Progress M-08M Explained

Progress M-08M
Mission Type:ISS resupply
Operator:Roskosmos
Cospar Id:2010-055A
Satcat:37196
Mission Duration:91 days
Spacecraft Type:Progress-M s/n 408
Manufacturer:RKK Energia
Launch Mass:7289 kg
Launch Date:27 October 2010, 15:11:50 UTC
Launch Rocket:Soyuz-U
Launch Site:Baikonur, Site 1/5
Disposal Type:Deorbited
Decay Date:24 January 2011, 06:07 UTC
Orbit Epoch:27 October 2010
Orbit Reference:Geocentric
Orbit Regime:Low Earth
Orbit Inclination:51.64°
Apsis:gee
Docking:
Docking Type:dock
Docking Date:30 October 2010, 16:36 UTC
Undocking Date:24 January 2011, 00:42 UTC
Time Docked:88 days
Cargo Mass:2572 kg
Cargo Mass Press:1272 kg
Cargo Mass Fuel:870 kg
Cargo Mass Gas:449 kg (oxygen)
Cargo Mass Water:226 kg
Programme:Progress ISS Resupply
Previous Mission:Progress M-07M
Next Mission:Progress M-09M

Progress M-08M (Russian: Прогресс М-08М|italic=yes), identified by NASA as Progress 40P, is a Progress spacecraft which was used to resupply the International Space Station. It was the eighth Progress-M 11F615A60 spacecraft to be launched, the fifth for the year 2010. The spacecraft was manufactured by RKK Energia, and was operated by the Russian Federal Space Agency. It arrived at the space station on 30 October 2010 whilst the Expedition 25 crew was aboard, and departed during Expedition 26 on 24 January 2011.

Prelaunch operations

Prior to the expected launch, preparations had been going for months. A train with the Soyuz-U rocket that will be used for the Progress launch arrived at Baikonur Cosmodrome on 24 July 2010.[1] The rocket was transported to Site 112. The Progress M-08M spacecraft was delivered to the Baikonur on 3 September 2010 where it was hosted at site 254.[2] Prelaunch processing gathered pace afterwards with tests of the Progress' RF systems in the acoustic chamber completed in late September 2010[3] and leak checks in the vacuum chamber in early October 2010. On 3 October 2010, Progress spacecraft was transported to hall 104 of the integration facility from the vacuum chamber.[4] Further tests continued and potable water was loaded into Rodnik tanks of the Progress M-08M spacecraft.[5]

On 15 October 2010, Russian Space Agency began prelaunch processing of Baikonur's pad 1, preparing it for the Progress launch.[6] On 18 October 2010, Progress M-08M cargo vehicle was loaded with propellant components and compressed gases, and returned to the integration and test facility for further processing.[7] With Designers' inspection of Progress M-08M completed, the spacecraft was transported to the launch vehicle integration facility for further assembly with the Soyuz-U rocket.[8]

The combined Soyuz-U rocket and the Progress M-08M spacecraft stack was rolled out and installed in vertical at Baikonur's pad 1 during the morning of 25 October 2010.[9] Soon afterwards, Launch minus three day (L-3) prelaunch operations commenced at the pad.

Cargo

Progress M-08M hauled 2572 kg of cargo supplies including water, air, fuel and hardware for Molniya-Gamma and Coulomb Crystal [10] experiments to the space station. The Molniya-Gamma experiment measures gamma splashes and optical radiation during terrestrial lightning and thunder conditions. The spacecraft also carried high-speed data transmission equipment to be installed on the outer surface of the space station during a spacewalk by cosmonauts Oleg Skripochka and Dmitri Kondratyev in January 2011. In addition to the standard rations, the food boxes contain fresh fruits and vegetables – lemons, apples, onions, tomatoes, and 1 kg of garlic.[11]

Inventory

Total cargo mass delivered: 2572 kg

Item description [12] Mass (kg)
Propellant in the propulsion system tanks 880
Propellant in the refueling system tanks 870
Oxygen 50
Water in the Rodnik system tanks 272
Items in the cargo compartment 1130
Gas supply system 1
Water supply system 22
On-board hardware control system 13
On-board measurement system 47
Electrical power supply system 77
Telemetry data system (BITS2-12) 1
Thermal control system 19
Lightening items 4
Power supply systems 77
Guidance, Navigation and Control system 48
Maintenance and repair equipment 21
Sanitary and hygienic items 102
Food containers, fresh products 278
Medical equipment, linen, personal hygienic and prophylactics items 91
Personal protective items 79
Anti-fire protection items 4
PCE-pointed power sensor 1
On-board documentation files, crew provisions, video- and photo-equipment 22
Zvezda Service Module hardware 2
MRM-2 hardware 5
Zarya FGB-hardware 65
US Orbital Segment hardware 324

Included 250 kg of propellent for the space station needs.

Mission timeline

Launch

On 26 October 2010, the space station performed a Debris Avoidance Maneuver (DAM) in order to get out of the way of a piece of debris from the defunct Upper Atmosphere Research Satellite (UARS). As such, at 10:25 UTC, the engines of the Progress M-07M spacecraft, were fired for three minutes in a posigrade direction. This resulted in an increase in velocity of the space station by 0.4 metres per second. As such, the launch of Progress M-08M launch was brought forward by three seconds from 15:11:53 UTC.[13]

The Soyuz-U carrier rocket with Progress M-08M was launched from the Baikonur Cosmodrome's Pad 1 (Gagarin's launch pad) at 15:11:50 on 27 October 2010.[14] Ascent was nominal, and all systems functioned without issues. The launch mass of the spacecraft was 7289 kg. Progress M-08M successfully achieved the preliminary orbit of (192.46 by 242.99 kilometres, inclination 51.4°, period 88.57 minutes) after a nine-minute ascent provided by the three-stage Soyuz-U rocket. In space, onboard commands were issued to unfurl the spacecraft's communications and navigation antennas and extend the two solar arrays.[15]

Docking

On 30 October 2010, after three days of autonomous flight following the launch, Progress M-08M docked with the Pirs Docking Compartment Module nadir port of the space station.[16] The successful linkup came at 16:36 UTC while flying at 350 km over western Kazakhstan. In preparation for the docking on 20 October 2010, the engines of the Progress M-07M spacecraft were fired for 228.7 seconds.[17] This reboost placed the space station at the proper altitude to receive Progress M-08M. A late DAM performed on 26 October 2010 slightly changed the station's orientation in space and the planned docking had to be brought forward by a couple of minutes.

The Progress M-08M spacecraft, flying on autopilot, performed a flawless rendezvous with the space station. After arriving in the vicinity of the space station, Progress M-08M began a flyaround maneuver to get lined up with the docking port and then executed a roll maneuver to properly orient its solar wings with surrounding structures around the Pirs module. A brief stationkeeping hold with about 200 metre between the spacecraft and space station allowed Russian flight controllers to assess systems before giving approval to commence the final approach.

During stationkeeping, flight controllers in Moscow instructed cosmonaut Aleksandr Kaleri to activate the TORU manual docking equipment and take over the piloting tasks from the Progress' autonomous KURS system.[18] The switch to manual mode was decided at range of 194 metre.[19] Kaleri worked inside the space station's Zvezda module to fly Progress M-08M remotely using television views and a pair of joysticks and guided it to the successful docking. The range rate at the time of contact, based on Mission Control Center-Moscow calculations was 0.067 m/s.

Hooks and latches were engaged a few minutes later to firmly secure Progress M-08M to the space station. The Expedition 25 crew opened hatches and entered the Progress later on the next day.[20]

Undocking and decay

Progress M-08M spacecraft undocked nominally from the International Space Station on 23 January 2011. The undocking command was issued by Russian Mission Control at 00:40 UTC.[21] The spacecraft was not used for further scientific experiments. The deorbit burn took place at 05:16 UTC on 24 January 2011.[22] It re-entered and fell into a remote area of the southern Pacific Ocean at 06:07 UTC.[23]

See also

External links

Notes and References

  1. Web site: Soyuz-U Delivered to Baikonur. 2010-07-26. Russian Federal Space Agency. 2010-10-23. dead . https://web.archive.org/web/20110927000601/http://www.roscosmos.ru/main.php?id=2&nid=9950&hl=progress+m-08m. 2011-09-27.
  2. Web site: Intensive Launch Campaigns under Human Spaceflight Program at Baikonur. 2010-09-23. Russian Federal Space Agency. 2010-10-23. dead . https://web.archive.org/web/20120301192221/http://www.roscosmos.ru/main.php?id=2&nid=10280&hl=progress+m-08m. 2012-03-01.
  3. Web site: Soyuz TMA-M Tanked. Progress M-08M Acoustic Tests Completed. 2010-09-29. Russian Federal Space Agency. 2010-10-23. dead. https://web.archive.org/web/20120301192228/http://www.roscosmos.ru/main.php?id=2&nid=10455&hl=progress+m-08m. 2012-03-01.
  4. Web site: Progress M-08M Vacuum Tests Completed. 2010-10-03. Russian Federal Space Agency. 2010-10-23. dead. https://web.archive.org/web/20120301192238/http://www.roscosmos.ru/main.php?id=2&nid=10487&hl=progress+m-08m. 2012-03-01.
  5. Web site: Progress M-08M Loaded with Water, Prepared for Tanking. 2010-10-14. Russian Federal Space Agency. 2010-10-23. dead. https://web.archive.org/web/20120301192245/http://www.roscosmos.ru/main.php?id=2&nid=10572&hl=progress+m-08m. 2012-03-01.
  6. Web site: Baikonur's Pad 1 Prepared for Progress M-08M Launch. 2010-10-15. Russian Federal Space Agency. 2010-10-23. dead. https://web.archive.org/web/20120301192255/http://www.roscosmos.ru/main.php?id=2&nid=10584&hl=progress+m-08m. 2012-03-01.
  7. Web site: Progress M-08M Launch Campaign Continues at Baikonur. 2010-10-19. Russian Federal Space Agency. 2010-10-23. dead . https://web.archive.org/web/20120301192304/http://www.roscosmos.ru/main.php?id=2&nid=10609&hl=progress+m-08m. 2012-03-01.
  8. Web site: Baikonur: Progress M-08M to be Assembled with the Launch Vehicle. 2010-10-22. Russian Federal Space Agency. 2010-10-23. dead . https://web.archive.org/web/20120301192318/http://www.roscosmos.ru/main.php?id=2&nid=10635&hl=progress+m-08m. 2012-03-01.
  9. Web site: Soyuz-U with Progress M-08M Rolled Out. Russian Space Agency. 2010-10-25. 2010-10-25. 5 March 2012. https://web.archive.org/web/20120305095010/http://www.federalspace.ru/main.php?id=2&nid=10653. dead.
  10. Nefedov. Anatoli. Morfill . Gregor. 2003. PKE–Nefedov: plasma crystal experiments on the International Space Station. New Journal of Physics. IOP Publishing Ltd and Deutsche Physikalische Gesellschaft . 5. 1 . 10. 10.1088/1367-2630/5/1/333. 2003NJPh....5...33N. free.
  11. Web site: Progress M-08M Prepared for Launch. Russian Federal Space Agency. 2010-10-25. 2010-10-26. 5 March 2012. https://web.archive.org/web/20120305095000/http://www.federalspace.ru/main.php?id=2&nid=10660. dead.
  12. Web site: Progress M-08M Cargo Supplies. Russian Federal Space Agency. 2010-10-27. 2010-10-28. 5 March 2012. https://web.archive.org/web/20120305095021/http://www.federalspace.ru/main.php?id=2&nid=10681. dead.
  13. Web site: Progress M-08M launches – Managers update status of ISS life support. Chris Bergin. 2010-10-27. 2010-10-28. NASAspaceflight.com.
  14. Web site: Soyuz-U Successfully Lifts Off from Baikonur. Russian Federal Space Agency. 2010-10-27. 2010-10-28. dead . https://web.archive.org/web/20120301192327/http://www.roscosmos.ru/main.php?id=2&nid=10675. 2012-03-01.
  15. Web site: Cargo craft begins pursuit of International Space Station. Justin Ray. 2010-10-27.
  16. Web site: New Russian Resupply Vehicle Docks to Station. NASA. 2010-10-30. April 29, 2023.
  17. Web site: ISS Orbit Boosted. Russian Federal Space Agency. 2010-10-21. 2010-10-23. dead. https://web.archive.org/web/20110927000550/http://www.roscosmos.ru/main.php?id=2&nid=10628. 2011-09-27.
  18. Web site: Cosmonaut flies resupply ship to space station docking. Justin Ray . 2010-10-30. 2010-10-31. Spaceflight Now.
  19. Web site: Progress M-08M Successfully Docks to the ISS. Russian Federal Space Agency. 2010-10-30. 2010-10-30. dead . https://archive.today/20120908074906/http://www.roscosmos.ru/main.php?id=2&nid=10707&lang=en. 2012-09-08.
  20. Web site: ISS crew opens hatch of Progress M-08M cargo spaceship. The Voice of Russia. 2010-10-31. 2010-11-01. https://web.archive.org/web/20101102151732/http://english.ruvr.ru/2010/10/31/30699347.html. 2010-11-02. dead.
  21. Web site: ISS: Expedition 25. spacefacts.de. April 29, 2023.
  22. Web site: NASA ISS On-Orbit Status 24 January 2011. SPACE REF. NASA. 24 January 2011. 4 February 2011.
  23. Web site: Russia's spaceship debris slump into Pacific Ocean. https://web.archive.org/web/20110128095155/http://news.xinhuanet.com/english2010/sci/2011-01/24/c_13705164.htm. dead. 28 January 2011. xinhua. 2011-01-24. 2011-02-05.