Howrah Bridge in Kolkata | |
Official Name: | Howrah Bridge |
Other Name: | Gateway of Kolkata Grand Old Lady of Calcutta |
Carries: | 4 lanes[1] of Strand Road,[2] pedestrians and bicycles |
Crosses: | Hooghly River (Ganga River)[3] |
Locale: | Howrah and Kolkata |
Maint: | Kolkata Port Trust[4] |
Designer: | M/s. Rendel, Palmer and Tritton |
Design: | Suspension type Steel Bridge[5] and truss arch[6] |
Builder: | Braithwaite, Burn & Jessop Construction Company |
Mainspan: | 15001NaN1 |
Length: | 7051NaN1[7] |
Width: | 711NaN1 with two footpaths of 151NaN1 on either side |
Height: | 821NaN1 |
Clearance: | 5.81NaN1 |
Below: | 8.81NaN1 |
Traffic: | 100,000 vehicles and 150,000 pedestrians |
Material: | Steel |
Toll: | Toll-Free on both ways |
Coordinates: | 22.5851°N 88.3469°W |
The Howrah Bridge is a balanced steel bridge over the Hooghly River in West Bengal, India. Commissioned in 1943,[8] the bridge was originally named the New Howrah Bridge, because it replaced a pontoon bridge at the same location linking the twin cities of Howrah and Kolkata, which are located at the opposite banks of each other. On 14 June 1965, it was renamed Rabindra Setu after the Bengali poet Rabindranath Tagore, who was the first Indian and Asian Nobel laureate.[9] It is still popularly known as the Howrah Bridge.
The bridge is one of four on the Hooghly River and is a famous symbol of Kolkata and West Bengal. The other bridges are the Vidyasagar Setu (popularly called the Second Hooghly Bridge), the Vivekananda Setu and the relatively new Nivedita Setu. It carries a daily traffic of approximately 100,000 vehicles[10] and possibly more than 150,000 pedestrians,[11] easily making it the busiest cantilever bridge in the world.[12] The third-longest cantilever bridge at the time of its construction,[13] the Howrah Bridge is currently the sixth-longest bridge of its type in the world.
In 1862, the Government of Bengal asked George Turnbull, chief engineer of the East Indian Railway Company to study the feasibility of bridging the Hooghly River. He had recently established the company's rail terminus in Howrah. He reported on 19 March, with large-scale drawings and estimates, that:[14]
In view of the increasing traffic across the Hooghly river, a committee was appointed in 1855–56 to review alternatives for constructing a bridge across it.[15] The plan was shelved in 1859–60, to be revived in 1868, when it was decided that a bridge should be constructed and a newly appointed trust vested to manage it. The Calcutta Port Trust was founded in 1870, and the Legislative department of the then Government of Bengal passed the Howrah Bridge Act in the year 1871 under the Bengal Act IX of 1871, empowering the lieutenant-governor to have the bridge constructed with Government capital under the aegis of the Port Commissioners.
Eventually a contract was signed with Sir Bradford Leslie to construct a pontoon bridge. Different parts of the bridge were constructed in England and shipped to Calcutta, where they were assembled. The assembling period was fraught with problems. The bridge was considerably damaged by the great cyclone on 20 March 1874. A steamer named Egeria broke from her moorings and collided head-on with the bridge, sinking three pontoons and damaging nearly 200 feet of the bridge. The bridge was complete in 1874, at a total cost of 2.2 million, and opened to traffic on 17 October of that year.[16] The bridge was then 1528 ft long and 62 ft wide, with 7-foot wide pavements on either side. Initially the bridge was periodically unfastened to allow steamers and other marine vehicles to pass through. Before 1906, the bridge used to be undone for the passage of vessels during daytime only. Since June of that year it started opening at night for all vessels except ocean steamers, which were required to pass through during daytime. From 19 August 1879, the bridge was illuminated by electric lamp-posts, powered by the dynamo at the Mullick Ghat Pumping Station. As the bridge could not handle the rapidly increasing load, the Port Commissioners started planning in 1905 for a new improved bridge.
In 1906[16] the Port Commission appointed a committee headed by R.S. Highet, chief engineer, East Indian Railway and W.B. MacCabe, chief engineer, Calcutta Corporation. They submitted a report stating thatThe committee considered six options:
The committee eventually decided on a floating bridge. It extended tenders to 23 firms for its design and construction. Prize money of £3,000 (45,000, at the then exchange rate) was declared for the firm whose design would be accepted.
The initial construction process of the bridge was stalled due to World War I, although the bridge was partially renewed in 1917 and 1927. In 1921 a committee of engineers named the 'Mukherjee Committee' was formed, headed by R. N. Mukherji, Sir Clement Hindley, chairman of Calcutta Port Trust and J. McGlashan, Chief Engineer. They referred the matter to Sir Basil Mott, who proposed a single span arch bridge. Charles Alfred O'Grady one of the Engineers
In 1922, set up, to which the Mukherjee Committee submitted its report. In 1926 the New Howrah Bridge Act passed. In 1930 the Goode Committee was formed, comprising S.W. Goode as president, S.N. Mallick, and W.H. Thompson, to investigate and report on the advisability of constructing a pier bridge between Calcutta and Howrah. Based on their recommendation, M/s. Rendel, Palmer and Tritton were asked to consider the construction of a suspension bridge of a particular design prepared by their chief draftsman Mr. Walton. On basis of the report, a global tender was floated. The lowest bid came from a German company, but due to increasing political tensions between Germany and Great Britain in 1935, it was not given the contract.[16] The Braithwaite, Burn & Jessop Construction Co. was awarded the construction contract that year. The New Howrah Bridge Act was amended in 1935 to reflect this, and construction of the bridge started the next year.
The bridge does not have nuts and bolts,[17] but was formed by riveting the whole structure. It consumed 26,500 tons of steel, out of which 23,000 tons of high-tensile alloy steel, known as Tiscrom, were supplied by Tata Steel.[16] [18] The main tower was constructed with single monolith caissons of dimensions 55.31m× 24.8m[19] with 21 shafts, each 6.25 metre square.[20] The Chief Engineer of the Port Trust, Mr. J. McGlashan, wanted to replace the pontoon bridge, with a permanent structure, as the present bridge interfered with north–south river traffic. Work could not be started as World War I (1914–1918) broke out. Then in 1926 a commission under the chairmanship of Sir R. N. Mukherjee recommended a suspension bridge of a particular type to be built across the River Hoogly. The bridge was designed by one Mr. Walton of M/s Rendel, Palmer & Triton. The order for construction and erection was placed on M/s.Cleveland Bridge & Engineering Company in 1939. Again World War II (1939–1945) intervened. All the steel that was to come from England were diverted for war effort in Europe. Out of 26,000 tons of steel, that was required for the bridge, only 3000 tons were supplied from England. In spite of the Japanese threat, the then (British) government of India pressed on with the construction. Tata Steel were asked to supply the remaining 23,000 tons of high tension steel. The Tatas developed the quality of steel required for the bridge and called it Tiscrom. The entire 23,000 tons was supplied in time. The fabrication and erection work was awarded to a local engineering firm of Howrah: the Braithwaite, Burn & Jessop Construction Co. The two anchorage caissons were each 16.4 m by 8.2 m, with two wells 4.9 m square. The caissons were so designed that the working chambers within the shafts could be temporarily enclosed by steel diaphragms to allow work under compressed air if required.[20] The caisson at Kolkata side was set at 31.41 m and that at Howrah side at 26.53 m below ground level.
One night, during the process of grabbing out the muck to enable the caisson to move, the ground below it yielded, and the entire mass plunged two feet, shaking the ground. The impact of this was so intense that the seismograph at Kidderpore registered it as an earthquake and a Hindu temple on the shore was destroyed, although it was subsequently rebuilt.[21] While muck was being cleared, numerous varieties of objects were brought up, including anchors, grappling irons, cannons, cannonballs, brass vessels, and coins dating back to the East India Company.The job of sinking the caissons was carried out round-the-clock at a rate of a foot or more per day. The caissons were sunk through soft river deposits to a stiff yellow clay 26.5 m below ground level. The accuracy of sinking the huge caissons was exceptionally precise, within 50–75 mm of the true position. After penetrating 2.1 m into clay, all shafts were plugged with concrete after individual dewatering, with some 5 m of backfilling in adjacent shafts.[20] The main piers on the Howrah side were sunk by open wheel dredging, while those on the Kolkata side required compressed air to counter running sand. The air pressure maintained was about 40 lbs per square inch (2.8 bar), which required about 500 workers to be employed. Whenever excessively soft soil was encountered, the shafts symmetrical to the caisson axes were left unexcavated to allow strict control. In very stiff clays, a large number of the internal wells were completely undercut, allowing the whole weight of the caisson to be carried by the outside skin friction and the bearing under the external wall. Skin friction on the outside of the monolith walls was estimated at 29 kN/m2 while loads on the cutting edge in clay overlying the founding stratum reached 100 tonnes/m.[20] The work on the foundation was completed in November 1938.
By the end of 1940, the erection of the cantilevered arms was commenced and was completed in mid-summer of 1941. The two halves of the suspended span, each 282 feet (86 m) long and weighing 2,000 tons, were built in December 1941. The bridge was erected by commencing at the two anchor spans and advancing towards the center, with the use of creeper cranes moving along the upper chord. 16 hydraulic jacks, each of which had an 800-ton capacity, were pressed into service to join the two halves of the suspended span.[13]
The entire project cost 25 million (£2,463,887). The project was a pioneer in bridge construction, particularly in India, but the government did not have a formal opening of the bridge due to fears of attacks by Japanese planes fighting the Allied Powers. Japan had attacked the United States at Pearl Harbor on 7 December 1941. The first vehicle to use the bridge was a solitary tram.[16]
The bridge is regarded "The Gateway to Kolkata, as it connects the city to Howrah Station".
When commissioned in 1943, Howrah was the 3rd-longest cantilever bridge in the world,[13] behind Pont de Québec (549m (1,801feet)) in Canada and Forth Bridge (521m (1,709feet)) in Scotland. It has since been surpassed by three bridges, making it the sixth-longest cantilever bridge in the world in 2013. It is a suspension type balanced cantilever[5] bridge, with a central span 1500feet between centers of main towers and a suspended span of 564feet. The main towers are 280feet high above the monoliths and 76feet apart at the top. The anchor arms are 325feet each, while the cantilever arms are 468feet each.[7] The bridge deck hangs from panel points in the lower chord of the main trusses with 39 pairs of hangers.[5] The roadways beyond the towers are supported from ground, leaving the anchor arms free from deck load. The deck system includes cross girders suspended between the pairs of hangers by a pinned connection.[7] Six rows of longitudinal stringer girders are arranged between cross girders. Floor beams are supported transversally on top of the stringers,[7] while themselves supporting a continuous pressed steel troughing system surfaced with concrete.[5]
The longitudinal expansion and lateral sway movement of the deck are taken care of by expansion and articulation joints. There are two main expansion joints, one at each interface between the suspended span and the cantilever arms and there are others at the towers and at the interface of the steel and concrete structures at both approach.[5] There are total 8 articulation joints, 3 at each of the cantilever arms and 1 each in the suspended portion. These joints divide the bridge into segments with vertical pin connection between them to facilitate rotational movements of the deck.[5] The bridge deck has longitudinal ruling gradient of 1 in 40 from either end, joined by a vertical curve of radius 4000feet. The cross gradient of deck is 1 in 48 between kerbs.[5]
Traffic Flow for fast moving heavy vehicles | |||||
---|---|---|---|---|---|
Year | Trams | Buses/Vans | Trucks | ||
1959 | 13% | 41% | 46% | ||
1986 | 4% | 80% | 16% | ||
1990 | 3% | 82% | 15% | ||
1992 | 2% | 80% | 18% | ||
1999 | align=center | - | 89% | 11% |
Traffic Flow for fast moving light vehicles | |||
---|---|---|---|
Year | Two-wheelers/Autos | Cars/Taxis | |
1959 | 2.47% | 97.53% | |
1986 | 24% | 76% | |
1990 | 27% | 73% | |
1992 | 26% | 74% | |
1999 | 20% | 80% |
The Kolkata Port Trust (KoPT) is vested with the maintenance of the bridge. The bridge has been subject to damage from vehicles due to rash driving, and corrosion due to atmospheric conditions and biological wastes. In October 2008, 6 high-tech surveillance cameras were placed to monitor the entire 705m (2,313feet) long and 30m (100feet) wide structure from the control room. Two of the cameras were placed under the floor of the bridge to track the movement of barges, steamers and boats on the river, while the other four were fixed to the first layer of beams — one at each end and two in the middle — to monitor vehicle movements. This was in response to substantial damage caused to the bridge from collisions with vehicles, so that compensation could be claimed from the miscreants.[24]
Corrosion has been caused by bird droppings and human spitting. An investigation in 2003 revealed that as a result of prolonged chemical reaction caused by continuous collection of bird excreta, several joints and parts of the bridge were damaged.[11] As an immediate measure, the Kolkata Port Trust engaged contractors to regularly clean the bird droppings, at an annual expense of . In 2004, KoPT spent to paint the entirety of 2.2e6m2 of the bridge. Two coats of aluminium paint, with a primer of zinc chromate before that, was applied on the bridge, requiring a total of 26,500 litres of paint.[25]
The bridge is also considerably damaged by pedestrians spitting out acidic, lime-mixed stimulants (gutka and paan).[26] A technical inspection by Port Trust officials in 2011 revealed that spitting had reduced the thickness of the steel hoods protecting the pillars from six to less than three millimeters since 2007.[27] [28] The hangers need those hoods at the base to prevent water seeping into the junction of the cross-girders and hangers, and damage to the hoods can jeopardize the safety of the bridge. KoPT announced that it will spend on covering the base of the steel pillars with fibreglass casing to prevent spit from corroding them.[29]
On 24 June 2005, a private cargo vessel M V Mani, belonging to the Ganges Water Transport Pvt. Ltd, while trying to pass under the bridge during high tide, had its funnel stuck underneath for three hours, causing substantial damage worth about 15 million to the stringer and longitudinal girder of the bridge.[30] Some of the 40 cross-girders were also broken. Two of four trolley guides, bolted and welded with the girders, were extensively damaged. Nearly 350m (1,150feet) of 700m (2,300feet) of the track were twisted beyond repair.[31] The damage was so severe that KoPT requested help from Rendall-Palmer & Tritton Limited, the original consultant on the bridge from UK. KoPT also contacted SAIL for 'matching steel' used during its construction in 1943.[32] For the repair, which cost around, about 8 tonnes of steel was used. The repairs were completed in early 2006.[33]
The bridge has been shown in numerous films, such as Bimal Roy's 1953 film, Ritwik Ghatak's Bari Theke Paliye in 1958, Satyajit Ray's Parash Pathar in the same year, Mrinal Sen's Neel Akasher Neechey in 1959, Shakti Samanta's Howrah Bridge (1958), that featured the famous song Mera Naam Chin Chin Chu and China Town (1962) and Amar Prem (1971), Amar Jeet's 1965 Teen Devian in 1965, Mrinal Sen's 1972 National Award winning Bengali film Calcutta 71 and Sen's Calcutta Trilogy its sequel in 1973, Padatik, Richard Attenborough's 1982 Academy Award winning film Gandhi, Goutam Ghose's 1984 Hindi film Paar, Raj Kapoor's Ram Teri Ganga Maili in 1985, Nicolas Klotz's The Bengali Night in 1988, Roland Joffé's English language film City of Joy in 1992, Florian Gallenberger's Bengali film Shadows of Time in 2004, Mani Ratnam's Bollywood film Yuva in 2004, Pradeep Sarkar's 2005 Bollywood film Parineeta, Subhrajit Mitra's 2008 Bengali film , Mira Nair's 2006 film The Namesake, Blessy's 2008 Malayalam Film Calcutta News, Surya Sivakumar's 2009 Tamil film Aadhavan, Imtiaz Ali's 2009 Hindi film Love Aaj Kal, Abhik Mukhopadhyay's 2010 Bengali film Ekti Tarar Khonje, Sujoy Ghosh's 2012 Bollywood film Kahaani, Anurag Basu's 2012 Hindi film Barfi!, Riingo Banerjee's 2012 Bengali film Na Hannyate, Rana Basu's 2013 Bengali film Namte Namte, and Ali Abbas Zafar's 2014 Hindi film Gunday and the 2015 YRF release from director Dibakar Banerjee's Detective Byomkesh Bakshy!. Shoojit sircar's "Piku" also features some scenes on this iconic bridge. The bridge was also featured in Garth Davis' Academy Award-nominated 2016 film Lion. Anvita Dutt's 2022 movie Qala (film) features some fictional scenes of Howrah Bridge's construction.