Pink Line (Line 7) | |
Type: | Rapid Transit |
System: | Delhi Metro |
Status: | Operational |
Locale: | Delhi |
Start: | Majlis Park |
End: | Shiv Vihar |
Stations: | 38 |
Open: |
|
Owner: | Delhi Metro |
Operator: | Delhi Metro Rail Corporation |
Character: | Underground and Elevated |
Stock: | Hyundai-ROTEM |
Linelength: | 59.24km (36.81miles) |
Electrification: | overhead catenary |
Map State: | collapsed |
The Pink Line (Line 7) is a metro rail line of the Delhi Metro, a rapid transit system in Delhi, India.[1] It consists of 38 metro stations from Majlis Park to Shiv Vihar, both in North Delhi.
At 59.24km (36.81miles), the Pink Line is the longest individual line in the Delhi Metro and in India, exceeding the length of the operational Blue Line (excluding its branch line). It is mostly elevated and covers Delhi in an almost U-shaped pattern. The Pink Line is also known as the Ring Road Line, as the line passes alongside the Ring Road in Delhi.
The Pink Line has interchanges with most of the operational lines of the network, such as the Red Line at Netaji Subhash Place & Welcome, Yellow Line at Azadpur & Dilli Haat - INA, Green Line at Punjabi Bagh West, Blue Line at Rajouri Garden, Mayur Vihar Phase-I, Anand Vihar & Karkarduma, Dhaula Kuan of Airport Express (Orange Line) at Durgabai Deshmukh South Campus, Violet Line at Lajpat Nagar, as well as with Hazrat Nizamuddin and Anand Vihar Terminal (Indian Railways) and the ISBTs at Anand Vihar and Sarai Kale Khan.
The Pink Line has the highest point of the Delhi Metro at Dhaula Kuan with a height of 23.6 metres, passing over the Dhaula Kuan grade separator flyovers and the Airport Express Line.[2] It also possesses the country's smallest metro station, Ashram, with a size of just 151.6 metres against the usual 265 metres.[3] Also, the platform for a six-coach train is 140 metres but has been reduced to 135 metres in the Ashram station.
The line will be extended to Maujpur - Babarpur, creating one of the world's longest ring lines in the city. The Maujpur - Babarpur to Shiv Vihar section will then act as a branch line. The extension is expected to be completed by March 2025.[4]
The total length of the line is 59.24km (36.81miles).[5] There are 38 stations in the Pink Line, out of which 26 are elevated and 12 are underground.
The line was opened in five stages from March 2018 to August 2021. The first section on the Pink Line become operational from 14 March 2018 between Majlis Park to Durgabai Deshmukh South Campus, thereafter the section between Durgabai Deshmukh South Campus and Lajpat Nagar was opened on 6 August 2018, Shiv Vihar to Trilokpuri was opened on 31 October 2018. The section between Lajpat Nagar to Mayur Vihar Pocket I was opened on 31 December 2018.
The section between Trilokpuri Sanjay Lake and Mayur Vihar Pocket I was not completed as construction of a viaduct began late due to land acquisition issues at Trilokpuri.[6] This had rendered the Pink Line into two independent lines. Trains from Majlis Park would terminate at Mayur Vihar Pocket 1, while trains coming from Shiv Vihar would terminate at either IP Extension or Trilokpuri Sanjay Lake.
The final section between Trilokpuri Sanjay Lake and Mayur Vihar Pocket I was opened on 6 August 2021.[7]
See main article: List of Delhi Metro stations. The stations of the Pink Line are:[8]
Pink Line | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Station Name | Phase | Opening | Interchange Connection | Station Layout | Platform Layout | Depot Connection | Depot Layout | ||||
English | Hindi | ||||||||||
1 | मौजपुर - बाबरपुर | 4 | 2025[9] | Elevated | Side | None | None | ||||
2 | यमुना विहार | 4 | 2025 | None | Elevated | Side | None | None | |||
3 | भजनपुरा | 4 | 2025 | None | Elevated | Side | None | None | |||
4 | खजूरी ख़ास | 4 | 2025 | None | Elevated | Side | None | None | |||
5 | सोनिया विहार | 4 | 2025 | None | Elevated | Side | None | None | |||
6 | Soorghat | सूरघाट | 4 | 2025 | None | Elevated | Side | None | None | ||
7 | जगतपुर गांव | 4 | 2025 | None | Elevated | Side | None | None | |||
8 | झड़ौदा माजरा | 4 | 2025 | None | Elevated | Side | None | None | |||
9 | बुराड़ी | 4 | 2025 | None | Elevated | Side | None | None | |||
10 | मजलिस पार्क | 3 | 14 March 2018 | (Phase 4 - Under Construction) | Elevated | Side | Mukundpur Depot | At Grade | |||
11 | आज़ादपुर | 3 | 14 March 2018 | (Phase 4 - Under Construction) | Underground | Island | None | None | |||
12 | शालीमार बाग़ | 3 | 14 March 2018 | None | Underground | Island | None | None | |||
13 | नेताजी सुभाष प्लेस | 3 | 14 March 2018 | Underground | Side | None | None | ||||
14 | शकूरपुर | 3 | 14 March 2018 | None | Elevated | Island | None | None | |||
15 | पंजाबी बाग़ पश्चिम | 3 | 14 March 2018 | Elevated | Side | None | None | ||||
16 | ईएसआई - बसईदारापुर | 3 | 14 March 2018 | None | Elevated | Side | None | None | |||
17 | राजौरी गार्डन | 3 | 14 March 2018 | Elevated | Side | None | None | ||||
18 | मायापुरी | 3 | 14 March 2018 | None | Elevated | Side | None | None | |||
19 | नारायणा विहार | 3 | 14 March 2018 | None | Underground | Island | None | None | |||
20 | दिल्ली छावनी | 3 | 14 March 2018 | None | Elevated | Side | None | None | |||
21 | दुर्गाबाई देशमुख साउथ कैम्पस | 3 | 14 March 2018 | Elevated | Side | None | None | ||||
22 | सर एम. विश्वेश्वरय्या मोती बाग़ | 3 | 6 August 2018 | None | Elevated | Side | None | None | |||
23 | भीकाजी कामा प्लेस | 3 | 6 August 2018 | None | Underground | Island | None | None | |||
24 | सरोजिनी नगर | 3 | 6 August 2018 | None | Underground | Island | None | None | |||
25 | दिल्ली हाट - आईएनए | 3 | 6 August 2018 | Underground | Island | None | None | ||||
26 | साउथ एक्सटेंशन | 3 | 6 August 2018 | None | Underground | Island | None | None | |||
27 | लाजपत नगर | 3 | 6 August 2018 | Underground | Island | None | None | ||||
28 | विनोबापुरी | 3 | 31 December 2018 | None | Underground | Island | None | None | |||
29 | आश्रम | आश्रम | 3 | 2018 June | 31 December 2018 | None | Underground | Island | None | None | |
30 | सराय काले ख़ान - निज़ामुद्दीन | 3 | 31 December 2018 | Hazrat Nizamuddin Sarai Kale Khan ISBT | Underground | Island | None | None | |||
31 | मयूर विहार-१ | 3 | 31 December 2018 | Elevated | Side | None | None | ||||
32 | मयूर विहार पॉकेट १ | 3 | 31 December 2018 | None | Elevated | Side | None | None | |||
33 | त्रिलोकपुरी संजय झील | त्रिलोकपुरी संजय झील | 3 | 31 October 2018 | None | Elevated | Side | None | None | ||
34 | पूर्व विनोद नगर - मयूर विहार-२ | 3 | 31 October 2018 | None | Elevated | Side | None | None | |||
35 | मंडावली - वेस्ट विनोद नगर | 3 | 31 October 2018 | None | Elevated | Side | None | None | |||
36 | आईपी एक्सटेंशन | 3 | 31 October 2018 | None | Elevated | Side | Vinod Nagar - Ghazipur Depot | At GradeElevated | |||
37 | आनंद विहार | 3 | 31 October 2018 | Anand Vihar Terminal railway station Anand Vihar ISBT | Elevated | Side | None | None | |||
38 | कड़कड़डूमा | 3 | 31 October 2018 | Elevated | Side | None | None | ||||
39 | कड़कड़डूमा कोर्ट | 3 | 31 October 2018 | None | Elevated | Side | None | None | |||
40 | कृष्णा नगर | 3 | 31 October 2018 | None | Elevated | Side | None | None | |||
41 | आज़ाद नगर पूर्व | 3 | 31 October 2018 | None | Elevated | Side | None | None | |||
42 | वेलकम | 3 | 31 October 2018 | Elevated | Side | None | None | ||||
43 | जाफ़राबाद | 3 | 31 October 2018 | None | Elevated | Side | None | None | |||
44 | मौजपुर - बाबरपुर | 3 | 31 October 2018 | (Phase 4 - Under Construction) | Elevated | Side | None | None | |||
45 | गोकुलपुरी | 3 | 31 October 2018 | None | Elevated | Side | None | None | |||
46 | जौहरी एनक्लेव | 3 | 31 October 2018 | None | Elevated | Side | None | None | |||
47 | शिव विहार | 3 | 31 October 2018 | None | Elevated | Side | None | None |
Pink Line | |||
---|---|---|---|
Rakes | Hyundai Rotem | Alstom Metropolis | |
Train Gauge | 4 ft in (1,435 mm) standard gauge | ||
Electrification | 25 kV, 50 Hz AC through overhead catenary OHE | ||
Train's Maximum Speed | 100 km/h | ||
Train Operation | Delhi Metro |