Qinghua Donglu Xikou | |
Native Name: | 清华东路西口 |
Native Name Lang: | zh-Hans |
Symbol Location: | beijing |
Symbol: | subway |
Address: | Qinghua East Road between Shuangqing Road and Wangzhuang Road |
Borough: | Haidian District, Beijing |
Country: | China |
Map Type: | Beijing |
Coordinates: | 40.0007°N 116.3395°W |
Operator: | Beijing Mass Transit Railway Operation Corporation Limited |
Platforms: | 2 (2 side platforms) |
Tracks: | 2 |
Structure: | Underground |
Accessible: | Yes |
Qinghua Donglu Xikou station[1] is a station on Line 15 of the Beijing Subway. It was opened on December 28, 2014 as a part of the stretch from and serves as the western terminus of the line. The preceding station is .[2]
An infill station on Line 13, between the existing and stations, is under construction. Construction of Qinghua Donglu Xikou station on Line 13 started in May 2024.[3] After the construction is completed, the station will be a transfer station on Line 13 and Line 15.[4]
The station on Line 15 has 2 underground side platforms.
The station on Line 13 will be an elevated station.
There are 2 exits in operation, lettered B and C. Exit C is accessible.