Philipsdam Explained

Bridge Name:Philipsdam
Native Name Lang:nl
Carries:N257
Owner:Rijkswaterstaat
Architect:F.W. de Vlaming (locks and buildings)
F.L. Halenbeek (Landscape)
Engineering:Deltadienst
Length:6.1km (03.8miles)
Builder:Several contractors, including:
Combinatie Zinkcon bv
Aannemers Combinatie Zinkwerken bv
J. Heijmans bv
Baggermaatschappij 'Holland' bv.
Begin:1976
Complete:1987

The Dutch; Flemish: '''Philipsdam''' is a compartmentalisation dam constructed as part of the Delta Works in the Netherlands. It separates water of the lakes Krammer and Volkerak from the Oosterschelde, and connects the Grevelingendam to Sint Philipsland.[1]

History, design, and construction

Design and optioneering

The need for the dam

In 1974, it was decided by Rijkswaterstaat and the Den Uyl cabinet to construct the Oosterscheldekering as a storm surge barrier at the mouth of the Oosterschelde, instead of completely closing off the tidal inlet at that location. The construction of the Oosterscheldekering required the compartmentalisation of the basin.[2]

The compartmentalisation model chosen involved the construction of the Philipsdam, the Oesterdam, and a discharge channel for managing the level and quality of the lake that would then form behind the dams. The overall project was also required to create a freshwater lake for water management purposes, ensure a tide-free navigation on the Scheldt-Rhine connection, and achieve a tidal difference of 2.7m at Yerseke.

Optioneering and preliminary design

To prevent unacceptable flow velocities from being realised in the Scheldt-Rhine Canal during the works, the closing phases of both the Philipsdam and the Oesterdam had to be coordinated with each other.[3] A number of alternatives to the final location of the Philipsdam and the lock complex were investigated, with an important consideration being the preservation of valuable intertidal areas along with considerations of the closure method to be employed.[4]

The decision-making process for the nature and location of the Philipsdam involved a comprehensive consideration of multiple factors, leading to the selection of the variant at a sandbank known as Plaat van de Vliet as the preferred option. Key considerations included:[5] The connection of the damn to the Grevelingendam instead of the southern shore of Goeree-Overflakkee was chosen to allow for the option of turning the Grevelingenmeer into a freshwater basin by feeding it via a discharge sluice from the Krammer, which was ultimately decided against.[6] The benefit of this route is that it also removed the requirement for an additional road bridge across the Krammer instead connecting it to the existing road over the Grevelingendam.[6]

Table: Maximum speeds and volumes! Waterway !! Max. Ebb Speed (m/s) !! Max. Ebb Volume (m³/s) !! Max. Flood Speed (m/s) !! Max. Flood Volume (m³/s)
Slaak0.9 2000 0.75 2000
Krammer 1.05 11000 1.05 12500

The road connection on the south side of the dam required significant research during the design stage, as it runs through vulnerable nature reserves.[8]

Construction

Construction on the Philipsdam commenced in 1976, starting with the creation of a 96-hectare temporary work island on a sandbank known as Dutch; Flemish: Plaat van de Vliet.[9] [10] [11] [12]

Eighteen months after initiation, the island's construction concluded, paving the way for the commencement of the locks aimed at facilitating inland navigation and accommodating yachts. By 1983, the Krammer locks complex was completed, and the dam was officially inaugurated on February 2, 1987. A second lock for yachts was added in 1994.[13]

The Philipsdam functions as a dam, a fresh-salt water separator, and a lock system. It mitigates tidal influences within the Scheldt-Rhine connection, ensuring the Port of Antwerp remains accessible. To the dam's west lies saltwater, while to its east, freshwater flows from the Waal and Bergse Maas.

On the dam's saltwater side, the Oosterschelde's water level is maintained, ensuring the conservation of salt marshes and mudflats vital for oyster farming. The freshwater side supports extensive vegetation due to its drier conditions. The inclusion of a lock complex facilitates the passage of ships, featuring an innovative system for fresh-salt water separation.

In addition to the main road over the crest of the dam, there is a parallel road on its eastern side which was constructed to offer access to recreational zones. The dam's southern route was deliberately positioned as far west as possible from the Plaat van Vliet and Krammerse Slikken, maximising the recreational potential of these mudflats. Efforts were made to preserve the ecological and tidal areas of the Slaak (the region between the dam and the northern side of Sint Philipsland), whilst minimising the impact on agricultural land in Sint Philipsland.

Locks

The locks are technically sophisticated because they must avoid the exchange between the freshwater Volkerak and the brackish water of the Oosterschelde. The locks are designed so that there is no influx of saltwater that enters the Volkerak and only a little fresh water in the Oosterschelde. The locks rely on the physical principle that saltwater is denser and sinks, while freshwater rises. By a complex system of pipes and pumps, the saltwater is pumped from the bottom, or conversely, freshwater is pumped from the top, depending on the direction of the ship. Locks on inland waterways are 280 metres long and 24 metres wide.[14]

Environmental impacts

The dam considerably changed the surrounding landscape. Shortly after closure, the water became fresh and the level in the Krammer-Volkerak was fixed at zero centimeters NAP (Amsterdam Ordnance Datum). As a result, nearly two thousand hectares of salt marshes, mudflats, and sandflats permanently dried out. Shoreline erosion was mitigated by constructing foreshores. In the 1990s, around forty islands were created that are of great importance for coastal breeding birds, meaning that the alluvial tidal marsh now supports rich animal life. An observation hut was installed to facilitate the observation of the many species of birds, such as the pied avocet.

See also

External links

Information (in Dutch) about the Philipsdam From the Watersnoodmuseum Knowledge Centre website

Notes and References

  1. Web site: Rijkswaterstaat . 29 December 2022 . Krammersluizen en Philipsdam . The Krammer Sluices and the Philipsdam . 29 December 2022 . www.rijkswaterstaat.nl . nl-NL.
  2. Book: Rijkswaterstaat . Compartimenteringswerken . 1980 . Rijkswaterstaat . The Hague . nl . Compartmentalisation Works . 4 April 2024.
  3. Compartimentering Oosterschelde - getijmodel Oosterschelde : onderzoek naar de fasering bij de aanleg van de Philipsdam en de Oesterdam bij gereduceerd getij interim-verslag modelonderzoek . Compartmentalisation of the Eastern Scheldt - Eastern Scheldt tidal model: Research into the phasing during the construction of the Philipsdam and the Oesterdam with reduced tide. Interim report on model research. . van Wijngaarden . N.J. . Hartsuiker . G. . 1977 . . Agema . J.F. . 4 April 2024 . Jan Agema . nl.
  4. Beschouwing naar aanleiding van "de interimnota nr. 2" : fasering en sluitmethode Compartimenteringsdammen . Reflections on "Interim Note No. 2": Phasing and Closure Method of Compartmentalisation Dams . van Roode . F.C. . Tutuarima . W.H. . 1979 . . Brakel . J. . Groothuizen . A.G.M. . 4 April 2024 . nl.
  5. Book: The Closure of tidal basins: closing of estuaries, tidal inlets, and dike breaches . 1987 . Delft University Press . Huis in 't Veld . J. C. . Stuip . J. . Walther . A.W. . van Westen . J.M. . 90-6275-287-X . 2nd . Delft, the Netherlands . 18039440 . 29 March 2024.
  6. Web site: Philipsdam . WatersnoodMuseum . Stichting Beheer Watersnoodmuseum . 9 April 2024.
  7. Rijkswaterstaat . 1975 . Driemaandelijks bericht Deltawerken 071-080 (1975-1979) . Quarterly Bulletin of the Deltaworks 071-080 (1975-1979) . Driemaandelijks Overzicht van de Deltawerken (Deltaplan) en Gerelateerde Werken (Dijkversterkingen in Holland, Friesland en Groningen, Lauwerszeewerken). Aanleg Stormvloedkeringen Hollandse IJssel en Oosterschelde. Afsluitdammen Met Caissons en Kabelbaan in Veerse Gat, Brouwershavense Gat, Oosterscheldewerken, Spuisluis Haringvliet, Waterhuishouding van het Deltagebied, Milieueffecten. De Secundaire Werken (Vokerak, Grevelingen, Zandkreek, Zoommeer, Philipssluizen, Krammersluizen, Hellegatsplein). Waterloopkundig Onderzoek en Uitvoeringsmethoden. . nl . 71–080 . 29 December 2022 . TU Delft. Anonymus. A..
  8. Rijkswaterstaat . 1977 . Driemaandelijks bericht Deltawerken 081-090 (aug 1977-nov 1979) . Quarterly bulletin of the Delta Works: 081-090 (August 1977-November 1979) . Quarterly Bulletin of the Delta Works . nl . 81–090 . 29 December 2022 . TU Delft Repository. Anonymus. A..
  9. February 1975 . De Regeringsbeslissing over de afsluiting van de Oosterschelde . 8e tiental . Driemaandelijks Bericht Deltawerken . 71 . blz 3-5 . The Government Decision on the Closure of the Eastern Scheldt . nl . 29 March 2024.
  10. August 1975 . Het rapport van de Commissie Compartimentering Oosterschelde . 8e tiental . Driemaandelijks Bericht Deltawerken . 73 . blz 111-114 . The Report of the Eastern Scheldt Compartmentalization Commission . nl . 29 March 2024.
  11. Aanleg werkeiland Philipsdam . Construction of Philipsdam Work Island . Baggermaatschappij Holland BV . Hardinxveld, Netherlands . nl.
  12. Book: Baggermaatschappij Holland . Creating an artificial island - Philipsdam . 1980 . Baggermaatschappij Holland . Hardinxveld . en . 4 April 2024.
  13. Book: Steenhuis . M. . De Deltawerken . Voerman . L. . 2016 . nai010 uitgevers . 978-94-6208-272-4 . Rotterdam . nl . The Delta Works.
  14. Watson . I. . Finkl . C. W. . 1990 . State of the Art in Storm-Surge Protection: The Netherlands Delta Project . Journal of Coastal Research . 6 . 3 . 739–764 . 29 March 2024 . 4297737 . 0749-0208.