Port Muhammad Bin Qasim | |
Pushpin Map: | yes |
Location: | Karachi-75020, Sindh |
Coordinates: | 24.7667°N 87°W |
Locode: | PKBQM[1] |
Opened: | September 1980 |
Operated: | Port Qasim Authority |
Owner: | Ministry of Ports and Shipping and Government of Pakistan |
Type: | Artificial |
Sizeland: | 12,200 acres |
Berths: | 15 |
Employees: | 2,000 (1,576 Staff and 279 Officers) |
Leadershiptitle: | Chairman |
Leader: | Rear Admiral (R) Syed Hasan Nasir Shah, HI(M) |
Arrivals: | 1709 (FY 2020-21)[2] |
Cargotonnage: | 58 million metric revenue tons including 21.62 million MT of dry cargo and 19.968 million MT of liquid cargo (FY 2020-21) |
Containervolume: | 1,258,000 [TEU]s with tonnage of 16.405 million MT (FY 2020-21) |
Blankstatstitle1: | Tidal Variation |
Blankstats1: | 0.5 to 3.5m (at channel mouth and port)[3] |
Blankstatstitle2: | Deadweight Tonnage |
Blankstats2: | 75,000 DWT[4] |
Blankstatstitle3: | Ranking |
Blankstats3: | 121st busiest container port (TEU Container Traffic) in 2007[5] |
Website: | www.pqa.gov.pk |
The Port Muhammad Bin Qasim (Urdu: {{Nastaliq|محمد بن قاسم بندرگاہ Bandar-gāh Muhammad bin Qāsim), or Qasim Port Authority (Urdu: {{Nastaliq|مقتدرہ قاسم بندرگاہ), also known as Port Qasim, is a deep-water seaport in Karachi, Sindh, Pakistan, on the coastline of the Arabian Sea under the administrative control of the Secretary to the Government of Pakistan for Maritime Affairs. It is Pakistan's second busiest port, handling about 35% of the nation's cargo (17 million tons per annum). Port Qasim and Karachi Port, the busiest port of the country, together handle almost 90% of all external trade of Pakistan. The remaining maritime trade is routed through Gwadar Port.
The port encompasses a total area of 12000acres wherein many industrial zones operate. In addition to the Pakistan Steel Mills (PSM) and KESC Bin Qasim Power Plant, around 80% of the Pakistan's automotive industry is located at Port Qasim. The port also provides direct waterfront access to two major nearby industrial areas, Export Processing Zone (Landhi) and Korangi Industrial Area. Approximately 60% of country's export and import is originated from these areas. Port Qasim is managed by Port Qasim Authority, a semi-autonomous government body.[6]
In the 1970s, as a part of Pakistani Prime Minister Zulfiqar Ali Bhutto's program for economic reforms and establishment of heavy industries, country's first steel mill (Pakistan Steel Mills) was established near the southern city of Karachi. A purpose-built specialised port facility was also decided to be established for bulk handling of the massive imports of raw materials for steel production by the Pakistan Steel Mill of Pakistan.[7] In addition to the future economic demands and strategic needs, this port was also meant to relieve congestion at the only seaport Karachi Port of the country. This port was named as Port Muhammad bin Qasim (also known as Port Qasim), after the Muslim general Muhammad bin Qasim who conquered Daybul and the coastal areas of Sindh around 712 CE.[8] [9]
Port Qasim is located, adjacent to the Bin Qasim town, in the southern part of Malir district, Karachi division, in Sindh. It is located in an old channel of the Indus River at a distance of 35 kilometres east of Karachi city center.
The geographic position of the Port Qasim places it in close proximity to major shipping routes. The approach to the port is along a 45-kilometre long Navigation Channel which provides safe navigation for vessels up to .
Location of the Port Qasim makes it very well connected to the transportation infrastructure of the country. It is at distance of only 15 km from the national highway, providing direct access to the hinterland through road. A further 14 km of railway track inside the terminal links it to the national railway network through 6 railway tracks. Jinnah International Airport is also very near, at a distance of 22 km.
Port Qasim's residential area is a neighbourhood of Bin Qasim Town of Karachi.
The total area of the port comprises 3,520 acres (14.2 km2) with an adjacent 8,700 acres (35 km2) industrial estate. Port Qasim has been divided into three main zones as following:[10]
Zone | Total Area (Acres) | Area Reserved forPort Services (Acres) | Area Reserved forIndustrial Use (Acres) | |
---|---|---|---|---|
North Western Industrial Zone (NWIZ) | 2,920 | 904 | 2,016 | |
South Western Industrial Zone (SWIZ) | 1,000 | 125.5 | 874.5 | |
Eastern Industrial Zone (EIZ) | 8,300 | 2,490 | 5,810 | |
Total | 12,220 | 3,519.5 | 8,700 |
Currently Port Qasim is offering following facilities:
Facility | Berths | Berth Length | Owned by | Deadweight tonnage DWT | |
---|---|---|---|---|---|
Multipurpose Terminal | 4 | 200 m | PQA | 35,000 | |
Dirty Bulk Terminal | 460 m | Pakistan International Bulk Terminal Limited (PIBT) | |||
Container Terminal | 3 (Terminal 1) + 2 (Terminal 2) | 712 m (Terminal) + 615 m (Terminal 2) | Qasim International Container Terminal[11] | 45,000 | |
Liquid Chemical Terminal | 1 | TBC | Engro Vopak Terminal Limited | 75,000 | |
Oil Terminal | 1 | TBC | Fotco Oil Terminal | 75,000 |
Night navigation facilities are available at the port, handling up to vessels of LOA 202 meters during night.
Port Qasim has planned for a major expansion in coming years with FDI of US$1.22 billion approximately.Major expansion projects of the port are as following:[12]
Project | Capacity | Budget | Completion Year | |
---|---|---|---|---|
Liquid Cargo terminal | 4 million MT/year | US$15 million | 2009 | |
2nd Container Terminal | 1.175 million TEUs/year | US$250 million | 2011 | |
GasPort LNG Floating Terminal | 3 million MT/year | US$160 million | 2010 | |
Grain & Fertilizer Terminal | 4 million MT/year | US$100 million | 2011 | |
Coal, Clinker & Cement Terminal | 8 million MT/year | US$180 million[13] | 2011 | |
Granada LNG Terminal | 3.5 million MT/year | US$274 million | 2012 | |
2nd Oil Terminal | 9 million MT/year | US$51.4 million | 2012 | |
2nd Steel Jetty | 8 million MT/year | US$150 million | TBC | |
Deepening & Widening of navigation Channel | US$150 million | TBC | ||
Construction of a fly over and dual carriage way | Rs. 2 billion | TBC | ||
Infrastructure Development works in Eastern Industrial Zone | Rs. 8.8 billion | TBC | ||
Textile City with Power Plant & Waste Water Treatment Plant | Rs. 8.7 billion | TBC |
The country's first Integrated Cargo Container Control (IC3) facility is being constructed at Port Qasim with a joint investment over US$8 million by Pakistan Customs and the US Customs and Border Protection.
The purpose of the IC3 programme is to enhance international maritime trade security considering post 9/11 security issues. The IC3 programme envisages joint screening of US-bound containerised cargo from Pakistan via live video link by the customs authorities of Pakistan and the US. The US Customs will not subject the screened cargo to re-examination on arrival at US ports. This facility will support trade in terms of reduced time and cost of shipments.[14] [15]
Port Qasim is located on the northwest edge of the Indus Delta system. The system is characterised by long and narrow creeks, mud flats and the Indus River Delta-Arabian Sea mangroves, one of the largest mangrove forest ecosystems found in an arid climate. In 1972 eight species of mangrove trees were recorded from Pakistan,[16] however, only four continue to thrive. Several species of reptiles, birds, and terrestrial mammals inhabit the project area, wherever suitable habitats are found. These are constantly under threat due to increased shipping and industrial activities in the area.
WWF Pakistan has taken a mangrove conservation initiative recognising the social, ecological and economic significance of the mangrove forests in the coastal areas of Sindh and Balochistan. As a part of this, initiative has been taken on conservation of the mangrove ecosystem in the Korangi – Phitti Creek system, in the Indus Delta (including Port Qasim area). The project aims to conserve selected degraded mangrove forests in the Korangi – Phitti creek area through involvement of community, local schoolchildren and other stakeholders like Port Qasim Authority and the Government Forest Department.[17] [18]
In August 2003, the beach immediately west of the Port Qasim navigation channel was the scene of a major oil spillage when the Greek-registered Tasman Spirit ran aground. The environmental impact included large numbers of dead fish and turtles and a key mangrove forest, as well as dozens of people suffering nausea. At that time, it was feared that this incident will harm the coastal life in the Port Qasim area, however no major impact was observed near the Phitti Creek (waterway entrance to Port Qasim).[19]
Recently Port Qasim Authority (PQA) has announced that an implementation agreement is being signed for the development of a 'pollution-free' Coal, Cement and Clinker Terminal (CCCT) worth $175 million with a handling capacity of up to eight million tons per year at port. This step would save the environment from irreparable damages and the health of the port workforce and nearby populations from serious respiratory diseases which would have been a serious threat if the powdery coal was handled in open/bulk on berths at port.[20]