Poonamallee Bypass | |
Native Name Lang: | ta |
Style: | Chennai Metro |
Address: | Poonamallee, Chennai, Tamil Nadu 600056 |
Country: | India |
Owned: | Chennai Metro |
Operator: | Chennai Metro Rail Limited |
Platforms: | Island platforms Platform-1 → Lighthouse Platform-2 → Parandur Airport |
Tracks: | 2 |
Structure: | Elevated, Double track |
Parking: | No |
Accessible: | Yes |
Electrified: | Single phase 25 kV, 50 Hz AC through overhead catenary |
Opened: | Under construction |
Poonamallee Bypass metro station is a metro railway station on the Orange Line of the Chennai Metro. The station is among the 30 stations of corridor IV and 18 elevated stations along corridor IV of the Chennai Metro, Poonamallee Bypass–Lighthouse stretch. The station serves the neighbourhoods of Poonamallee.
Construction of the station began in 2021. The construction is being funded by Asian Infrastructure Investment Bank.[1]
The Poonamallee Bypass metro station will feature a depot, which will be one of the five depots of the Chennai Metro.[1] Built at a cost of 2,250 million, the depot will have 24 tracks and will be used for the repair, maintenance and cleaning of trains and will exclusively serve the trains to be operated on the Poonamallee–Light House stretch.[2] The depot will feature ballast tracks to save on capital expenditure, since laying ballastless track my cost an additional 800 to 900 million.[3]
G | Street level | Exit/Entrance | |||
valign=top | L1 | valign=top | Mezzanine | valign=top | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |||
Platform 1 Westbound | Towards ← Next Station: Poonamallee Depot | ||||
Platform 2 Eastbound | Towards → Next Station: Poonamallee | ||||
Side platform | Doors will open on the left | ||||
L2 | |||||