Proposed Melbourne rail extensions explained

Proposals for expansion of the Melbourne rail network are commonly presented by political parties, government agencies, industry organisations and public transport advocacy groups. The extensions proposed take a variety of forms: electrification of existing routes to incorporate them into the suburban rail system; reconstruction of former passenger rail lines along pre-existing easements; entirely new routes intended to serve new areas with heavy rail or provide alternative routes in congested areas; or track amplification along existing routes to provide segregation of services. Other proposals are for the construction of new or relocated stations on existing lines, to provide improved access to public transport services.

Proposals which have been adopted as policy by the state government, and which are in the detailed planning or construction phases, are also listed in this article.

History

1929 Metropolitan Town Planning Commission Plan

See main article: Metropolitan Town Planning Commission.

The Metropolitan Town Planning Commission, established in 1922 by the Victorian state government, produced a report in 1929 that recommended a new underground railway in central Melbourne running via Exhibition and Victoria streets to reduce congestion at Flinders Street station. The plan also proposed:

1940 Ashworth Improvement Plan

See main article: Ashworth Improvement Plan. A 1940 report by the Victorian Railways Chief Engineer for Ways and Works recommended a number of rail improvement works, including an underground city railway, a line to Doncaster via the Kew spur, and the connection of the Alamein line to the Glen Waverley line at Malvern East.[1]

1954 Melbourne Metropolitan Planning Scheme Report

A 1954 strategy released by the Melbourne & Metropolitan Board of Works recommended changes to Melbourne's land-use planning, an extensive network of freeways and a park system.[2] It also recommended some expansions to the rail network, including an underground CBD rail line with three stations beneath Lonsdale Street. It also called for:

The report recommended against a line to Doncaster due to the high cost of tunnelling.

1969 Melbourne Transportation Plan

See main article: 1969 Melbourne Transportation Plan. A major plan released by the Victorian state government of Henry Bolte called for the creation of 510 kilometres of freeways, and a number of new rail lines.[3] The plan proposed:

None of these proposed lines were ever built, except for the underground rail loop which began construction in 1971 and progressively opened between 1981 and 1985. The lines to Werribee, Sunbury and Craigieburn were also eventually electrified.

1999 Linking Victoria

See main article: Linking Victoria. A strategy launched in 1999 by the state government of Steve Bracks called for an airport rail link to Melbourne Airport and the reopening of several regional railway lines.

2008 Victorian Transport Plan

See main article: Victorian Transport Plan. The government of John Brumby responded to a major increase in rail patronage by releasing a plan in 2008 that called for a number of rail extensions, including the Regional Rail Link from west of Werribee to Southern Cross station, a new inner-city rail tunnel called the Melbourne Metro Rail Project, and electrification of the rail network to South Morang (completed in 2011), Sunbury (completed in 2012), Melton and Cranbourne East.[4]

2013 Network Development Plan: Metropolitan Rail (NDPMR)

See main article: Network Development Plan Metropolitan Rail. New government agency Public Transport Victoria (PTV) released a detailed 20-year rail development plan in 2013 under the government of Denis Napthine.[5] The report outlined a major expansion of the metropolitan rail network in Melbourne over a number of stages, with the goals of introducing a 'metro-style system' and extending the reach of the network.[6] Significant projects identified for construction included the Metro Tunnel, the Airport rail link, a line to Doncaster, a line to Rowville, a second underground inner-city rail tunnel, and many rail electrification and duplication projects.[7]

Extensions under construction

Metro Tunnel

See main article: Metro Tunnel. There have been numerous proposals for a north–south tunnel in inner-city Melbourne, to relieve capacity on Melbourne's City Loop and to provide new underground stations. In 2015 the State Government established the Melbourne Metro Rail Authority to oversee planning for new twin 9-kilometre rail tunnels through the central city between South Kensington station and South Yarra. The new Metro Tunnel will have five new underground stations and connect the Pakenham and Cranbourne lines with the Sunbury line, creating a new route through the CBD as an alternative to the City Loop.[8] New underground stations will be created at Arden, Parkville, Domain and two new CBD stations, State Library and Town Hall. Enabling works were underway by 2016 and major construction work on the tunnel and stations began in 2017.[9] The project has an estimated cost of $11 billion and is scheduled to be complete by 2025.[10]

Airport rail link

See main article: Melbourne Airport rail link. A rail link to Melbourne Airport has been proposed repeatedly since the airport's construction, with a variety of routes and service models suggested, but construction has never commenced. In July 2018, the Federal and State Governments each pledged A$5 billion (for a total of A$10 billion) to construct a rail link. The Federal Government proposed four preferred routes for the link, with one proposal running via a direct tunnel to Highpoint Shopping Centre and the others linking to existing stations in Broadmeadows, Flemington or Sunshine.[11] An assessment of the four preferred routes conducted by Rail Projects Victoria culminated in the route via Sunshine station being selected, with a detailed business case expected by 2020. Construction began in 2022, but paused in May 2023 due to a Federal government review of major infrastructure projects.

On the 8th of July 2024, Melbourne Airport ended longstanding negotiations with the Victorian Government over the stations location following the appointment of a mediator. Melbourne Airport have agreed to have the station above ground, with a hope to resume discussions to finalise the station's design, the construction timeline and redress for the land required for the above-ground option, with a new targeted opening of 2033.[12]

Suburban Rail Loop

See main article: Suburban Rail Loop. In August 2018, in the run-up to the 2018 Victorian state election, the State Government pledged $300 million to complete a business case and secure funding to construct a new railway through suburban Melbourne.[13] The project is designed to link major activity centres and amenities such as hospitals, shopping centres, universities, and Melbourne Airport. The proposal would connect most existing railway lines through middle suburbs and enable easier intra-suburban travel.[14]

The Suburban Rail Loop (SRL) would connect the existing station at Cheltenham with other existing stations at Clayton, Glen Waverley, Box Hill, Heidelberg, Reservoir, Fawkner, Broadmeadows, Sunshine and Werribee. It will also link to new stations to be built in areas that have long been promised rail connections, including Monash University, Burwood, Doncaster, Bundoora and Melbourne Airport. Construction on the first stage, SRL East, began in 2022 and is set to open by 2035.[15] [16]

Currently planned extensions

Electrification to Melton and Wyndham Vale

See main article: Western Rail Plan. Electrification of the Deer Park – West Werribee line to Wyndham Vale was included in the 2013 Network Development Plan – Metropolitan Rail (NDPMR) by the government agency Public Transport Victoria, along with quadruplication to provide express tracks for Geelong services. The plan also called for the electrification of the Ballarat line as far as Melton. Several additional stations have been proposed for an electrified Wyndham Vale line, at locations including Truganina, Sayers Road, Davis Road and Black Forest Road.[17]

During the 2018 Victorian state election, the State Government announced its Western Rail Plan, which would quadruplicate and electrify the rail lines to Melton and Wyndham Vale, allowing Metro services.[18] Under this plan, Metro and V/Line regional services would be separated, allowing for higher speed trains to be introduced to Geelong and Ballarat. The plan would electrify the track to Wyndham Vale opened in 2015 as part of the Regional Rail Link. New tracks between Sunshine and Southern Cross Station to be built as part of the Airport rail link could add extra capacity for metro and regional trains. Planning for faster regional rail and electrification of the lines to Melton and Wyndham Vale will occur alongside planning for the Airport rail link, with construction set to start by 2022.[19]

Extension to Clyde

Various proposals have been made to extend the Cranbourne line to the growth suburb of Clyde by rebuilding part of the closed South Gippsland line. Construction on a project to duplicate the Cranbourne line between Dandenong and Cranbourne began in 2020, with an extension to Clyde to follow on its completion.[20] In September 2019 the State Government announced the timeline for duplication as part of a $1bn package named the "Cranbourne Line Upgrade".[21] The package includes the removal of the four remaining level crossing on the line, the duplication of 8 km of track, and the rebuilding of Merinda Park Station. The project began in 2020, with duplication completed in 2022 and the level crossing removals planned to be completed by 2024, allowing a ten minutes service frequency to Cranbourne and facilitating an eventual extension to Clyde.[22]

Other proposals

Melbourne Metro 2

See main article: Melbourne Metro 2. There have been various proposals for a successor to the Metro Tunnel, with the main proposal linking the Mernda and Werribee lines via a new tunnel between Clifton Hill and Newport. This proposal was first identified by PTV in the 2013 NDPMR. The new Parkville station to be built as part of the Metro Tunnel has been designed with provision for future expansion to an interchange with the second Metro Tunnel.[23] Melbourne City Council has advocated for the tunnel, which could include stations at Fitzroy, Parkville, Flagstaff, Southern Cross and multiple stations at the urban renewal precinct Fishermans Bend.[24] The tunnel was included in 2018 as part of the State Government's 30-year strategy for Fisherman's Bend, with two stations in the precinct, and has been backed by the independent planning agency Infrastructure Victoria in its 30-year infrastructure plan for the state released in 2021.[25] [26] [27] [28] [29]

Melbourne Metro 3

In 2018, a paper released by Melbourne City Council as part of its Transport Strategy refresh called for a third cross-city rail tunnel to be built by 2035.[30] The council called for a stand-alone metro line running from Melbourne Airport to Maribyrnong, Arden Macaulay, Southern Cross, Parliament then east of the CBD to Richmond, Kew, Doncaster and Ringwood.[31] [32]

Western suburbs

Werribee line

Avalon Airport

Northern suburbs

Albion–Jacana line

Craigieburn line

Upfield line

North-eastern suburbs

Doncaster line

See main article: Doncaster railway line.

Hurstbridge line

Eastern suburbs

Lilydale line

Rowville

See main article: Rowville railway line.

Knox

Alamein line

South-eastern suburbs

South-East Fast Line

Frankston and Stony Point line

Electrification to Baxter

In 2019, the State Government completed a business case for electrification and extension of the Frankston line to Baxter station in Melbourne's south, due for completion in 2019.[55] In November 2019 the business case was delivered to the Federal Government.[56] The plan included electrification of the line with two stations, Baxter and Leawarra station near Monash University Peninsula Campus.[57] The business case included other enhancements, such as track duplication, level crossing removals, station upgrades, car parking and train stabling. The Federal Government committed $225 million towards the project in its 2017-2018 budget.[58] However due to the federal government review regarding spending on major infrastructure projects, in November 2023 it was announced that project funding was subsequently axed.[59]

Pakenham and Cranbourne line

Southern suburbs

St Kilda line

Although the St Kilda Line has been converted to light rail operation and is now part of Melbourne's tram network, several proposals for rail extensions existed throughout its working life.

See also

External links

Notes and References

  1. Book: Robert, Lee. The Railways of Victoria 1854-2004. Melbourne University Publishing. 2007. 978-0-522-85134-2. 185.
  2. Web site: Melbourne Metropolitan Planning Scheme 1954: Report. Melbourne & Metropolitan Board of Works. 2019-05-17. Planning. 106–114. en. 2019-08-11.
  3. Web site: Melbourne transportation study / prepared for the Metropolitan Transportation Committee by Wilbur Smith and associates and Len T. Frazer and associates. - Version details. Trove. en. 2019-07-02.
  4. Web site: Victorian Transport Plan. https://web.archive.org/web/20120325004350/https://transport.vic.gov.au/__data/assets/pdf_file/0013/31342/vtp.pdf. dead. 2012-03-25. State Government of Victoria. 2008. 2019-07-03.
  5. Web site: Major rail projects expected in 20 years. Gough. Deborah. 2013-03-26. The Age. en. 2019-07-03.
  6. Web site: What's the long-term rail plan for Melbourne?. 2013-03-28. The Urbanist. 2019-07-03.
  7. Web site: Network Development Plan - Metropolitan Rail. Public Transport Victoria. 2012. PTV.
  8. Web site: Frequently asked questions. metrotunnel.vic.gov.au. en. 2019-07-02.
  9. Web site: CBD roads to be closed for years as Melbourne Metro Tunnel construction begins. Lucas. Aisha Dow, Clay. 2017-01-16. The Age. en. 2019-07-02.
  10. Web site: Melbourne Metro a year ahead of schedule, Premier says. Jacks. Timna. 2018-02-20. The Age. en. 2019-07-02.
  11. Web site: Turnbull announces $5b funding for Melbourne Airport-CBD rail link. Dziedzic. political reporter Stephen. Willingham. state political reporter Richard. 2018-04-11. ABC News. en-AU. 2019-07-02.
  12. News: 2024-07-07 . 'Victorians have waited long enough': Melbourne Airport backs down in rail link standoff . 2024-07-10 . ABC News . en-AU.
  13. News: Massive Melbourne suburban train loop pledged by Victorian government. Henriques-Gomes. Luke. 2018-08-28. The Guardian. 2019-07-02. en-GB. 0261-3077.
  14. Web site: Melbourne's $50b rail loop the 'biggest public transport project in history'. Willingham. state political reporter Richard. Oaten. James. 2018-08-28. ABC News. en-AU. 2019-07-02. staff.
  15. Web site: Melbourne suburban rail loop: What readers think. Koob. Simone Fox. 2018-08-28. The Age. en. 2019-07-02.
  16. Web site: 'A mega project on steroids': Experts divided on Melbourne rail loop plan. Willingham. state political reporters Richard. Stephanie. 2018-08-29. ABC News. en-AU. 2019-07-02. erson.
  17. News: Wish list for rail future. Macaulay. Charlene. 25 September 2018. Star Weekly. 21 January 2019.
  18. Web site: Western Rail Plan. Build. Victoria's Big. 2018-11-01. bigbuild.vic.gov.au. en. 2019-07-02.
  19. Web site: Geelong to Melbourne in 45 minutes under Labor's regional rail plan. Jacks. Timna. 2018-10-15. The Age. en. 2019-07-02.
  20. News: Cranbourne line train services set to double under Labor election promise. 26 August 2018. ABC News. 22 January 2019. en-AU.
  21. Web site: Upgrading The Cranbourne Line To Run More Services. 2019-09-02. Premier of Victoria. en-US. 2019-10-28.
  22. Web site: Hui. Jin. 2020-07-13. Works ramp up on rail duplication. 2021-08-27. Cranbourne Star News. en-US.
  23. Web site: What will happen to Melbourne Metro 2, the other planned underground rail line?. Jacks. Timna. 2018-09-02. The Age. en. 2019-07-02.
  24. Web site: Melbourne needs two new rail tunnels by 2035, council says. Jacks. Timna. 2018-04-19. The Age. en. 2019-05-07.
  25. Web site: Fishermans Bend Framework. Bend. Fishermans. 2018-10-30. Fishermans Bend. en. 2019-05-07.
  26. Web site: How to tackle Melbourne's tide of traffic. The Sydney Morning Herald. en. 2019-07-02.
  27. News: 2021-08-19. Final price tag for Melbourne's suburban rail loop remains a mystery as delayed business case revealed. en-AU. ABC News. 2021-10-22.
  28. Web site: Jacks. Timna. 2020-12-08. Government told to dig deep to pave way for 30 more years of growth. 2021-10-22. The Age. en.
  29. Web site: Infrastructure Victoria: Preparing for Melbourne Metro 2.
  30. Web site: Melbourne needs two new rail tunnels by 2035, council says. Jacks. Timna. 2018-04-19. The Age. en. 2019-05-07.
  31. Web site: Melbourne needs two new rail tunnels by 2035, council says. Jacks. Timna. 2018-04-19. The Age. en. 2019-05-07.
  32. Web site: Public Transport Network :: Transport Strategy refresh. Participate Melbourne. en. 2019-05-07.
  33. Web site: Baillieu pledges rail link to Avalon. Willingham. Richard. 2010-11-17. The Age. en. 2019-07-03.
  34. Web site: Preferred route revealed for Avalon Airport rail link, but no start date in sight. Willingham. Richard. 2014-09-19. The Age. en. 2019-07-03.
  35. Web site: High-speed rail line would link Avalon Airport to Melbourne CBD. Railpage. 2019-07-03.
  36. News: Taylor . James . Avalon CEO hopes rail solution takes off . 2019-12-04 . Surf Coast Times . 2018-04-18.
  37. Web site: Exclusive: 'Luton-style' Avalon Airport rail could run within 2 years . 2024-05-09 . Australian Aviation . en-AU.
  38. Web site: The People Plan Discussion Paper. https://web.archive.org/web/20090521043056/http://www.thepeopleplan.org.au/Support%20Docs/The%20People%20Plan%20Discussion%20Paper.pdf. 21 May 2009. dead. 11 December 2008.
  39. Coburg Historical Society Newsletter, No 49, June 1997
  40. Greening Melbourne with Public Transport, Public Transport Users Association, 1991
  41. News: Jacks . Timna . 6 November 2018 . Sluggish Upfield's service boost still seven years away . The Age. 22 January 2019.
  42. News: Lucas . Clay . Jacks . Timna . Toll road to kill off future Doncaster rail: public transport group . The Age . 26 April 2018 . 22 January 2019.
  43. News: Shanahan . Brittney . New station mooted for Eltham North . 22 January 2019 . Diamond Valley Leader . 11 July 2017 . en.
  44. Web site: The Melbourne region's opportunity and need for rapid transit . Railway Technical Society of Australasia . C L Fouvy . 18 July 2008 . dead . https://web.archive.org/web/20080721025337/http://rtsa.com.au/assets/2008/03/rapid-transit-by-l-fouvy.pdf . 21 July 2008 .
  45. Book: Coldstream Structure Plan Draft . October 2015 . Yarra Ranges Council . 39 . 22 January 2019.
  46. Web site: admin . Yarra Valley Trail . 2024-01-23 . Ride Yarra Ranges . en-AU.
  47. News: Egging . Kiel . Lilydale project to give township a new look . 22 January 2019 . Lilydale & Yarra Valley Leader . 24 August 2017 . en.
  48. News: Carey . Adam . Preiss . Benjamin . Trains or trams? Debate begins over transport mode from Caulfield to Rowville . 22 January 2019 . The Age . 7 May 2018 . en.
  49. Web site: Fears Caulfield to Rowville tram link on ice. Jacks. Timna. 2019-05-29. The Age. en. 2020-02-23.
  50. Web site: Melbourne Rail Plan 2019-2050. Rail Futures Institute. September 2018.
  51. News: Chaddy about to get a whole lot bigger . 22 December 2005 . The Age . 30 July 2007 . Melbourne . Royce . Millar.
  52. Web site: City of Kingston Historical Website - 'Beaumaris Railway Spur' . 15 September 2008.
  53. Grady, New Jersey (1985). "Electrification - Overhead Line Equipment for the Year 2050". Conference on Railway Engineering 1985
  54. News: Lund . Andrew . Frankston line extension plans a step closer . 22 January 2019 . 9 News . 23 April 2018.
  55. Web site: Department of Economic Development . Jobs . Baxter electrification business case . 2019-07-02 . transport.vic.gov.au . en-au.
  56. Web site: 2019-11-04 . Rail extension business case complete Bayside News . 2020-02-03 . Bayside News . en-AU.
  57. Web site: Department of Economic Development . Jobs . Baxter electrification business case . 2020-02-03 . transport.vic.gov.au . en-au.
  58. Web site: Towell . Noel . 2018-07-16 . Guy, Turnbull all aboard the $450 million Baxter rail link . 2019-07-02 . The Age . en.
  59. News: 2023-11-16 . List: the 50 projects to lose funding under Australian government's infrastructure spending review . 2023-11-22 . The Guardian . en-GB . 0261-3077.
  60. News: Townsend . Melissa . General Motors "ghost station" to stay . 22 January 2019 . Dandenong Leader . 19 April 2015 . en.
  61. D.F. Jowett & I.G. Weickhardt (1978). Return To Rosstown – Railways, Land Sales and Sugar Beet Ventures in Caulfield. Rosstown Historical Research Group, Chapter 9.
  62. 1954 Planning Scheme, Melbourne Board of Works
  63. D.F. Jowett & I.G. Weickhardt (1978). Return To Rosstown – Railways, Land Sales and Sugar Beet Ventures in Caulfield. Rosstown Historical Research Group, Chapter 13.