrales. Nestor. July 23, 2015. PNR resumes Tutuban-Alabang train operations. Philippine Daily Inquirer. July 23, 2020. June 19, 2020. https://web.archive.org/web/20200619022404/https://newsinfo.inquirer.net/707081/pnr-resumes-tutuban-alabang-train-operations. live.
  60. Web site: PNR extends service to Malabon. July 13, 2021. Philstar.com. December 13, 2018. https://web.archive.org/web/20181213083730/https://www.philstar.com/nation/2018/12/04/1874137/pnr-extends-service-malabon. live.
  61. Web site: You can now ride the PNR from Los Baños to Metro Manila. live. July 13, 2021. TopGear Philippines. en. May 16, 2021. https://web.archive.org/web/20210516010314/https://www.topgear.com.ph/news/motoring-news/pnr-los-banos-tutuban-a4354-20191202.
  62. News: MRT 3 rehabilitation is finished, says Tugade . Daphne . Galvez . March 1, 2022 . Philippine Daily Inquirer . March 12, 2022 . live . https://web.archive.org/web/20220303142321/https://newsinfo.inquirer.net/1561352/tugade-says-mrt-3-rehab-is-finished . March 3, 2022.
  63. News: Balinbin. Arjay L.. February 5, 2021. Deployment of 25 tunnel-boring machines signals big push for subway completion. BusinessWorld. July 13, 2021. February 6, 2021. https://web.archive.org/web/20210206050038/https://www.bworldonline.com/deployment-of-25-tunnel-boring-machines-signals-big-push-for-subway-completion/. live.
  64. Web site: Tutuban Center may become Manila's busiest station. March 21, 2015. ABS-CBN News.
  65. Web site: LOOK: Gov't to build 3 more Line 2 stations. live. https://web.archive.org/web/20200123222442/https://news.abs-cbn.com/business/10/13/19/look-govt-to-build-3-more-lrt-2-stations. January 23, 2020. January 30, 2020. ABS-CBN News. en.
  66. Web site: DOTr’s Greater Capital Region railway system map previews ‘operating lines by 2030’ . 2024-07-05 . TopGear Philippines . en.
  67. Web site: September 6, 2023 . LOOK: Here's What Our Train Lines Might Be Like by 2030 . July 6, 2024 . spot.ph.
  68. http://www.lrta.gov.ph/line2_megatren.htm The Line 2 System – The Purple Line
  69. Razon, Evangeline M.. June 1998. The Manila LRT System. dead. Japan Railway and Transport Review. 16. 38–39. https://web.archive.org/web/20090824075435/http://www.jrtr.net/jrtr16/pdf/f38_razon.pdf. August 24, 2009. December 15, 2009.
  70. Otaki, Tsutomu.. 2007. The Commissioning – In Case of a Project in Manila. KS World. Kinki Sharyo. 14. 12–13. January 15, 2010. March 28, 2012. https://web.archive.org/web/20120328001035/http://www.kinkisharyo.co.jp/pdf/gihou/KSW14/KSW14_e_P12-13.pdf. dead.
  71. [Marubeni]
  72. Web site: December 21, 2020. Order Received to Supply 240 Train Cars for Philippines' Metro Manila Subway. sumitomocorp.com. Sumitomo Corporation. July 13, 2021. January 23, 2021. https://web.archive.org/web/20210123074917/https://www.sumitomocorp.com/en/jp/news/release/2020/group/14170. live.
  73. News: Uy. Jocelyn. July 20, 2016. PNR tracks sought for test runs. July 23, 2020. Philippine Daily Inquirer. live. https://web.archive.org/web/20210607121825/https://newsinfo.inquirer.net/797367/pnr-tracks-sought-for-test-runs. June 7, 2021.
  74. Web site: Order Received to Supply 304 for the Philippines' North-South Commuter Railway Extension Project. March 18, 2022. March 28, 2022. Sumitomo Corporation. March 20, 2022. https://web.archive.org/web/20220320102105/https://www.sumitomocorp.com/en/africa/news/release/2022/group/15590. live.
  75. News: First 8-car trainset for PNR Clark Phase 1 arrives in PH. ABS-CBN News. November 21, 2021. November 22, 2021. live. https://web.archive.org/web/20211121134144/https://news.abs-cbn.com/business/11/21/21/first-pnr-clark-trainset-arrives-in-ph. November 21, 2021.
  76. News: October 16, 2019. 1 local, 5 foreign firms bid for P50.8-B PNR Clark Phase 2. GMA News. February 15, 2020. February 15, 2020. https://web.archive.org/web/20200215041640/https://www.gmanetwork.com/news/money/companies/711902/1-local-5-foreign-firms-bid-for-p50-8-b-pnr-clark-phase-2/story/. live.
  77. Web site: May 10, 2021. Philippines: Philippines to engage Japanese manufacturers for NSCR Express trainsets. International Union of Railways. May 17, 2021. May 17, 2021. https://web.archive.org/web/20210517092504/https://uic.org/com/enews/article/philippines-philippines-to-engage-japanese-manufacturers-for-nscr-express. live.