Porbandar–Delhi Sarai Rohilla Superfast Express Explained

Porbandar–Delhi Sarai Rohilla Superfast Express
Type:Superfast
Operator:Western Railway zone
Start: (PBR)
Stops:25
End: (DEE)
Distance:1373km (853miles)
Journeytime:23 hrs 55 mins
Frequency:Bi-weekly
Class:First AC, AC 2 tier, AC 3 tier, Sleeper Class, General Unreserved
Seating:No
Sleeping:Yes
Catering:Pantry Car
On-board catering
E-catering
Observation:ICF coach
Entertainment:No
Baggage:No
Otherfacilities:Below the seats
Stock:2
Trainnumber:20937/20938
Speed:57km/h, including halts

The Porbandar–Delhi Sarai Rohilla Superfast Express is an Superfast train belonging to Western Railway zone that runs between Porbandar and Delhi Sarai Rohilla in India. It is currently being operated with 20937/20938 train numbers on a bi-weekly basis.[1] [2] [3]

Coach composition

The train has standard ICF rakes with max speed of 110 kmph. The train consists of 22 coaches :

Service

19263/Porbandar–Delhi Sarai Rohilla Superfast Express has an average speed of 58 km/h and covers 1373 km in 23 hrs 55 mins.

19264/Delhi Sarai Rohilla–Porbandar Superfast Express has an average speed of 55 km/h and covers 1373 km in 24 hrs 15 mins.

Route and halts

The important halts of the train are:

Schedule

Train number Station code Departure station Departure time Departure day Arrival station Arrival time Arrival day
20937 PBR Porbandar 19:35 PM Tue,Sat Delhi Sarai Rohilla 19:30 PM Sun,Wed
20938 MFP Delhi Sarai Rohilla 08:10 AM Mon,Thu Porbandar 08:25 AM Tue,Fri

Rake sharing

The train shares its rake with 12905/12906 Shalimar–Porbandar Superfast Express, 19269/19270 Porbandar–Muzaffarpur Express and 19201/19202 Secunderabad–Porbandar Weekly Express.

Traction

Both trains are hauled by a Vadodara Loco Shed-based WAP-5 electric locomotive from Delhi Sarai Rohilla to Porbandar and vice versa.

See also

External links

Notes and References

  1. http://www.wr.indianrailways.gov.in/view_detail.jsp?lang=0&id=0,4,268&dcd=3196&did=1461906541618B4B5CE51E0172E689B19F13569C68015.web91 "WESTERN RAILWAY TO ATTACH EXTRA 3AC COACHES IN 19 PAIRS OF TRAINS ON TEMPORARY BASIS"
  2. http://epaper.bhaskar.com/detail/?id=590998&boxid=82904252265&ch=0&map=map&currentTab=tabs-1&pagedate=08/29/2014&editioncode=86&pageno=1&view=image "Provide Stoppage of 3 trains at dausa railway sattion (sic)"
  3. http://www.nr.indianrailways.gov.in/view_detail.jsp?lang=0&id=0,4,268&dcd=3695&did=139763008338248A1C1026F1F92BAF93729149A6BF894 "TEMPORARY AUGMENTATION OF EXPRESS TRAINS TO CLEAR RUSH DURING SUMMER-2014"