Project MPSV06 salvage ship explained

Project MPSV06 refers to a series of Russian icebreaking multipurpose salvage ships.

One vessel based on the original Project MPSV06 design, Kerchenskiy Proliv, has been under construction at Amur Shipbuilding Plant in Russia since 2010 and is expected to enter service in 2024. Two vessels based on a slightly modified Project MPSV06-NY design, Beringov Proliv and Murman, were built at Nordic Yards Wismar in Germany in 2015. Two further vessels based on a modernized Project MPSV06M design, Pevek and Anadyr, are under construction at Yantar Shipyard in Kaliningrad with delivery scheduled for 2024.

Development and construction

MPSV06 and MPSV06-NY

The federal programs Modernization of the transport system of Russia (2002–2010) and Development of the transport system of Russia (2010–2015) included the recapitalization of the Russian maritime emergency rescue fleet, much of which dated back to the Soviet times and was approaching the end of its service life, with 17 new vessels of various types.[1] 6.67 billion rubles of federal funding were allocated for the construction of four 7-megawatt icebreaking multipurpose rescue vessels.[2] The technical project referred to as MPSV06 was developed by Marine Engineering Bureau.[3]

The construction of the first Project MPSV06 vessel was awarded to the Russian shipyard Amur Shipbuilding Plant in December 2009[4] and the keel of the vessel, tentatively named Spasatel Petr Gruzinskiy,[5] was laid on 21 July 2010.[6] However, construction of the 3.6 billion ruble icebreaker was later suspended due to serious deficiencies in the design documentation. The construction was later resumed and in March 2019 the technical readiness of the vessel was about 40%.[7] By February 2020, Amur Shipbuilding Plant was reportedly "ahead of schedule" and the vessel, renamed Kerchenskiy Proliv, was launched on 30 October 2020.[8], the vessel is undergoing final outfitting and will be towed to Vladivostok in 2024 for sea trials and delivery to the customer.[9]

On 19 December 2012, the German shipbuilder Nordic Yards based in Wismar was awarded a 150 million euro contract for the construction of the two further Project MPSV06 icebreaking multipurpose salvage ships.[10] [11] Due to modifications to the original design, the German-built vessels are referred to as separate subclass, MPSV06-NY.[12] The vessels were launched together on 21 September 2014.[13] The lead ship, Beringov Proliv, was delivered by the shipyard on 10 October 2015[14] and the second vessel of the series, Murman, in late November.[15] The official commissioning ceremonies were held on both vessels in December.[16] [17]

The fourth icebreaking multipurpose salvage vessel included in the federal budget was built to a different design by the Russian-owned Arctech Helsinki Shipyard in Finland in 2014.[18] The vessel, Baltika, is a so-called oblique icebreaker which can break a channel wider than the vessel's beam with its asymmetric hull.[19]

MPSV06M

One of the thirteen federal-scale national projects adopted by Russia for 2019–2024, Comprehensive plan for modernization and expansion of main infrastructure, included the expansion of the ice-strengthened rescue fleet to support the development of the Northern Sea Route. Among the 16 planned ships were three 7-megawatt icebreaking multipurpose rescue vessels.[20]

In June 2021, the Kaliningrad-based Yantar Shipyard was awarded the construction of the first vessel based on a modernized design referred to as Project MPSV06M.[21] The construction of the second vessel with a contract price of 7.463 billion rubles was awarded to the same shipyard in November 2022.[22], the vessels Pevek and Anadyr have been laid down with delivery initially scheduled for 2024.[23] [24] In May 2023, the delivery of Pevek was postponed to 2026.[25]

, the construction of the third planned vessel has not been awarded.

Design

All three Project MPSV06 variants are similar in size with length overall of about 85m-87mm (279feet-285feetm), beam of about 18m-19mm (59feet-62feetm), draft of about 6m-6.5mm (20feet-21.3feetm), and displacement of about 5000t6000t. The general layout of the vessel includes a helideck for Kamov Ka-32 forward, deckhouse amidships, and an open working deck with two 32-tonne cranes, 80-tonne A-frame, and other equipment aft. The vessels have a crew of 26 as well as accommodation for 12 supernumeraries and capacity for 95 survivors.[26]

The ships' fully-integrated diesel-electric power plant consists of four main diesel generators supplying power for both propulsion as well as service loads while underway. In the first three vessels, the main power plant consists of four 3000kW six-cylinder Wärtsilä 6L32 medium-speed diesel engines. However, the international sanctions against Russia and the Finnish engine manufacturer's exit from the Russian market in 2022 means the same engines cannot be used in the modernized variants.[27]

For main propulsion, all MPSV06 variants are fitted with two 3500kW electrically-driven azimuth thrusters. Kerchenskiy Proliv was originally provided with Rolls-Royce (today Kongsberg Maritime) Z-drive thrusters which may have become unserviceable while the vessel's construction was suspended.[28] Beringov Proliv and Murman were fitted with ABB Azipod ICE 1400 units.[29] The propulsion equipment selected for Pevek and Anadyr has not been identified. For maneuvering in ports and for dynamic positioning, the vessels have transverse bow thrusters.

All Project MPSV06 variants are strengthened to Russian Maritime Register of Shipping ice class Icebreaker6 which is intended for icebreaking operations in non-Arctic freezing seas where the ice is up to 1.5m (04.9feet) thick. The vessel's continuous icebreaking capability is 1.5- in 1m (03feet) level ice with 20cm-25cmcm (10inches-10inchescm) snow cover. In open water, the ships have a design speed of and economical speed of .

Ships in class

NameProjectBuilderYard number<-- this information can be moved to ship specific articles later -->IMO numberKeel laid<-- this information can be moved to ship specific articles later -->Launched<-- this information can be moved to ship specific articles later -->Delivered<-- this information can be moved to ship specific articles later -->Port of registryStatusImageRef
MPSV06Amur Shipbuilding Plant (Komsomolsk-on-Amur, Russia)360993608221 July 201030 October 20202024 (current estimate)[30] Launched
Beringov ProlivMPSV06-NYNordic Yards Wismar (Wismar, Germany)21712 November 201321 September 201410 October 2015KorsakovIn service[31]
MurmanMPSV06-NYNordic Yards Wismar (Wismar, Germany)21812 November 201321 September 201421 November 2015MurmanskIn service[32]
PevekMPSV06MYantar Shipyard (Kaliningrad, Russia)24 March 20222024 (initial)2026 (current estimate)Under construction
AnadyrMPSV06MYantar Shipyard (Kaliningrad, Russia)24 May 20232024 (planned)Under construction

Notes and References

  1. Web site: Федеральная целевая программа "Модернизация транспортной системы России (2002-2010 годы)". ru. Ministry of Transport of the Russian Federation. 13 September 2006. 24 December 2023.
  2. Web site: Федеральная целевая программа «Развитие транспортной системы России (2010-2015 гг.)». ru. Ministry of Transport of the Russian Federation. 1 January 2010. 24 December 2023.
  3. Web site: Project MPSV06. Marine Engineering Bureau - Spb. 24 December 2023.
  4. Web site: Флот получит хорошо забытое старое. ru. Kommersant. 26 December 2018. 24 December 2023.
  5. Web site: Керченский пролив. ru. FleetPhoto. 24 December 2023.
  6. Web site: Амурский судостроительный завод приступил к строительству аварийно-спасательного судна. ru. PortNews. 21 July 2010. 24 December 2023.
  7. Web site: Техническая готовность судна "Спасатель Петр Грузинский" составляет 40%. ru. Sudostroenie.info. 11 March 2019. 24 December 2023.
  8. Web site: На АСЗ прошла церемония спуска на воду сразу двух заказов. ru. Sudostroenie.info. 30 October 2020. 24 December 2023.
  9. Web site: АСЗ весной 2024 года переведет буксир проекта MPSV06 «Керченский пролив» во Владивосток для подготовки к испытаниям. ru. PortNews. 1 December 2023. 24 December 2023.
  10. http://barentsobserver.com/en/arctic/2013/01/new-ice-class-sar-vessels-russian-arctic-04-01 New ice-class SAR vessels for Russian Arctic
  11. Web site: Nordic Yards secures contracts for two ice-class SAR vessels from Rosmorrechflot. PortNews. 20 December 2012. 24 December 2023.
  12. Web site: МНОГОФУНКЦИОНАЛЬНОЕ АВАРИЙНО-СПАСАТЕЛЬНОЕ СУДНО ПРОЕКТА MPSV06-NY. Nordic Engineering. ru. 24 December 2023.
  13. Web site: Nordic Yards launches two MPSVs for Rosmorrechflot’s rescue service (photo). PortNews. 22 September 2014. 24 December 2023.
  14. Web site: Acceptance/delivery certificate signed for Beringov Proliv, lead ship of Project MPSV06 (photo). PortNews. 10 October 2015. 24 December 2023.
  15. Web site: Acceptance/delivery certificate signed for multipurpose salvage vessel Murman, Project MPSV06 (photo). PortNews. 23 November 2015. 24 December 2023.
  16. Web site: Nordic Yards delivers 7MW rescuer Murman to the customer. PortNews. 11 December 2015. 24 December 2023.
  17. Web site: Russian flag officially raised at Beringov Proliv rescuer built by Nordic Yards (photo). PortNews. 18 December 2015. 24 December 2023.
  18. Ilyukhin. V. N.. Актуальные аспекты развития судов аварийно спасательного флота в Арктике. Current view on the development of emergency rescue fleet vessels in the Arctic. Arctic: ecology and economy. 2. 34. 97–108. 2019. 10.25283/2223-4594-2019-2-97-108. 24 December 2023. free.
  19. Web site: Venäjä saa ainutlaatuisen murtajan – suomalaiskeksintö kulkee jäissä kylki edellä. fi. Helsingin Sanomat. Sanoma Media Finland. 9 April 2014. 24 December 2023.
  20. Web site: Аварийно-спасательному флоту России - комплексное развитие. Korabel.ru. 22 November 2021. 25 December 2023.
  21. Web site: Yantar shipyard to build rescue ship of Project MPSV06M for Marine Rescue Service. PortNews. 11 June 2021. 25 December 2023.
  22. Web site: Yantar shipyard to build 7MW rescue ship of Project MPSV06M. 25 November 2022. 25 December 2023. PortNews.
  23. Web site: Yantar shipyard lays down rescue ship Pevek, Project MPSV06M, for Marine Rescue Service. 25 March 2022. 25 December 2023. PortNews.
  24. Web site: Yantar shipyard lays down 7MW multipurpose salvage vessel Anadyr of MPSV06М series. 24 May 2023. 25 December 2023. PortNews.
  25. Web site: Сроки сдачи МФАСС проекта MPSV06M «Певек» перенесены на 2026 год. ru. The deadline for the completion of the MFASS project MPSV06M "Pevek" has been postponed to 2026. 7 May 2024. 7 May 2024. PortNews.
  26. . Модельный ряд для северных морей. ОСК. United Shipbuilding Corporation. 4. 8 . 2011 . 14–23 . 27 December 2023.
  27. Web site: Wärtsilä completes Russian market exit. 21 July 2022. 26 December 2023. Wärtsilä Corporation.
  28. Web site: «Керченский пролив» встал из-за санкций. ru. Kommersant. 12 April 2021. 27 December 2023.
  29. http://www.marinelink.com/news/icebreaker-russian-azipod358932.aspx Russian Icebreaker Azipod Double Order for ABB
  30. Web site: Судно "Керченский пролив" отправится на достройку во Владивосток весной 2024 года. ru. Sudostroenie.info. 24 December 2023. 1 December 2023.
  31. Web site: BERINGOV PROLIV – multipurpose salvage vessel. Морспасслужба Росморречфлота. 6 March 2023. live. https://web.archive.org/web/20230302132604/http://morspas.com/en/flot/mnogofunkcionalnye-suda/beringov-proliv. 2 March 2023.
  32. Web site: MURMAN – multipurpose salvage vessel (project MPSV06). Морспасслужба Росморречфлота. 6 March 2023. live. https://web.archive.org/web/20230302132605/http://morspas.com/en/flot/mnogofunkcionalnye-suda/murman. 2 March 2023.