Railway electrification in Great Britain explained

Railway electrification in Great Britain began in the late 19th century. A range of voltages has been used, employing both overhead lines and conductor rails. The two most common systems are using overhead lines, and the third rail system used in Southeast England and on Merseyrail. As of October 2023, (38%) of the British rail network was electrified.[1]

According to Network Rail, as at 2003, 64% of the electrified network used the 25kVAC overhead system, and 36% used the 660/750VDC third-rail system.[2]

The electrified network is set to expand over the coming years, as 25kV electrification is extended to currently unelectrified lines such as the Midland Main Line, as well as lines in the North of England as part of the Northern Hub.[3]

History

Early electrification

The first electric railway in Great Britain was Volk's Electric Railway in Brighton, a pleasure railway, which opened in 1883, still functioning to this day. The London Underground began operating electric services using a fourth rail system in 1890 on the City and South London Railway, now part of the London Underground Northern line. The Liverpool Overhead Railway followed in 1893, being designed from the outset to be electric traction, unlike the City and South London Railway which was designed to be cable hauled initially.

Main line electrification of some suburban lines began in the early years of the 20th century, using a variety of different systems. The Mersey Railway converted to 600VDC electric multiple-unit operation on 3 May 1903, thus eliminating the problems caused by steam traction in the long tunnel under the River Mersey, and the Lancashire & Yorkshire Railway's Liverpool Exchange to Southport (and on to Crossens) suburban commuter line was similarly electrified at 625V by March 1904. Both of these lines initially used a fourth rail system.

In 1921, a government committee chose 1,500VDC overhead to be the national standard,[4] but little implementation followed and many different systems co-existed. During the interwar period, the Southern Railway adopted the 660VDC third rail system as its standard and greatly expanded this system across its network of lines South of London.

Post-war

After World War II and the nationalisation of the railways in 1948, British Railways (BR) expanded electrification at both 1,500VDC overhead and 660/750V third rail. In 1956, BR adopted 25kVAC overhead as standard for all projects outside logical extensions of third-rail systems.[5]

Twenty-first century

The 25kVAC network has continued to expand slowly, and large areas of the country outside London are not electrified. In 2007, the government's preferred option was to use diesel trains running on biodiesel, its White Paper Delivering a Sustainable Railway,[6] ruling out large-scale railway electrification for the following five years.

In May 2009, Network Rail launched a consultation on large-scale electrification, potentially to include the Great Western Main Line and Midland Main Line and smaller "in-fill" schemes. Key benefits cited were that electric trains are faster, more reliable and cause less track wear than diesel trains.[7] On 5 June 2009, Lord Adonis was appointed Secretary of State for Transport, and announced the plans to electrify the Great Western Main Line from London as far as Swansea, as well as infill electrification schemes in the North West of England.

In Scotland, where transport is devolved to the Scottish Government, Transport Scotland has extended and continues to expand electrification, for example, on the Airdrie–Bathgate rail link. This is part of a larger plan that has seen many major routes in central Scotland electrified, including the main – route. They have pursued electrification with multiple schemes in the Central Belt. All these have been 25kVAC, as in England and Wales.

In July 2012 the UK government announced £4.2billion of new electrification schemes, all at 25kVAC and reconfirmed schemes previously announced by Adonis. These were to be Northern Hub, Great Western Main Line, South Wales Main Line, Midland Main Line, Electric Spine, Crossrail, Gospel Oak to Barking line and West Midlands suburban lines including the Cross-City Line.

On 25 June 2015, the government announced that some of the electrification projects would be delayed or cut back because of rising costs. Electrification work was to be "paused" on the Trans-Pennine route between York and Manchester and on the Midland main line between Bedford and Sheffield. Electrification of the Great Western main line would go ahead but the status of the Reading–Newbury and Didcot–Oxford sections was unclear.[8]

However, in September 2015, the electrification work was "un-paused", but with a delayed completion date.[9] Since then there have been regular updates including one published in October 2016.[10]

On 20 July 2017, Chris Grayling the Secretary of State for Transport cancelled a number of electrification projects citing disruptive works and use of bi-mode technology as an alternative.[11]

Electrification has not been without controversy with cancellations and various appearances of the Secretary of State for Transport called before the Transport Select Committee. The Transport Select Committee published its report into various matters including regional investment disparity on the railways and calling again for the reinstatement of various cancelled electrification schemes.[12]

A written question was submitted and answered in parliament regarding route miles electrified in the years 1997–2019.[13]

In March 2019, the Railway Industry Association published a paper on Electrification cost challenge suggesting ways forward and a rolling program of electrification.[14]

Future of third rail

See also: Electric Spine. In June 2011 Peter Dearman of Network Rail suggested that the third-rail network will need to be converted into overhead lines. He stated: "Although the top speed is 100mph, the trains cannot go over 80mph well and 25% of power is lost from heat." Agreeing that conversion would be expensive, he said that the third rail network is at the limit of its power capability, especially as trains become more advanced in technology.[15] The July 2012 Department for Transport High Level Output Specification for Network Rail Control Period 5 includes the conversion of the South West Main Line between and from 750VDC third rail to 25kVAC overhead as part of a scheme to improve rail freight capacity from Southampton Port. This conversion would be a pilot scheme to develop a business case for full conversion of the third-rail network.[16] The Office of Rail and Road (ORR) has also stated that, on safety grounds, third-rail 750VDC has a limited future.[17]

Existing systems – overhead line (OHL)

National Rail: 25 kV, 50 Hz AC overhead

British Railways chose this as the national standard for future electrification projects outside of the third rail area in 1956. Following this, a number of lines that were originally electrified at a different voltage were converted, and a number of lines have been newly electrified with this system. Work started in the late 1950s. The first major electrification project using 25 kV was the West Coast Main Line (1959–1974). Initially this was Crewe, Manchester and Liverpool south into London and Birmingham. Weaver Junction north to Glasgow followed later. The 25 kV network has been gradually expanded ever since:

Existing

West Coast Main Line

see Northampton loop.

see Rugby–Birmingham–Stafford line.

Midland Main Line

See also: Thameslink.

High Speed 1
East Coast Main Line
West Anglia / Fen Line:This covers the lines from (Bethnal Green Junction) to,, and . In the 1960s, the lines to Chingford, Enfield Town and Cheshunt were electrified at 6.25kV, from Cheshunt to and Hertford East at 25kV. The Lea Valley line between Coppermill Junction and Cheshunt was electrified at 25kV in 1969. All the 6.25kV areas were converted to 25kV in 1983. In 1987, electrification was extended from Bishop's Stortford to Cambridge at 25kV. In 1990 the line to opened, and in 1992 electrification was extended from Cambridge to along the Fen Line.
Great Eastern Main Line

Converted from 6.25 kV/1,500 V DC to a combination of AT and FT 25 kV Mark GE (Great Eastern) between 1976 and 1980. Presently being upgraded to the GEFF (Great Eastern Furrer + Frey) range altering the catenary from a compound to simple sagged arrangement.

London, Tilbury and Southend line to . The majority was originally electrified at 6.25 kV, final sections converted to 25 kV in March 1989.
London OvergroundLocal lines within London electrified with 25 kV are:
West Midlands

electrified 1993

New Street to completed 2017

Manchester and North West area

electrified in 2015 as part of the Northern Hub project.

including branch to

via Bolton and completed 2019

completed 2018

branch of the WCML, electrified in the wake of the BR 1955 Modernisation Plan

branch of the WCML, electrified in the wake of the 1955 Modernisation Plan

Leeds areaIn 1994, a project to electrify some of the local lines around Leeds was given authority to proceed. The project was called the "Leeds North West Electrification", which electrified:
Edinburgh:

Edinburgh Waverley to . The service is by DMUs, pending reopening of part of the Waverley Route.

Edinburgh Waverley to

some North Berwick Line trains continue to . Intercity trains from the ECML continue to Glasgow Central.

See also: Transport in Edinburgh.

Central Scotland:The route from Edinburgh to Glasgow via Bathgate has been reinstated between Bathgate and and electrified throughout. It opened on 11 December 2010. The electrification of the main inter-city route between Edinburgh and Glasgow Queen Street High Level via Falkirk was completed in 2017. The project, known as the Edinburgh to Glasgow Improvement Programme, entailed infill electrification in the Glasgow area and Greenhill Junction to Stirling, Dunblane and Alloa, which mainly carry commuter services. Electric services on these lines commenced in December 2018.
Glasgow Suburban:Suburban electrification was begun during the 1960s in the wake of the BR 1955 Modernisation Plan. Electrification was piecemeal and is still incomplete, with a few commuter lines still unelectrified such as the East Kilbride branch and Glasgow to Anniesland via Maryhill, and the mainline from Glasgow to Carlisle via Kilmarnock and Dumfries.

See also: Strathclyde Partnership for Transport and Transport in Glasgow.

The Glasgow Suburban railway network can be divided into three main areas:

also known as the "Glasgow North Electric Suburban Line", one of the first lines in Glasgow electrified in 1960 (and to Glasgow Queen Street (Low Level) and to and).

between and via Glasgow Central (Low Level) to Hamilton Circle,, and (via Hamilton, Motherwell or Holytown). There is also peak service to .On the Glasgow–Edinburgh via Carstairs line, some North Berwick Line trains continue to Glasgow Central. A single daily East Coast intercity train from the ECML continues to and from Glasgow Central. The Shotts Line, Junction to was electrified in April 2019. The Cumbernauld Line to and the remaining section of the Motherwell–Cumbernauld line was electrified in mid 2014. The line between Springburn and Glasgow Queen Street (High Level) has not yet been completed. Until Glasgow Queen Street High Level has been electrified, electric Cumbernauld Line trains reverse at Springburn and run through Glasgow Queen Street Low Level station. The Whifflet Line between and via was electrified in late 2014.

2010s Network Rail electrification programme

See main article: List of proposed railway electrification routes in Great Britain. In 2009, Lord Adonis was appointed Secretary of State for Transport. After a gap of more than a decade, electrification was back on the agenda and Adonis announced plans to electrify the Great Western Main Line from London to, as well as infill electrification schemes in the North West of England. In July 2012, the UK government announced £4.2billion of new electrification schemes, all at 25kVAC and reconfirmed schemes previously announced by Adonis. These were to be Northern Hub, Great Western Main Line, South Wales Main Line, Midland Main Line, Electric Spine, Crossrail, Gospel Oak to Barking line and West Midlands suburban lines. Rail transport in Scotland is a devolved matter for the Scottish Government but they too have pursued electrification with multiple schemes in the Central Belt. All these have been 25kVAC also as in England and Wales. Electrification has not been without controversy with cancellations and various appearances of the Secretary of State for Transport called before the Transport Select Committee. The number of route miles electrified in these years was answered to a written question in parliament.[13]

In November 2019 the annual statistics for route miles electrified was published by the DfT and shows that 38% of the UK network is now electrified.[29]

The projects have been subject to cost overruns and delays, and on 8 November 2016 the government announced that several elements of the Great Western Main Line electrification programme would be indefinitely deferred.[30] In an attempt to mitigate and improve the cost situation the Railway Industry Association published a report in March 2019 detailing why costs had risen and suggested ways forward.[14]

However, in the new parliament after the 2019 General election, the Transport Select Committee chaired by Huw Merriman has met on a number of occasions and continued the "Trains fit for the future" enquiry theme started by the previous committee. On 23 March 2021, after many witnesses were called and written and oral evidence considered, a report was released calling for an immediate resumption of electrification in a rolling programme.[31] However, in December 2021 in a story that appeared in the Telegraph it was stated that the Treasury had declined to support the electrification programme.[32] [33] Reputable peer reviewed journals state that electrification is the most relevant technology for reducing transports effect on the environment.[34]

Other systems

1,500 V DC, overhead

Historically, there were more lines electrified at 1,500VDC, but these have all since been either converted to 25kVAC or closed. (see 1,500VDC, overhead (historic))

750 V DC, overhead

Used on several tram systems:

Other overhead systems

Existing systems - third and fourth rails

National Rail: 650 V - 750 V DC, third rail (top contact)

Southern ElectricThe extensive southern third rail electric network covers South London and the southern counties of Hampshire, West Sussex, East Sussex, Surrey and Kent and Dorset,

The London and South Western Railway (L&SWR) third-rail system at 660VDC began before World War I from London Waterloo to suburban destinations. The Southern Railway was formed in the 1923 grouping; it adopted the L&SWR system, and by 1929 the London, Brighton and South Coast Railway (LB&SCR) suburban overhead network was replaced by third rail. The South Eastern Main Line was electrified at 600V, later upgraded to 750VDC. The third rail extended throughout most South London lines out of all its London termini. Throughout the 1930s, there was much main line electrification, including the Brighton Main Line (including East, West Coastways and related routes in 1932–1933), the Portsmouth Direct line (4 July 1937) and to Maidstone and Gillingham (1939).

After World War II, electrification was soon resumed in the newly nationalised British Railways' Southern Region. The BR 1955 Modernisation Plan included the two-stage "Kent Coast Electrification". The Chatham Main Line was completed, followed by the South Eastern Main Line and related lines. The voltage was raised from 660V to 750V.[36] Since then, all electrification has used 750V; lines electrified before then remain at 660V. Attention then switched to the neglected former L&SWR area (then the South Western Division). The South West Main Line (SWML) to Southampton Central and was electrified in 1967 and to in 1988.

During sectorisation in the 1980s, Network SouthEast conducted extensive infill electrification. The Snow Hill tunnel was reopened, enabling Thameslink. The Hastings Line, Eastleigh–Fareham line and the Oxted line (East Grinstead branch) were electrified. This left only a few lines unelectrified: the West of England line, the Wessex Main Line, the North Downs Line, the Oxted line (Uckfield branch), the Marshlink line and the Eastleigh–Romsey line.

Merseyrail
  • Two lines of the Merseyrail network; the Northern line and the Wirral line use 750VDC third rail[37] [38] (see Suburban electrification of the London, Midland and Scottish Railway for its history).
    Island Line (Isle of Wight)
  • The single remaining national rail line on the Isle of Wight, from Ryde Pierhead to Shanklin (with the Wroxall to Ventnor section closed), was electrified in 1967, so that former London Underground rolling stock could be used, due to the limited height of Ryde Tunnel. The Island Line used 660VDC third rail,[39] as it was a cheaper option to convert the LUL stock into third rail, and implement third rail only on the line. The rolling stock currently used is British Rail Class 484s (D-Train). The line was upgraded to a 750VDC third rail system in 2021 to allow Class 484 units to be used.[40]
    London Overground

    See Suburban electrification of the London, Midland and Scottish Railway for Euston–Watford DC Line history.[41]

    In 1970, the North London DC lines and the Class 501 EMUs used on these services were converted for third-rail operation, with the fourth rail generally being removed on sections not used by London Underground (LUL). Some fourth rail was retained in the Gunnersbury and Queens Park areas for emergency use by LUL. With the closure of Broad Street, the North London line was joined with the Stratford to North Woolwich line; this was electrified with third rail and overhead line as far as Stratford, third rail to North Woolwich. Two branches of the Watford DC line have been closed: to Rickmansworth in 1952 (to passengers, to goods in 1967) and to in 1996.

    The Watford DC line between Queen's Park and and the North London Line between Richmond and Gunnersbury are used by London Overground trains designed for 750V third rail and Bakerloo line trains designed for 630V third and fourth rail. As a compromise, the nominal line voltage is 650V, and since 1970 the centre rail has been bonded to the return running rail.[42] There are no special provisions required at Queens Park, where the two dissimilar systems meet, just a gap longer than one coach of a Bakerloo line train at the entry to (and exit from) the Bakerloo, which operates with a nominal -210V on the fourth rail and +420V on the third rail. There is no bridging of the incompatible systems as trains pass from one to the other since, like all UK electric trains intended to run extensively in tunnels, there is no continuity of traction power circuits between vehicles of the train.

    A similar arrangement applies between Putney Bridge and Wimbledon, where the District line runs over tracks owned by Network Rail, which is also used by South Western Railway, though normally only for stock movements.

    Northern City Line

    The Northern City Line connects the East Coast Main Line to Moorgate. It was isolated by the abandonment of the 1930s New Works Programme (and the development of the Metropolitan Green Belt). Tube services were truncated at its northern end by the Victoria line in 1964 at Drayton Park. The remainder was handed over to British Rail in 1975 in conjunction with the suburban electrification of the East Coast Main Line. The line uses third-rail DC electrification between Moorgate and Drayton Park, where trains switch to 25kVAC overhead.

    630 V DC, fourth rail (top contact)

    London Underground
  • The London Underground is a large metro system operating across Greater London and beyond, commonly known as "the Tube". Its 408km (254miles)[43] is made up of 11 lines; electrification began during the 1890s. It was largely unified between 1900 and 1910 and nationalised in 1933, becoming the railway component of London Transport (LT). A major expansion programme (the "New Works") was launched, in which LT took over several urban branches of mainline railways.

    The Underground is mostly in North London; its expansion into south London was limited by geology unfavourable to tunnelling and by the extensive main-line network, much of which was being electrified (see "Southern Electric").The Underground uses a relatively uncommon four rail system of electrification. Two standard gauge rails are the running rails; the outer third rail carries positive current at +420VDC and the inner fourth rail is the negative return at –210VDC, giving a supply voltage of 630VDC. The chief advantage of the fourth-rail system is that, in tunnels with a metallic (usually cast-iron) lining, the return traction current does not leak into the lining causing electrolytic corrosion there or in adjacent utility mains. It also means that the two running rails are available exclusively for track circuits.

    The surface sections use the fourth rail solely for operational consistency: the system shares track with Network Rail in several places. Where the track is shared with 750V third-rail stock, the central rail is bonded to the running rails and the outside rail electrified at 660V. This allows both types of train to operate satisfactorily. The suburban network of the London & North Western Railway (LNWR) was electrified in co-operation with the Underground, but during the 1970s British Rail introduced third-rail EMUs and the sections of the LNWR suburban network not used by the Underground had the fourth rail removed (see "London and North Western Railway", above).

    The Underground has carried out studies to consider raising the voltage above the present 630V nominal.[44] New equipment at their substations does allow for a future increase to a standard 750V nominal. In addition, the electrical equipment of new trains are also based on the use of 750V rated equipment. So, whilst new equipment is being designed to for 750V operation, no decision to increase the voltage has yet been made public by the Underground.

    As part of the Four Lines Modernisation project, the subsurface lines have been upgraded to 750V DC fourth rail operation, which is supported by the newer S7 and S8 stock.[45] Where S-stock trains regularly interline with deep-level tube stock or where power supplies are shared, the voltage has been kept at 630V DC since the rolling stock currently used on the Jubilee line and the Piccadilly line are incompatible with the higher voltage. As of February 2024, the only parts of the subsurface network which remain at a nominal 630V are: between Finchley Road and Harrow-on-the-Hill (where the alignment and supply is shared with the Jubilee line), between Finchley Road and Uxbridge (where tracks are shared with the Piccadilly Line) and between Baron's Court and Ealing Broadway (where tracks are shared with the Piccadilly Line) but not on the Richmond and Wimbledon branches which have been upgraded to 750V operation.[46] The upgraded system allows for regenerative braking and the associated voltage surges, up to 890V on the higher voltage tracks and up to 790V or 650V on the remaining 630V tracks.

    750 V DC, third rail (bottom contact)

    Docklands Light RailwayThis uses bottom-contact composite third rail, with an aluminium body and a steel contact surface. The advantage of this is a low-resistance, high-current-capacity rail with a durable steel surface for current collection. The rail may be surrounded by insulating material on the top and sides to reduce the risk of electrocution to railway staff and trespassers. The bottom-contact system is less prone to derangement by snow than top contact.

    750 V DC, fourth rail (top contact)

    Waterloo and City lineThis system is unique to this line of London Underground operated railways. The use of 750V came about because the line was originally owned by Railtrack and operated by Network South East. It was upgraded in 1992/3 for both traction supply and rolling stock. Railtrack upgraded the original three rail system to four rail to solve problems with electrolytic damage to the iron tunnel linings (the reason four rail operation was adopted for all other tube lines). They also changed the voltage to 750V which had been adopted as their standard DC operating voltage some years earlier. The line was subsequently sold to London Underground in 1994 who inherited the non-standard system (for London Underground). The line is still powered from its own substation located in the Waterloo depot.

    As part of the Four Lines Modernisation project, most of the subsurface network also operates at 750VDC fourth rail.

    600 V DC, third rail (top contact)

    250 V DC, third rail (top contact)

    110 V DC, third rail (top contact)

    100 V DC, four rail

    Electrical Control

    Mainline network

    All electrified railways require Electrical Control Rooms (ECR) to administer the supply of traction current and respond to fault conditions or emergency incidents. Until 2016, electrical control was carried out by 13 standalone ECRs constructed during the British Rail era.[47] However, it is now intended that electrical control will be transferred to 8 of the 12 Rail Operating Centres (ROC) along with all signalling and train control in general.[48] In addition, the Crossrail and South Wales Metro projects have introduced new electrical control rooms onto the heavy rail network which are part of those systems' respective Route/Rail Control Centres (RCC).

    Including the legacy standalone ECRs (all of which are still operational to differing degrees); the new ECRs that have been commissioned as part of ROCs; smaller systems' RCCs; and HS1's control centre at Ashford, the mainline network's electrification is currently controlled at 20 locations.

    ECR locations[49] [50] [51] !System!Name!Status!Routes Controlled
    25kv ACOLE (50hz)Romford ECRPart of Romford ROCGreat Eastern Main Line, West Anglia Main Line, London Tilbury and Southend Line, Fen Line, Lea Valley Lines, Shenfield–Southend Line, Sunshine Coast Line, Crouch Valley Line, Braintree Branch Line, Mayflower Line, Romford–Upminster Line, Hertford East Branch, Chingford Branch, North London Line (from Stratford to Camden Road), Gospel Oak to Barking Line (from Barking to South Tottenham).
    York ECR1Part of York ROCEast Coast Main Line (from London Kings Cross to Chathill), Wakefield Line, Cambridge Line, Hertford Loop Line, Airedale Line, Wharfdale Line
    Derby ECRPart of East Midlands Control CentreMidland Main Line (from London St Pancras to Kettering), Oakham–Kettering Line (from Kettering to Corby)
    Didcot ECRPart of Thames Valley ROCGreat Western Main Line (from London Paddington to Chippenham), South Wales Main Line (from Swindon to Cardiff Central), Heathrow Link Line, Reading–Taunton Line (from Reading to Newbury)
    Ashford ECRPart of Ashford Control Centre (AFC)High Speed 1
    Eurotunnel Rail Control CentreOne part of Eurotunnel RCC2Channel Tunnel (including Folkstone and Calais-Coquelles terminals)
    Crossrail Route Control Centre (CRCC)[54] One part of CRCC which is a separate department inside Romford ROCCrossrail Central Operating Section
    Core Valley Lines Integrated Control Centre (CVLICC)[55] One part of the CVLICC located at the new depot in Taff's Well.Cardiff City Line, Merthyr Line, Rhondda Line
    Crewe ECRLegacy standalone ECRWest Coast Main Line (from Nuneaton to Stafford)(from Stafford to Preston via Wigan)(from Preston to Great Strickland), Colwich–Stone Line, Chase Line (from Walsall to Rugeley Trent Valley) Stafford–Manchester Line, Crewe–Manchester Line, Crewe–Liverpool Line, Crewe–Derby Line (from Crewe to Kidsgrove), Preston and Blackpool North Branch, Liverpool–Wigan Line, Chat Moss Line, Manchester–Preston Line, Styal Line, Buxton Line (from Manchester Piccadilly to Hazel Grove), Glossop Line, Huddersfield Line (from Stalybridge to Manchester Victoria and Manchester Piccadilly).
    • Electrification under construction
    Rugby ECR1West Coast Main Line (from London Euston to Nuneaton), Northampton Loop Line, Rugby–Birmingham–Stafford Line, Birmingham Cross City Line, Chase Line (from Birmingham New Street to Walsall both via Aston and via Soho East Junction), Walsall–Wolverhampton Line, St Albans Abbey Line, West London Line (from Willesden Junction to North Pole junction), Gospel Oak to Barking Line (South Tottenham to Gospel Oak), North London Line (from Camden Road to Acton Central),
    • DC lines:
      • North London Line
        • 750v DC third rail (from Acton Central to Gunnersbury junction)
      • Watford DC line:
              • 750v DC third rail from London Euston to Queen's Park 750v DC fourth rail[57] from Queen's Park to Harrow & Wealdstone
        • 750v DC third rail from Harrow & Wealdstone to Watford Junction.
    Cathcart ECRWest Coast Main Line (from Great Strickland to Glasgow Central), East Coast Main Line (from Chathill to Edinburgh Waverley), Glasgow–Edinburgh via Falkirk Line, North Clyde Line, Glasgow–Edinburgh via Carstairs Line, Shotts Line, Glasgow–Dundee Line (from Glasgow Queen Street to Dunblane), Cumbernauld Line, Argyle Line, Ayrshire Coast Line, Cathcart Circle Line, Croy Line, Inverclyde Line, Motherwell–Cumbernauld, Paisley Canal Line, Glasgow South Western Line (from Glasgow Central to Barrhead), Whifflet Line, Edinburgh–Dunblane Line, North Berwick Line
    Asfordby ECR1Old Dalby Test Track (includes some length of dual voltage and fourth rail DC track)
    750v DCtop contact third railLewisham ECRSouth Eastern Main Line (from Charing Cross/Cannon Street to Chelsfield), Brighton Main Line (from London Victoria to Clapham Junction; from London Bridge to Brockley), Chatham Main Line (from London Victoria to St Mary Cray either via Peckham Rye or via Kent House), Portsmouth Line (from Peckham Rye to East Dulwich), South London Line, East London Line, West London Line (from North Pole junction to Clapham Junction), Catford Loop Line, North Kent Line (from Lewisham to Gravesend), Dartford Loop Line, Bexleyheath Line, Mid-Kent Line, Greenwich Line, Holborn Viaduct–Herne Hill Line, Crystal Palace Line (from Birkbeck to Beckenham Junction), Bromley North Line, Greenwich Park Branch Line
    Paddock Wood ECR3South Eastern Main Line (from Chelsfield to Folkstone West), Chatham Main Line (from St Mary Cray to Rainham), North Kent Line (from Gravesend to Strood), Ashford–Ramsgate Line (from Ashford International to Wye), East Coastway Line (from Bexhill to Hastings), Hastings Line, Kent Downs Line, Medway Valley Line,
    Canterbury ECRSouth Eastern Main Line (from Folkstone West to Dover Priory), Chatham Main Line (from Rainham to Ramsgate/Dover Priory), Ashford–Ramsgate Line (from Wye to Ramsgate), Kent Coast Line, Sheerness Line
    Brighton ECR
    Selhurst ECR4Crystal Palace Line (from Balham to Birkbeck), Epson Downs Branch
    Raynes Park ECRSouth West Main Line (London Waterloo to Hersham), Portsmouth Line (from Ewell East to Leatherhead), Waterloo–Reading Line (from London Waterloo to Egham), Staines–Windsor Line, Hounslow Loop Line, Island Line, New Guildford Line, North London Line (750VDC fourth rail[58] - from Gunnersbury junction to Richmond), Chessington Branch Line, Kingston Loop Line, Hampton Court Branch Line, Shepperton Branch Line, Waterloo & City Line5 (750VDC fourth rail), Putney to Wimbledon Line (750VDC fourth rail)
    Eastleigh ECRSouth West Main Line (from Hersham to Weymouth), Portsmouth Direct Line, Waterloo–Reading Line (from Egham to Reading), West Coastway Line (from Emsworth to Southampton Central), Eastleigh–Fareham Line, Alton Line, Ascot–Ash Vale Line, Chertsey Branch Line, Lymington Branch Line, North Downs Line (from Reading to Wokingham)
    Sandhills ECRMerseyrail Northern Line, Merseyrail Wirral Line
    Notes1: These AC ECRs also operate some DC third or fourth rail tracks. 2: Eurotunnel RCC has two locations (Folkstone and Coquelles), both of which can take full control of Channel Tunnel systems. 3: Paddock Wood ECR also controls AC and dual-voltage tracks in and around Ashford International and Dollands Moor yard while Ashford AFC controls the Up & Down CTRL lines that bypass those two locations. 4: Most operations at Selhurst have been moved to Brighton ECR with the remainder likely to also be transferred to Brighton in the near future.[59] 5: For historical reasons, the Waterloo & City Line's electrification is not controlled by London Underground's infrastructure despite being owned and operated by TfL since 1994.[60]

    Obsolete systems

    Great Britain has used different electrification systems in the past. Many of these date from the early part of the 20th century, when traction electricity was in the experimental stage. This section describes each system, in order of decreasing voltage.

    6,600V, 25Hz AC, overhead

    Used for an early trial of electrification; opened between 13 April and 14 September 1908. In 1953, it was converted to 50Hz, and operated until 1966.[61]

    6,250V 50 Hz AC, overhead

    During the initial electrification of parts of the network to 25kV50HzAC overhead, the initial solution to the limited clearance problems in suburban areas (due to numerous tunnels and bridges) in London and Glasgow was to use the lower voltage of 6.25kV. Later technological improvements in insulation allowed these areas to be converted to 25kV. The last sections of 6.25kV were converted during the 1980s.

    London, Tilbury and Southend Lines:The 6.25kV section was from Fenchurch Street to beyond Barking, with changeovers there on both the Upminster and Tilbury lines. The section between and was also at 6.25kV.[62] The remainder was at 25kV. The sections electrified at 6.25kV were converted to 25kV during the early 1980s.
    Great Eastern Lines:The line from Liverpool Street to Southend Victoria was originally electrified at 1,500VDC overhead during the 1940s-50s. During the early 1960s, the whole of this line was converted to 6.25kVAC overhead, while the main line east of Shenfield was progressively electrified at 25kV, with changeover east of Shenfield. During the early 1980s, the line was again converted, this time to 25kV.

    The Cambridge line and branches from Liverpool Street was electrified in the early 1960s, with 6.25kV out to a changeover at Cheshunt, and 25kV beyond. The Chingford and Enfield lines were thus at 6.25kV throughout. This route was again fully converted to 25kV in the early 1980s.

    As part of the electrification onwards to Cambridge and Norwich in the 1980s, electric locomotives were transferred to these routes from the West Coast route. These locomotives would not have been able to operate at 6.25kV.

    Glasgow Suburban network:

    On the North Clyde, the central section between Parkhead and before Dalmuir (Clydebank loop) and Westerton (Anniesland loop) were at 6.25kV, with the outer sections at 25kV. The Bridgeton and Springburn branches were thus at 6.25 kV throughout. The sections electrified at 6.25kV were converted to 25kV during the early 1980s.

    On the South Clyde, the route from Glasgow Central around the Cathcart Loop was initially at 6.25kV, with changeovers to 25kV at Kings Park and Muirend on the Motherwell and Neilston routes. These lines were progressively converted to 25kV in the 1970s and 1980s.

    See also: Strathclyde Partnership for Transport and Transport in Glasgow.

    3,500 V DC, overhead

    Bury to Holcombe Brook:This was electrified by the Lancashire and Yorkshire Railway in 1913 as part of a trial system for export. The system was converted to third rail in 1918 (see below).[63]

    1,500 V DC, overhead (historic)

    After World War I, the UK Government set up a committee to investigate the various systems of railway electrification; in 1921, it recommended that 1,500VDC overhead should be the future national standard.[4] Several schemes were implemented in its wake, but the Great Depression and World War II meant that very little work was done. Technological advances after 1945 meant that the 25kVAC system was adopted instead for the West Coast Main line and Glasgow suburban electrification (as set out in the BR 1955 Modernisation Plan). However, at the same time, large amounts of money had been (and were still being) spent converting several lines to 1,500VDC.

    Manchester, South Junction and Altrincham Railway
  • A joint LMS and LNER scheme, it opened on 11 May 1931. The success of this scheme influenced LNER's later electrification schemes. The line was converted to 25kVAC in 1971, but the stretch between Altrincham and Trafford Bar (plus the stretch between Trafford Bar and the Cornbrook viaduct) were later incorporated into Manchester Metrolink and converted again (this time to 750VDC).[64]
    Manchester–Sheffield–Wath
  • Known as the Woodhead Route, the LNER chose this hilly (and busy) main line for its first mainline electrification, with work beginning in 1936.[65] Due to the Depression and World War II, it was not completed until the 1950s. After completion, the government chose to standardise on 25kVAC instead, leaving the Woodhead Route and the few other 1,500VDC lines isolated and non-standard. The passenger locomotives were sold in 1969 and saw further service in the Netherlands. In a subsequent rationalisation, BR closed much of this route east of Hadfield in 1981 in favour of the more southerly Hope Valley line, which serves more local communities. A section of the line between Manchester, Glossop and Hadfield remained open as part of the Manchester suburban network, and was operated by Class 506 EMU's, until it was converted to 25kVAC in December 1984.
    Shenfield Metro:The LNER decided to electrify the to section of the Great Eastern Main Line (GEML), known as the Shenfield Metro. Civil engineering works began during the 1930s, but World War II intervened. Work was completed in 1949 and extended to and in 1956, using Class 306 (AM6) EMUs.[66] It was converted on 4–6 November 1960, in the wake of the BR 1955 Modernisation Plan, to the new standard of 25kVAC (initially with some sections at 6.25kV). The rest of the GEML was subsequently electrified.
    Shildon to Newport:This line ran from Shildon (County Durham) to Newport (near Middlesbrough). The route was initially over the 1825 Stockton-to-Darlington line, then via Simpasture Junction (the former Clarence railway) through Carlton, Carlton Junction to Carlton South Junction, Bowesfield West Junction to Bowesfield Junction, through Thornaby and ending at Erimus Yard (Newport East). In the wake of the electrification of Tyneside by the NER, this coal-carrying line was electrified between 1 July 1915 and 1 January 1916 as a planned precursor to electrifying NER's busy York to Newcastle main line (part of the East Coast Main Line). The LNER removed this electrification system in 1935 (between 7 January and 8 July); the decline in the coal market making it economically unfeasible to undertake the significant renewals required to continue electric operation. The locomotives were stored for other electrified routes.[67] [68] [69]

    1,200 V DC, third rail (side-contact)

    Manchester Victoria - Bury
  • In 1916, the Lancashire and Yorkshire Railway (L&YR) electrified the Bury Line between Manchester Victoria and Bury Bolton Street (later switched to Bury Interchange) using 1,200VDC third rail (side contact). The line between Bury and Holcombe Brook which had been electrified using 3,500VDC overhead in 1913 was converted to this system in 1918. As the electrification scheme was a success, the L&YR drew up plans to electrify the Oldham Loop Line with the same system in the early 1920s. These plans were abandoned when the L&YR became part of the London and North Western Railway in 1922. The system survived until it was abandoned in 1991, when the line was converted to a 750VDC overhead line system and became part of the Manchester Metrolink.[70] [71] [72]

    650 V DC, overhead

    600 V DC, third rail

    Tyneside Electrics
  • This was electrified in 1904, in response to extensive competition from new electric trams. The concept was a success for the North Eastern Railway (NER), a noted pioneer in electrification, as passenger numbers returned to pre-tram levels.[73] As the stock reached life expectancy in 1937, the network was remodelled by London and North Eastern Railway (LNER) to reflect the changing industrial and residential makeup of the area.[74] Electrified, at the same time, was the dockside branch, where a pair of Class ES1 (formerly NER No.1 and 2) locomotives were introduced in 1905. These British Thomson-Houston locomotives operated from both the third rail and overhead line. British Rail removed the electrification between 1963 and 1967, citing the changing industrial and population makeup of the area which reduced the need for electric traction. Much of the Tyneside network was later re-electrified, (using 1500VDC overhead), as the Tyne and Wear Metro.

    525 V DC, third rail

    Liverpool Overhead Railway
  • The Liverpool Overhead Railway was one of the earliest electric railways in Great Britain. The first section, between Alexandra Dock and Herculaneum Dock, was opened in 1893. The line connected with Lancashire and Yorkshire Railway's North Mersey Branch. It was never nationalised, and closed on 30 December 1956 due to extensive corrosion throughout its iron infrastructure (which was deemed uneconomical to replace).

    500 V DC, overhead

    500 V DC, third rail

    City and South London Railway
  • The City and South London Railway electrification was unusual (compared with later schemes) in that it used a three-wire DC system. This meant that, although the offset centre third rail was electrified at +500volts in the northbound tunnel, it was electrified at -500volts in the southbound tunnel. The motors on the locomotives and the incandescent electric lamps in the carriages worked, regardless of the polarity of the supply.The three-wire system was adopted because the initial system was fed directly from the dynamos in the surface power plant at the Stockwell end of the line. It was important to minimise the voltage drop as much as possible, bearing in mind the rather steep gradient on the approach to King William Street Station.

    440 V DC, third rail

    London Post Office Railway
  • Underground railway under London operated by the Post Office. Operated between 1927 and closure in 2003. Partially re-opened as a tourist attraction in 2017.

    See also

    Further reading

    525 V DC, third rail

    630 V DC, fourth rail

    650 V DC, third rail

    750 V DC, third rail

    1,500 V DC, overhead

    6.6 kV 25 Hz AC, overhead

    25 kV 50 Hz AC, overhead

    External links

    Notes and References

    1. https://dataportal.orr.gov.uk/media/g3xjpk2p/infrastructure-and-assets-2022-23.pdf Rail Infrastructure and Assets 2022-23 Annual Statistical Release
    2. [Network Rail]
    3. News: 42bn of new rail schemes unveiled. The Independent. 23 March 2014. 16 July 2012.
    4. Electrification of Railways Advisory Committee Final Report . London . HMSO . 1921 .
    5. Modernisation of British Railways: The System of Electrification for British Railways . London . British Transport Commission . 1956 .
    6. https://www.gov.uk/government/publications/delivering-a-sustainable-railway Delivering a Sustainable Railway - White Paper CM 7176
    7. Rail Magazine 3–16 June 2009 "Network Rail's strategy to extend electrification by 3,000 miles" page 6
    8. Web site: Network Rail upgrade delayed by government. 25 June 2015. BBC News.
    9. News: Midland Main Line electrification unpaused – but delayed by years.
    10. Web site: Archived copy . 2017-01-08 . dead . https://web.archive.org/web/20161013075229/http://www.networkrail.co.uk/Enhancements-Delivery-Plan-Sept-2016.pdf . 13 October 2016 . dmy-all .
    11. News: Rail electrification plans scrapped by government - BBC News. BBC News. 20 July 2017.
    12. Web site: Transport Select Committee Report June 2018.
    13. Web site: Railways: Electrification:Written question - 219526. UK Parliament. en. 2019-02-27.
    14. Web site: Electrification Cost Challenge Report. www.riagb.org.uk. 2019-03-14.
    15. Rail Magazine: Issue 673, Page 14-15, 29 June - 12 July 2011.
    16. http://assets.dft.gov.uk/publications/hlos-2012/railways-act-2005.pdf paragraph 37
    17. Web site: ORR's Policy on Third Rail DC Electrification Systems . orr.gov.uk . ORR . 26 September 2022 . 27 March 2015.
    18. Web site: Cardiff electric services go live. 2020-01-07. Railway Gazette International. en. 2020-05-19.
    19. Web site: Great Western electric operation extends west. 2018-12-31. International Railway Journal. 2020-05-19.
    20. Web site: November 18, 2021. Integrated Rail Plan for the North and Midlands. UK Government.
    21. Web site: Spades in ground as government delivers on rail investment promise for North and Midlands. 2021-12-21. GOV.UK. en.
    22. Web site: 2021-12-21. Main works on next stage of Midland Main Line electrification due to begin. 2021-12-21. RailBusinessDaily. en-US.
    23. Web site: Rail industry welcomes progress on Midland Mainline electrification. 2021-12-21. www.riagb.org.uk.
    24. Hakimian. Rob. 2021-12-22. DfT slammed for 'insulting' claim that IRP pushed through long-delayed Midland Main Line electrification. 2021-12-22. New Civil Engineer. en.
    25. Web site: NSE Chronology January 1988 to December 1988. Network SouthEast Railway Society. 30 January 2015. https://web.archive.org/web/20141010024553/http://www.networksoutheast.net/jan-1988-to-dec-1988.html. 10 October 2014. dead. dmy-all.
    26. Web site: 2018-01-11. ECML: Electrification as it used to be – Rail Engineer. https://web.archive.org/web/20180111165146/https://www.railengineer.uk/2017/11/27/ecml-electrification-as-it-used-to-be/. dead. 2018-01-11. 2021-07-31.
    27. Little . Stuart M. . Greater Glasgow's Railway Network . Scottish Transport . 33 . 2–12 . December 1979. 0048-9808.
    28. Web site: Garry Keenor . The Rebirth of AyrLine: Electrification to Ayr / Ardrossan / Largs – 1986–87 . Railwaysarchive.co.uk . 2010-11-13 . 2010-11-17.
    29. Web site: 2018-2019 Rail Infrastructure assets. 2019-11-07.
    30. News: Great Western electrification: Intercity line work 'deferred' . BBC News . 8 November 2016 . 10 November 2016.
    31. Web site: MP's call for immediate start of 30-year rail electrification plan. 2021-03-23. Rail Technology Magazine. en.
    32. Web site: 2021-12-13. Reports: Treasury shelves £30bn plan to electrify UK railways over cost concerns. 2021-12-13. www.businessgreen.com. en.
    33. Web site: 2021-12-11. Treasury blocks £30bn plan to electrify Britain's railways. 2021-12-13. B2BCHIEF: CREATE THE BUZZ. en.
    34. Pulido-Sánchez . Daniel . Capellán-Pérez . Iñigo . Castro . Carlos de . Frechoso . Fernando . 2022-12-07 . Material and energy requirements of transport electrification . Energy & Environmental Science . en . 15 . 12 . 4872–4910 . 10.1039/D2EE00802E . 1754-5706. free .
    35. Web site: The Wirral Tramway Light Railway Order 1994. www.legislation.gov.uk.
    36. Web site: Southern Electric Locomotives . Electron . 1989 . 2007-01-19.
    37. Web site: Merseyrail . NedRailways . 2010-11-17 . dead . https://web.archive.org/web/20090827075926/http://www.nedrailways.com/html/merseyrailkeyfacts.html . 27 August 2009 .
    38. Web site: Eric Peissel & Robert Schwandl . Europe > UK > England > LIVERPOOL MERSEYRAIL . UrbanRail.Net . 2010-11-17 . dead . https://web.archive.org/web/20101109190741/http://www.urbanrail.net/eu/liv/liverpool_merseyrail.html . 9 November 2010 . dmy-all .
    39. Web site: Network Rail – Route Specifications: Wessex . networkrail.co.uk . Network Rail Limited . 26 September 2022 . 41–42 . March 2016 . 6 May 2021 . https://web.archive.org/web/20210506021757/https://www.networkrail.co.uk/wp-content/uploads/2016/12/Route-Specification-2016-Wessex.pdf . dead .
    40. News: Trains return to the Isle of Wight after £26m upgrade. November 2, 2021. International Railway Journal. David Briginshaw.
    41. Web site: London And North Western Railway Electrification to Watford and Richmond . Easyweb.easynet.co.uk . 2010-11-17.
    42. Book: Horne, Mike . The Bakerloo line: An Illustrated History . 2001 . Capital Transport . Harrow Weald . 1-85414-248-8 . 71 .
    43. Web site: Tube facts . London Underground . 2007 . 2007-01-03 . https://web.archive.org/web/20070101010105/http://www.tfl.gov.uk/tube/company/facts.asp . 2007-01-01.
    44. http://conferences.theiet.org/reis/past-presentations/2013/-documents/presentation-carmichael.cfm . June 2013 . Upgrading The London Underground Power Supply System . Phil . Carmichael . London Underground Limited . 14 . Power System Planning - Optimal Solutions . PDF . 26 April 2014 .
    45. Web site: Giffen . Amco . 2018-08-21 . 4LM DC Traction Power Upgrade . 2024-05-22 . AmcoGiffen . en.
    46. Web site: 2024-01-15 . Electrification voltage after the 4LM project - a Freedom of Information request to London Underground Limited . 2024-05-22 . WhatDoTheyKnow . en.
    47. Web site: Kessell . Clive . 2015-12-16 . The future for electrification control . 2024-05-21 . Rail Engineer . en-GB.
    48. Web site: 11 September 2013 . New contract sparks revolution in electrical control. . 2024-05-21 . Network Rail Media Centre . english.
    49. "Anglia", "London North Eastern", "Wales & Western", "Kent, Sussex & Wessex." Network Rail Sectional Appendix (March 2024). Retrieved 11 May 2024, available here.
    50. "HS1 Sectional Appendix". Network Rail Sectional Appendix (November 2013). Available here.
    51. Book: Brailsford, Martyn . Railway Track Diagrams . TRACKmaps . 2022 . 978-1-9996271-5-7 . 5th . 4: Midlands & North West . Frome, Somerset, UK.
    52. "London North Eastern". Network Rail Sectional Appendix (March 2024): LN627-8.
    53. "London North Eastern". Network Rail Sectional Appendix (March 2024): LN814, LN818, LN830.
    54. Web site: 12 Feb 2021 . A People Centred Design: Human Factors Integration of the Crossrail Route Control Centre . 2024-05-21 . Crossrail Learning Legacy . en-US.
    55. Web site: Taff’s Well Depot - ambitious design at the heart of the South Wales Metro . 2024-05-21 . Amey . en.
    56. Web site: Wigan to Bolton electrification . 2024-05-22 . Network Rail . en-GB.
    57. "London North Western (South)". Network Rail Sectional Appendix (March 2024): 46.
    58. Web site: 2024-01-15 . Electrification voltage after the 4LM project - a Freedom of Information request to London Underground Limited . 2024-05-22 . WhatDoTheyKnow . en.
    59. Web site: 2022-10-24 . Brighton Electrical Control Room (ECR) Refurbishment Project for Network Rail . 2024-05-22 . Enable Infrastructure . en-GB.
    60. Web site: Ford . Jan . 2015-10-07 . Jan Ford's World: London Underground: The Waterloo & City Line . 2024-05-24 . Jan Ford's World.
    61. Book: Bairstow . Martin . The 'Little' North Western Railway . 2000 . Martin Bairstow . Leeds . 1-87-1944-21X.
    62. Book: British Rail Locomotives and other motive power: Combined volume . 1968 . Ian Allan Publishing . London . 0-7110-0008-5 . 11 .
    63. http://www.lyrs.org.uk/page14.html Lancashire and Yorkshire Railway Society
    64. Web site: The Manchester South Junction & Altrincham (BR Class 505) Stock . The London & North Eastern Railway (LNER) Encyclopedia . 2007 . 2007-01-17.
    65. Web site: Woodhead Railway and its Electrification . Wortley Top Forge Industrial Museum . 2007 . 2007-04-14 . dead . https://web.archive.org/web/20070311234833/http://www.topforge.co.uk/Photographs/Woodhead.htm . 11 March 2007 . dmy-all .
    66. Web site: The Liverpool Street to Shenfield Route AM6 (Class 306) Stock . The London & North Eastern Railway (LNER) Encyclopedia . 2007 . 2007-01-17.
    67. Williams . Stephen . Nov–Dec 1985 . The Newport - Shildon Electrification of the North-Eastern Railway . Electric Railway Society Journal . 30 . 180 . Electric Railway Society .
    68. Web site: NER locomotive 3 to 12 . Desertrailways.tripod.com . 2010-11-17.
    69. Web site: Locomotive history - NER Bo+Bos . Thewoodheadsite.org.uk . 2010-11-17.
    70. http://www.lyrs.org.uk/page14.html Lancashire and Yorkshire Railway Society - History - P14
    71. http://www.lyrs.org.uk/page15.html Lancashire and Yorkshire Railway Society - History - P15
    72. Wray, Tom (2004). Manchester Victoria Station. Peter Taylor Publications. ISBN 0-9549451-0-7.
    73. Web site: The NER Tyneside Electric Multiple Units . The London & North Eastern Railway (LNER) Encyclopedia . 2007 . 2007-01-17.
    74. Web site: The LNER Tyneside Electric Multiple Units . The London & North Eastern Railway (LNER) Encyclopedia . 2007 . 2007-01-17.