The Agua Negra Pass (Spanish: Paso de Agua Negra) is a pass over the Andes mountains which connects Argentina and Chile. The highest point of this pass is at 4780m (15,680feet) AMSL.[1]
Agua Negra Tunnel
To improve trade between Chile and Argentina, a 14 km, three-bore vehicular tunnel (two for traffic and one for ventilation) below the pass is planned, which will allow year-round traffic.[2] [3] (The pass is closed for much of the winter.)
In March 2015, Argentina officially approved the project.[4] It is awaiting ratification from Chile.
In 2018, the bidding contest for the tunnel project between construction companies took place. The whole project was budgeted at 1.5 billion dollars.[5]
Also planned for the deepest part of the tunnel is the Agua Negra Deep Experiment Site (ANDES) (ANDES):[6] an underground laboratory. Because all currently operating deep underground laboratories are located in the Northern Hemisphere, a Southern Hemisphere site would have some unique benefits:
- Combined with existing neutrino detectors, a longer baseline would allow more accurate localization of sources in neutrino astronomy, and
- When searching for dark matter, there is expected to be a seasonal variation due to the Earth's motion around the Sun. But such a signal could also be an error, caused by some subtle seasonal effect. Confirmation from a location with opposite seasons would rule out such an error.
ANDES is not expected to be ready before 2027.[7]
See also
Notes and References
- Web site: PASO INTERNACIONAL "SAN FRANCISCO". gendarmeria.gob.ar. Gendarmeria Nacional Argentina. 26 February 2015. https://web.archive.org/web/20150227013326/http://www.gendarmeria.gob.ar/pasos-chile/agua-negra.html. 2015-02-27. dead.
- News: Andes link a priority for Chile-Argentina-Brazil . December 2011 . Peter . Kenyon . TunnelTalk . 2015-04-25.
- Web site: Agua Negra Tunnel . 2015-04-25.
- Web site: Argentina Approved Construction of Tunnel Agua Negra to Join Chile . March 23, 2015 . Latin American Association of Ports and Terminals . 2015-04-25.
- Web site: Agua Negra Tunnel - Verdict Traffic . 2023-12-01 . www.roadtraffic-technology.com.
- Web site: The ANDES laboratory: Proposed laboratory design . 2015-04-25.
- Ianni . Aldo . Status of Underground Labs . 27 July 2017 . XV International Conference on Topics in Astroparticle and Underground Physics (TAUP2017) . http://taup2017.snolab.ca/ . Sudbury, Canada . 2017-10-14.