| |||||||||
Address: | Xylokastro-Evrostina 200 09, | ||||||||
Borough: | Achaea | ||||||||
Country: | Greece | ||||||||
Coordinates: | 38.1708°N 22.2785°W | ||||||||
Line: | Airport–Patras railway[1] | ||||||||
Train Operators: | Hellenic Train | ||||||||
Structure: | at-grade | ||||||||
Levels: | 2 | ||||||||
Platform: | 2 (side platforms) | ||||||||
Tracks: | 2 | ||||||||
Parking: | Yes | ||||||||
Bicycle: | No | ||||||||
Electrified: | No | ||||||||
Owned: | GAIAOSE[2] | ||||||||
Status: | Unstaffed | ||||||||
Mapframe: | yes | ||||||||
Mapframe-Zoom: | 13 |
Platanos railway station or Platanos Beach (Greek, Modern (1453-);: Σιδηροδρομικός Σταθμός Πλάτανος|Sidirodromikós Stathmós Platanos) is a Station[3] in Paralia Platanou, a small village in Achaea, Greece. It is located just North of the village, close to the Olympia Odos motorway. It was opened on 22 June 2020 as part of the €848-million ErgOSE[3] project extension of the Athens Airport–Patras railway to Aigio rail line, co-financed by the European Union's Cohesion Fund 2000–2006.[4] [5] The station is served by Hellenic Train local services between and .[6] It should not be confused with the now-closed station on the old Piraeus–Patras railway, which is located northeast of the current station, closer to the coast of the Corinthian Gulf
The Station opened 22 June 2020 by Minister of Transport, Kostas Karamanlis.[7] as part of the €848-million ErgOSE[3] project extension of the Athens Airport–Patras railway to Aigio railline[8] co-financed by the European Union's Cohesion Fund 2000–2006.[4] [5] It is constructed on upgraded sections of the former Piraeus–Patras railway SPAP line. It was one of three new stations in (Xylokastro, Akrata, and Aegio) and six holts (Diminio, Lykoporia, Lygia, Platanos Beach, Diakopto, and Eliki) to come online when the section of track opened.[9] It should not be confused with the now-closed station on the old Piraeus–Patras railway SPAP, which is located just west of the current station.
The raised station is accessed via stairs or a ramp. It has two side platforms, with station buildings located below the platform level, with access to the platform level via stairs or lifts. The Station buildings are equipped only with a waiting area. At platform level, both platforms have sheltered seating and Dot-matrix display departure and arrival screens and timetable poster boards. It is equipped with CCTV systems,[10] Fire Detection systems & Honeywell Security Systems.[11] There is no car park on-site, as Palea EO Korinthou Patron runs alongside eastbound platforms. Currently, there is no local bus stop connecting the station.
Since 15 May 2022, this station is served the following routes:
Ground level | Customer service | Exit/Tickets |
Level Ε1 | Side platform, doors will open on the right | |
Platform 1 | Hellenic Train to (Diakopto) ← | |
Platform 2 | Hellenic Train to (Akrata) → | |
Side platform, doors will open on the right |