Pont Croesor railway station explained

Pont Croesor
Type:Station on heritage railway
Borough:Porthmadog, Gwynedd
Country:Wales
Coordinates:52.9506°N -4.0968°W
Grid Name:Grid reference
Owned:Festiniog Railway Company
Manager:Welsh Highland Railway
Platforms:2
Original:Croesor Tramway
Years:1923
Events:first station opened
Years1:1936
Events1:first station closed
Years2:22 May 2010
Events2:First passenger trains at present station
Years3:26 May 2010
Events3:Official opening
Years4:30 October 2010
Events4:First crossing of passengers trains
Years5:8 January 2011
Events5:Start of timetabled services south of Pont Croesor

Pont Croesor is a railway halt in Wales, on the Welsh Highland Railway, which runs through the Snowdonia National Park from Caernarfon to Porthmadog. It is located on the section between the stations of and .

Originally, as part of the Croesor Tramway, there was a siding at this location but no station. When the WHR was initially built in 1923 a small halt was provided; however, this closed with the railway in 1936 and all trace of this was removed when the line was lifted.

The line from Pont Croesor to has been connected since early 2009, being available for stock transfer purposes. The station was officially opened on 26 May 2010 and was the WHR's temporary terminus, having previously opened to passengers on 22 May 2010. The previous terminus at is now closed.[1] It opened to timetabled passenger services on 8 January 2011.[2]

When the station opened there was a full-length platform on the west side of the loop only, but with the commencement of through services in both directions during 2011 a second platform was provided. The station site is adjacent to Pont Croesor bridge, which crosses the River Glaslyn, and is a hybrid road/rail bridge, as each uses the same piers.[3] The bridge was extensively modified in appearance recently to feature standard safety barriers. The new loop was finally completed, for operational purposes, on 13 March 2010.

During the 2010 and 2011 seasons the station has featured a staffed booking office and gift shop; however with all trains terminating at Porthmadog for the 2012 season Pont Croesor is no longer a terminus, and has therefore been downgraded to an unstaffed halt. The station building has been removed to Blaenau Ffestiniog but the waiting room remains.

Ospreys

The station is adjacent to the viewing site of the Glaslyn Osprey Project,[4] from where the public can see the nesting place of a pair of ospreys.[5] Chicks have been successfully raised every year since 2005. The majority of the WHR's construction in this area has been carried out whilst the birds are abroad in the winter months, in order to keep disturbance to a minimum.[3]

See also

Notes and References

  1. Web site: 2010 Company Timetable . 14 February 2010.
  2. Web site: Ffestiniog Railway: Be the first to experience the completed Welsh Highland! . 19 January 2011 .
  3. Web site: WHR Project Phase 4: Pont Croesor . 17 March 2012.
  4. http://whr.bangor.ac.uk/phase4/pontcroesor-traeth.htm WHR Project Phase 4: Pont Croesor - Traeth Mawr
  5. http://www.rspb.org.uk/brilliant/sites/glaslyn/index.asp RSPB: Glaslyn osprey project