Percival Lane power station | |
Country: | United Kingdom |
Location: | Runcorn Cheshire |
Status: | Decommissioned and demolished |
Construction Began: | 1920 |
Commissioned: | A: 1921, B: 1941 |
Decommissioned: | late 1960s |
Owner: | Mersey Power Company (1921–1948) British Electricity Authority (1948–1955) Central Electricity Authority (1955–1957) Central Electricity Generating Board (1958–1970) |
Operator: | As owner |
Th Fuel Primary: | Coal |
Th Technology: | Steam tubines |
Ps Site Area: | 27 acres 10.93 ha |
Ps Chimneys: | A 2, B 2 |
Ps Cooling Towers: | None |
Ps Cooling Source: | Canal water |
Ps Units Operational: | 3 x 12.5 MW, 3 x 30 MW |
Ps Units Manu Model: | 12.5 MW Parsons; 30 MW English Electric |
Ps Units Decommissioned: | All |
Ps Electrical Capacity: | 110 MW (1942) |
Ps Annual Generation: | 341 GWh (1955) |
The Percival Lane power station in Runcorn was built and operated by the Mersey Power Company Limited. It comprised two stations A and B commissioned in 1921 and 1941. The station supplied electricity to commercial, industrial and domestic users over a wide area of 95 square miles around the River Mersey including Widnes, Ellesmere Port and Runcorn.
In 1911 the Salt Union[1] built a vacuum evaporating plant at Runcorn to produce salt from brine. Steam was generated to drive turbo-alternators. The exhaust steam from the turbines was used to evaporate brine. Only a portion of this energy was used in the salt works; the Salt Union obtained parliamentary authority to provide a public supply of electricity.[2] This was through two Electric Lighting Orders: the Runcorn Electric Lighting Order 1910 and the Widnes Electric Lighting Order 1910, both these Orders were authorised by Parliament under the Electric Lighting Orders Confirmation (No.1) Act 1910 (10 Edw. 7 & 1 Geo. 5, c. lxxv).[3] A new company, the Mersey Power Company Limited, was formed in 1911 to operate the public electricity supply. In 1918 the Company resolved to build a large generating station at Percival Lane, Runcorn (53°19'53"N 2°45'25"W) to meet the expanding demand for electricity. The company had local industrialists among its major shareholders and was able to promote and encourage the use of electricity by local industry.[4]
The first station at Percival Lane was the ‘A’ or low pressure (LP) generating station which was commissioned in 1922.
The initial configuration of plant comprised:[5]
A switch house contained Reyrolle compound-filled gear, which had a rupturing capacity of 750,000 kVA (33 kV switchgear) and 350,000 kVA (6.6 kV switchgear). The 33 kV switchgear controlled two 132/33 kV main step-down transformers, two 6.6/33 kV step-up transformers, and 33 kV lines to Chester. The 6.6 kV switchgear controlled the three generators, the interconnecting and station transformers, and the various trunk feeders. A reactor house contained single-phase British Thomson-Houston reactors. The outdoor transformers had a ratio of 6/33 kV, those for the three Ellesmere Port lines were arranged in three banks, connected delta-star. Other transformers were associated with the two 25 mile (40.2 km) lines to Crewe and the 100 mile (161 km) line to Maentwrog, North Wales. The distribution system included the provision of 161 miles (259 km) of cables and 47 sub-stations.
Supplies of electricity to consumers were available at 3-phase, 50 Hz, 6.0 kV, 3.0 kV and 440 Volts for industrial consumers and single phase 250 Volts for domestic consumers.
The loads and connections on the supply system in 1921-23 were:
1921 | 4,900 | 13,050 | 59.4 | |
1922 | 3,700 | 17,360 | 32.1 | |
1923 | 7,430 | 19,650 | 45.1 |
To meet increased demand, in 1926 a further four Babcock and Wilcox boilers and one further 12.5 MW Parsons turbo-alternator were commissioned.
The electricity sold 1921 to 1926
Usage MWh | ||||||
1921 | 1922 | 1923 | 1925 | 1926 | ||
---|---|---|---|---|---|---|
Lighting and domestic | 252.31 | 354.68 | 490.77 | |||
Public lighting | – | – | – | |||
Traction | – | – | – | |||
Power | 23,729.7 | 8,583.57 | 21,679.64 | |||
Total | 23,982.02 | 8,938.26 | 22,170.40 | 45,725.00 | 50,760.00 |
In 1923 another generating station was operated by the company. This was the Weston Point gas-fired station comprising two 750 kW gas fired generators.
Under the terms of the Electricity (Supply) Act 1926 (16-17 Geo. 5 c. 51)[12] the Central Electricity Board (CEB) was established. The CEB identified high efficiency ‘selected’ power station that would supply electricity most effectively; Percival Lane was designated a selected station.[13] The CEB also constructed the national grid (1927–33) to connect power stations within a region. Percival Lane was a critical part of the grid as it formed the connecting point between the North West England and North Wales schemes and the Central England scheme.
The grid enabled the company to provide bulk supplies of electricity to the Mid-Cheshire Electricity Supply Company and to the North Wales Power Company.
The ‘B’ or high pressure station was built on an adjacent site in 1940–41.[14]
In 1946 Percival Lane power station sent out 603.89 GWh of electricity, operated at a load factor of 60.8 per cent, and had a thermal efficiency of 2.65 per cent.[15]
Upon nationalisation of the British electricity supply industry in 1948 under the provisions of the Electricity Act 1947 (10-11 Geo. 6 c. 54)[16] The Mersey Power Company was abolished, ownership of Percival Lane power station was vested in the British Electricity Authority, and subsequently the Central Electricity Authority and the Central Electricity Generating Board (CEGB).[17] At the same time the electricity distribution and sales responsibilities of the Mersey electricity undertaking were transferred to the North Western Electricity Board (NORWEB).
Operating data for post-nationalisation Percival Lane power station is summarised in the following tables.[18] [19] [20]
1954 | 1226 | 24 | 13.30 | 11.31 | |
1955 | 1260 | 24 | 15.50 | 12.53 | |
1956 | 395 | 24 | 2.86 | 9.03 | |
1957 | 131 | 24 | 0.723 | 5.23 | |
1958 | 86 | 24 | 0.21 | 2.06 | |
1961 | 0.5 % | 24 | 0.99 | 6.06 | |
1962 | 2.8 % | 24 | 5.82 | 2.8 | |
1963 | 4.04 % | 24 | 8.50 | 11.49 | |
1967 | (1.2 %) | 24 | 2.542 | 9.99 |
The operating parameters for Percival Lane B HP power station were as follows.
1954 | 6421 | 86 | 297.10 | 22.76 | |
1955 | 6812 | 86 | 324.82 | 22.49 | |
1956 | 6072 | 86 | 250.79 | 21.81 | |
1957 | 5212 | 86 | 206.49 | 21.34 | |
1958 | 3668 | 86 | 127.59 | 21.80 | |
1961 | 12.9 % | 86 | 97.19 | 19.33 | |
1962 | 20.6 % | 86 | 155.56 | 20.47 | |
1963 | 17.01 % | 86 | 128.13 | 20.54 | |
1967 | 17.2 % | 86 | 129.74 | 19.34 |
In April 1950 one of the 12.5 MW Parsons turbo-alternators in the A station was transferred to Wallasey power station.
The Percival Lane power station closed in the late 1960s and was subsequently demolition.[21] The 132 kV substation, built to connect Percival Lane to the national grid, is still operational.[22]