Pforzheim Hauptbahnhof Explained

Pforzheim Hauptbahnhof
Symbol:rail
Symbol Location:de
Symbol2:S
Symbol Location2:Karlsruhe
Type:Through station
Platforms:7
Passengers:ca. 50,000 daily
Zone:
  • VPE

    10[1]

  • KVV

    VPE (VPE transitional tariff, season and select daily passes only)[2]

  • VGC

    950 (VPE transitional tariff)[3]

Opened:4 July 1861
Architect:Helmuth Conradi
Architectural Style:Modernist
Address:Bahnhofplatz 1, Pforzheim, Baden-Württemberg
Country:Germany
Coordinates:48.8936°N 8.7031°W
Owned:Deutsche Bahn
Operator:DB Station&Service
Line:
Website:www.bahnhof.de
Map Type:Baden-Württemberg#Germany#Europe
Map Dot Label:Pforzheim
Embedded:
Stroke-Colour:
  1. C60C30
Stroke-Width:3
Marker:rail-underground
Marker-Colour:
  1. 009D58
Zoom:15

Pforzheim Hauptbahnhof is the main station in the city of Pforzheim in the German state of Baden-Württemberg.

History

The first Pforzheim station was opened on the 3 July 1861 on the Karlsruhe–Mühlacker railway by the Grand Duchy of Baden State Railway (Großherzoglich Badische Staatseisenbahnen). With the opening of the Enz Valley Railway (Enztalbahn) to Wildbad (11 June 1868) and the Nagold Valley Railway (Nagoldtalbahn) to Horb (1 June 1874), Pforzheim developed into an interchange station with considerable traffic. Both lines were operated by the Royal Württemberg State Railways (Königlich Württembergischen Staats-Eisenbahnen) and they received their own platform tracks to the west of the station.

The station building was built in 1861 in the neoclassical style and consisted of a long, single-storey central building with two-story wings at right-angles at each end. It was destroyed on 23 February 1945 during the bombing of Pforzheim.[4]

New building of 1958

The new station building was opened in June 1958. The architect was Helmuth Conradi (1903-1973), who had already designed the entrance building of Heidelberg Hauptbahnhof, which was opened in 1955. The defining component is the entrance hall, which has a glass facade opening to the station forecourt that runs from the floor to the eaves. A very thin canopy marks the main entrance; its cladding with gold-anodised aluminum plates refers to the importance of the watch and jewelry industry for Pforzheim.

Inside the hall, strips on the ceiling that continue along the back wall are used for indirect lighting. The lobby is framed by two granite walls, windowless on the left and with a station clock and a large trapezoidal window on the right. Service rooms open onto the platform. Two annexes with the station restaurant and a waiting room for buses extend beyond the line made by the front of the entrance building.[5] [6]

In the main hall there is a large wall relief by Josef Karl Huber, on the theme of the "Gold City [Pforzheim] at the gate of the Black Forest" (Goldstadt an der Schwarzwaldpforte), which includes a dynamic pattern of swinging curves. The architect Conradi and the artist Huber had met in an English prisoner of war camp and spent two years together there.[7] The building has been described as "one of the finest and most modern station building of Deutsche Bundesbahn"[8] and has been listed as a cultural monument of the post-war period since 1989. The listing was instigated by plans of Deutsche Bundesbahn to replace a counter by a travel centre on the ground floor of the station. The heritage office then placed the station under protection, so that the necessary alterations did not alter the original nature of the building.

The refurbishment of the station started at the beginning of February 2011. Three lifts were put into operation in June 2012, providing barrier-free access to the platforms.[9]

In a second construction phase, starting in October 2015, the platforms on the tracks 1, 2/3, 4/5 and 103/104 were raised to 55 centimetres above the top of the rail to allow easier and sometimes stepless access to the trains.[10] [11]

The work was due to be completed in spring 2017.[12] The conversion cost €7.3 million, of which the city of Pforzheim funded €1.8 m.[13]

West of the main station, Abellio Rail Baden-Württemberg plans to build a depot with sidings between the end of 2017 and the beginning of 2019.[14]

Rail services

As a station on the east-west route from Paris via Straßburg, Karlsruhe, Stuttgart and Munich to Vienna, Pforzheim was a stop for the Orient-Express in 1883.[15] The spa of Wildbad at the end of the Enz Valley Railway was a significant destination for through coach connections for decades and the attachment and detachment of coaches to/from the trains of the Enz Valley Railway were made partly in Pforzheim. The last through coach connection to Wildbad were discontinued in 1995.[16] The Nagold Valley Railway was served predominantly by regional services; between 1952 and 1964 an express train operated from Frankfurt running via Pforzheim and Horb to Konstanz.[17]

Pforzheim Hauptbahnhof lost importance from 1991 for long-distance traffic with the opening of the Mannheim–Stuttgart high-speed railway for long-distance trains between Karlsruhe and Stuttgart, which made it possible to bypass Pforzheim using a connecting curve at Bruchsal. The loss of long-distance connections is strongly criticised locally.[15] In the 2017/2018 timetable, long-distance traffic at the station is limited to services on Intercity line 61, which run every two hours between Nuremberg and Karlsruhe. The station is also served by several regional services operated at regular intervals, including an Interregio-Express/ Regional-Express line, a Regionalbahn line and two Karlsruhe Stadtbahn lines.

Long distance

Line Route Frequency
(Stuttgart – – Pforzheim  – Karlsruhe – – – HeidelbergMannheimFrankfurt Airport -) Frankfurt –  –  –  – Siegen –Siegen-Weidenau –  – Lennestadt-Altenhundem – Lennestadt-Grevenbrück –  – Plettenberg –  – Altena – Iserlohn-Letmathe – Witten – DortmundOne train pair (Mon–Fri)
Karlsruhe – Pforzheim – Mühlacker – Vaihingen – Stuttgart – Schorndorf – Aalen – Ellwangen – Crailsheim – Ansbach – Nuremberg – Bamberg – Lichtenfels – Kronach – Saalfeld – Jena-Göschwitz – Jena Paradies – Naumburg – Weißenfels – LeipzigEvery two hours between Karlsruhe and Nuremberg, individual services to Leipzig

Regional services

Line Route Frequency
Karlsruhe  – Pforzheim – Mühlacker – Vaihingen (Enz) – Stuttgart (– Schorndorf – Aalen)Hourly, every two hours to Aalen
Stuttgart  – Ludwigsburg – Bietigheim – Vaihingen – Mühlacker – Pforzheim – (Wilferdingen-Singen)Every half hour to Bietigheim, hourly to Stuttgart
Pforzheim – Calw – Nagold – Horb (– Tübingen)Pforzheim – Nagold: every half hour (peak)
Nagold – Horb: hourly
Horb – Tübingen: some trains
RB 99 Klosterstadt-Express(Pforzheim /) Mühlacker – Maulbronn StadtSome trains in the summer half-year
Wörth – Karlsruhe-Knielingen – Karlsruhe-Durlach – Söllingen – PforzheimEvery half hour
EnztalbahnPforzheim – Brötzingen – Neuenbürg – Höfen – Hourly (+extra peak hour services)

Notes and References

  1. Web site: Der VPE Tarifzonenplan . . 19 February 2021.
  2. Web site: Wabenplan . . 19 February 2021 . 13 December 2020.
  3. Web site: VGC Tarifrechner 2021 . . 19 February 2021.
  4. Book: Berger, Manfred . Historische Bahnhofsbauten . III: Bayern, Baden, Württemberg, Pfalz, Nassau Hessen . Transpress. Berlin. 1988 . 3-344-00267-8 . 150. de.
  5. Book: Neue Bahnhöfe. Die Empfangsgebäude der Deutschen Bundesbahn 1948–1973.. Verlag B. Neddermeyer. Berlin. 2004 . 3-933254-49-3 . 43ff. de.
  6. Roland . Feitenhansl . Avantgarde gestern und heute. Bahnhofsbauten der 1950er Jahre in Baden-Württemberg. https://web.archive.org/web/20140513011022/http://www.denkmalpflege-bw.de/fileadmin/media/publikationen_und_service/nachrichtenblaetter/2010-3.pdf . 13 May 2014. Denkmalpflege in Baden-Württemberg. Nachrichtenblatt der Landesdenkmalpflege . PDF; 6.5 MB) . 3. 2010 . 39 . 0342-0027. 137. de.
  7. Christoph . Timm . Baudenkmale der Nachkriegsepoche in Pforzheim und ihre Probleme. Badische Heimat . 3. 1995 . 429–431. de.
  8. Book: Schack, Martin . Neue Bahnhöfe . Nederbeyer . Berlin . 2004 . 187. de.
  9. News: Marek. Klimanski . Endlich: Barrierefrei zu Bahnsteigen im Pforzheimer Hauptbahnhof . https://web.archive.org/web/20120629033737/http://www.pz-news.de/pforzheim_artikel,-Endlich-Barrierefrei-zu-Bahnsteigen-im-Pforzheimer-Hauptbahnhof-_arid,352955.html. 29 June 2012. live . . 25 June 2012. 1 May 2018. de.
  10. Web site: Bauprojekt Pforzheim Hauptbahnhof . https://web.archive.org/web/20160418173317/http://bauprojekte.deutschebahn.com/p/pforzheim-hbf . 18 April 2016 . BauInfoPortal . Deutsche Bahn AG . 2 May 2018. de.
  11. News: Marek . Klimanski . Fünf Millionen Euro für Bahnhofs-Erneuerung . https://web.archive.org/web/20160418173322/http://www.pz-news.de/pforzheim_artikel,-Fuenf-Millionen-Euro-fuer-Bahnhofs-Erneuerung-_arid,1056315.html. 18 April 2016. live . Pforzheimer Zeitung . 29 October 2015 . 2 May 2018. de.
  12. Barrierefreier Ausbau geht weiter . DB Welt, Regionalteil Südwest . 11 . 2015 . 17. de.
  13. News: Pforzheimer Bahnhof runderneuert: Wirtschaftswunderbahnhof in neuem Glanz. 13 October 2017. 2 May 2018. de. SWR Aktuell.
  14. Abellio errichtet neues Bahnbetriebswerk in Pforzheim . Abellio . 10 February 2017 . https://web.archive.org/web/20170212091234/https://www.abellio.de/de/baden-wuerttemberg-deutschland/unternehmen-news/media-center/presse/abellio-errichtet-neues . 12 February 2017. live . 2 May 2018. de.
  15. News: Michael . Block. Pforzheimer Hauptbahnhof: vom Prunkstück zum Skandalobjekt . Pforzheimer Zeitung . 4 May 2008. de.
  16. Book: Geier, Martin . Die Enztalbahn. Von der Stilllegungsdiskussion zur Stadtbahn. Verlag Regionalkultur . Ubstadt-Weiher . 2003 . 3-89735-249-4 . 46, 127. de.
  17. Book: Hans-Wolfgang . Schar. Burkhard . Wollny. Die Eisenbahn im Nordschwarzwald. 2: Ausgestaltung, Betrieb und Maschinendienst. EK-Verlag . Freiburg . 1995 . 3-88255-764-8 . 107. de.