Pasuruan–Probolinggo Toll Road Explained
Country: | IDN |
Type: | Toll |
Pasuruan–Probolinggo Toll Road |
Alternate Name: | Paspro Toll Road |
Maint: | PT Trans Jawa Paspro Jalan Tol (TJPJT) |
Length Km: | 38.3 |
Image Notes: | Westbound Pasuruan–Probolinggo Toll Road heading to Pasuruan Regency in 2023 |
Formed: | 2018 |
Direction A: | West |
Terminus A: | Grati |
Direction B: | East |
Provinces: | East Java |
Route: | 1 |
Pasuruan–Probolinggo Toll Road or Paspro Toll Road is a toll road in East Java, Indonesia. This 38.3km (23.8miles) highway connects Pasuruan with Probolinggo. The toll road is operational since the end of 2018.[1] [2] [3]
Sections
The Paspro toll road project consists of three sections,[4]
- Section I: 13.5km (08.4miles) from Grati, Pasuruan Regency to Tongas, Probolinggo Regency.
- Section II: 6.9km (04.3miles) between Tongas and Western Probolinggo city.
- Section III is 10.9km (06.8miles) long, starting from Western Probolinggo to Eastern Probolinggo.
See also
Notes and References
- News: Kredit Sindikasi Rp 2,29 Triliun untuk Tol Pasuruan-Probolinggo. Kompas. 27 October 2018.
- News: Tol Pasuruan-Probolinggo Hampir Rampung, Ini Progresnya. Detik. 27 October 2018.
- News: Menteri Rini: Tol Pasuruan-Probolinggo Bisa Dipakai Lebaran 2018. Tempo. 27 October 2018.
- Web site: Pembebasan Lahan Tol Pasuruan-Probolinggo Lebih Cepat . October 27, 2018.