Parsons Boulevard station explained

Parsons Blvd
Address:Parsons Boulevard & Hillside Avenue
Queens, NY
Borough:Queens
Locale:Jamaica
Coordinates:40.7077°N -73.8028°W
Division:IND
Line:IND Queens Boulevard Line
Service:Queens Hillside
Service Header:Queens Hillside header
Accessible:future
Platforms:2 island platforms
cross-platform interchange
Tracks:4
Structure:Underground

The Parsons Boulevard station is an express station on the IND Queens Boulevard Line of the New York City Subway. Located at the intersection of Parsons Boulevard and Hillside Avenue in Queens,[1] it is served by the F train at all times, the <F> train during rush hours in the reverse peak direction, and a few rush-hour E trains.

This station opened on April 24, 1937 as part of an extension of the Independent Subway System's Queens Boulevard Line, and served as a terminal for F trains until the line was extended to 179th Street in 1950. Ridership at this station decreased sharply after the opening of the Archer Avenue lines in 1988.

History

Construction

The Queens Boulevard Line was one of the first built by the city-owned Independent Subway System (IND), and was planned to stretch between the IND Eighth Avenue Line in Manhattan and 178th Street and Hillside Avenue in Jamaica, Queens.[2] [3] The line was first proposed in 1925.[4] Construction of the line was approved by the New York City Board of Estimate on October 4, 1928.[5] On December 23, 1930, the contract for the construction of the section between 137th Street (now the Van Wyck Expressway) and 178th Street—Route 108, Section 11—was let. This section included the stations at 169th Street, Parsons Boulevard, Sutphin Boulevard, and Briarwood.[6] As planned, Parsons Boulevard was to be an express stop, while the other three stations would be local stops.[7] The contract for this section was awarded to Triest Contracting Corporation.[8] The line was constructed using the cut-and-cover tunneling method, and to allow pedestrians to cross, temporary bridges were built over the trenches.[9]

The first section of the line opened on August 19, 1933 from the connection to the Eighth Avenue Line at 50th Street to Roosevelt Avenue in Jackson Heights.[10] Later that year, a $23 million loan was approved to finance the remainder of the line, along with other IND lines.[11] The remainder of the line was built by the Public Works Administration.[12] In summer 1933 work on this station and 169th Street were completed, far ahead of schedule.[8] In 1934 and 1935, construction of the extension to Jamaica was suspended for 15 months and was halted by strikes.[13] Construction was further delayed due to a strike in 1935, instigated by electricians opposing wages paid by the General Railway Signal Company.[14]

In April 1936, William Jerome Daly, the secretary of the New York City Board of Transportation, stated, in response to requests for a stop at 178th Street, that constructing a station at that location would prevent express service from operating past 71st Avenue. He said that with a final station at 169th Street, express trains could run to Parsons Boulevard, and that if the line was extended to Springfield Boulevard as planned, express service could be extended past 178th Street with a yard east of the new terminal.[15]

In August 1936, construction to Forest Hills was expected to be completed by the end of the year. While the tracks were installed all the way to 178th Street, the stops to the east of Union Turnpike still needed to be tiled, have stairways, turnstiles and lighting installed. Two additional contracts remained to be put up for bid, both the results of last minute changes. One of the changes concerned the line's eastern terminal. Initially, express trains were planned to terminate at a station at 178th Street. However, the plans were changed to terminate the express trains at Parsons Boulevard, requiring the installation of switches. Since construction of the tunnel was already completed in this section, a few hundred feet of the wall separating the eastbound and westbound train tracks had to be removed to fit the two switches.[16] In addition, a new tunnel roof and new side supports had to be constructed.[17] Since the line's new terminal would be at 169th Street, the tracks at 178th Street would be used to turn back trains. This change delayed the opening of the line from Union Turnpike to 169th Street, and also led to protests from the Jamaica Estates Association because the 178th Street station had been eliminated.

A 3.51NaN1 extension from Roosevelt Avenue to Kew Gardens opened on December 31, 1936.[18] In March 1937, the extension to 169th Street was expected to be opened on May 1, requiring work to be finished by April 3, and fully approved and tested by April 20. As of this point, minor station work remained, including the installation of light bulbs, with the only major work left to be completed being the final 200feet of track in the 169th Street terminal.[17]

Opening

On April 9, 1937, Mayor Fiorello La Guardia announced that the operation of the $14.4 million extension to Jamaica and express service would begin on April 24.[19] [20] The extension to Hillside Avenue and 178th Street, with a terminal station at 169th Street, opened as planned on April 24, 1937.[21] [22] [23] Service was initially provided by E trains, which began making express stops from 71st–Continental Avenues to Queens Plaza during rush hours on the same date, and by EE local trains during non-rush hours. The express service operated between approximately 6:30 and 10:30 a.m. and from 3:00 p.m. to 7:00 p.m.,[24] and ran every three to five minutes.[25] This extension was celebrated with a ribbon-cutting ceremony at the Parsons Boulevard station and with a parade along Hillside Avenue.[26]

On December 15, 1940, trains began running via the newly opened IND Sixth Avenue Line, also running express west of 71st Avenue. 169th Street and Parsons Boulevard were both used as terminal stations during this time, with the E terminating at 169th Street and the F at this station.[27] This setup was instituted to prevent congestion at both stations.

While 169th Street was the end of the line, F trains terminated at Parsons Boulevard because the 169th Street station provided an unsatisfactory terminal setup for a four-track line. There were no storage facilities provided at the 169th Street station, and since 169th Street was a local station, trains on the outer local tracks had to cross over to the inner express tracks to reverse direction. Therefore, the line was planned to be extended to 184th Place with a station at 179th Street containing two island platforms, sufficient entrances and exits, and storage for four ten-car trains. The facilities would allow for the operation of express and local service to the station.[28] Delayed due to the Great Depression and World War II, the extension was completed later than expected and opened on December 11, 1950.[29] [30] E trains were extended there at all times and F trains were extended evenings, nights, and Sunday mornings.[31] On May 13, 1951, all F trains outside of rush hour were extended to 179th Street using the local tracks beyond Parsons Boulevard. On October 8, 1951, trains were extended to 179th Street at all times.[32] During rush hours F trains skipped 169th Street running via the express tracks. At other times, the F stopped at 169th Street.[33]

In 1953, the platforms at several IND stations were lengthened to allow eleven-car trains; originally, service was provided with ten-car trains. The lengthened trains began running during rush hour on September 8, 1953. Eleven-car trains would only operate on weekdays.[34] The extra car increased the total carrying capacity by 4,000 passengers.[35] The operation of eleven-car trains ended in 1958 because of operational difficulties. The signal blocks, especially in Manhattan, were too short to accommodate the longer trains, and the motormen had a very small margin of error to properly platform the train. It was found that operating ten-car trains allowed for two additional trains per hour to be scheduled.[36]

Changes

In 1976, Hillcrest High School students painted 12 murals in the station.[37] In the 1980s, this station was part of the Metropolitan Transportation Authority (MTA)'s Neighborhood Adopt-A-Station Program. According to a sign on the wall, the Parsons Boulevard station was adopted by students of Hillcrest High School.[38] Additionally, in 1983, improvements to the Parsons Boulevard station were scheduled as part of an MTA improvement program.[39]

Ridership at this station decreased following the opening of the parallel Archer Avenue lines on December 11, 1988,[40] which was expected to severely lessen congestion at the Sutphin Boulevard, Parsons Boulevard, and 169th Street stations. Ridership checks conducted before and after the opening of the new line showed that ridership at this station, between 5 and 10 a.m. on weekdays, decreased from 10,457 riders to 5,183 riders, a 50% decrease.[41]

In conjunction with the opening of the Archer Avenue lines, service patterns were changed. E trains were rerouted via the new line, running to Jamaica Center, via the Queens Boulevard Line's express tracks, and began running express east of 71st Avenue.[42] [43] However, some E trains continued to run from 179th Street as expresses during the morning rush hour, stopping at Parsons Boulevard.[44] Service at local stations, such as Sutphin Boulevard, was replaced by the R, which was extended to 179th Street from 71st Avenue. The R extension allowed F trains to continue running express to 179th Street.[45] [46] The changes in subway service angered riders at local stations east of 71st Avenue because they lost direct Queens Boulevard Express service. Local elected officials pressured the MTA to eliminate all-local service at these stations.[47] On September 30, 1990, the R was cut back to 71st Avenue outside of rush hours. Local service to 179th Street was replaced by F trains, which provided Queens Boulevard Express service, during middays, evenings, and weekends, and local G service during late nights.[48] In 1992, the MTA decided to have F trains run local east of 71st Avenue on a six-month trial basis to replace R service, which would be cut back to 71st Avenue at all times.[49] The test started on October 26, 1992 and was implemented on a permanent basis six months later, eliminating express service along Hillside Avenue.[50] [47]

In 2003, MTA proposed closing 177 part-time token booths, later reduced to 62,[51] across the subway system and replace them with MetroCard Vending Machines and High-Entry/Exit Turnstiles to help cut the MTA's $1 billion deficit. The closure of booths began in August 2003.[52] The station's part-time token booth, which was staffed for hours on weekdays, at 153rd Street was closed on August 17, 2003,[53] and automatic entrance to the 153rd Street exits was provided at all times. Access hours at these entrances were previously 6:15 a.m. to 10:40 p.m.[54] [55]

Under the 2015–2019 MTA Capital Program, the station, along with thirty other New York City Subway stations, were scheduled to undergo a complete overhaul and would have been entirely closed for up to 6 months. Updates would have included cellular service, Wi-Fi, charging stations, improved signage, and improved station lighting.[56] [57] However, these renovations are being deferred until the 2020 - 2024 Capital Program due to a lack of funding.[58] In December 2019, the MTA announced that this station would become ADA-accessible as part of the agency's 2020–2024 Capital Program.[59] The accessibility project was to be funded by congestion pricing in New York City, but it was postponed in June 2024 after the implementation of congestion pricing was delayed.[60]

Station layout

GroundStreet levelExit/Entrance
MezzanineFare control, station agent, MetroCard vending machines
Platform levelSouthbound local← toward
Island platform, doors will open on the left, right
Southbound express← toward (select rush hour trips)
Northbound express toward (select rush hour trips) (Terminus)
Island platform, doors will open on the left, right
Northbound local toward (two p.m. rush hour trips)
toward
This underground station has four tracks and two island platforms.[61] F trains stop on the outer local tracks at all times, while infrequent rush hour E trains stop on the center express tracks (four southbound and three northbound during the AM rush, and three southbound and four northbound during the PM rush).[62] For local trains, the station is between Sutphin Boulevard to the west and 169th Street to the east. For express trains, the station is between Kew Gardens–Union Turnpike to the west and Jamaica–179th Street to the east.

The platform and mezzanine columns are I-beams painted maroon-red and the wall tiles along the tracks have a vermilion trim-line with a black border and name tiles underneath them consisting of "PARSONS" in white lettering on a black background.[63] [64] The tile band is part of a color-coded tile system used throughout the IND.[65] The tile colors were designed to facilitate navigation for travelers going away from Lower Manhattan. As such, a different tile color was originally used at, the next express station to the east. The red tiles used at the Parsons Boulevard station were also used at, the only local station between Parsons Boulevard and 179th Street.[66] [67] Some of the black columns separating the express tracks have white signs reading "Parsons" in black lettering.[68] There is a usually unstaffed signal tower on the southern end of the Manhattan-bound platform.[69]

Above the platforms is a full-length mezzanine that connects the two station entrances at either end.[61] It allows free crossovers between directions,[70] and has more staircases to the Jamaica-bound platform than the Manhattan-bound one because a crew office was built on the Manhattan-bound side.[71] A free passageway, which allows people to walk through the mezzanine without having to pay a fare, connects the entrances at 153rd Street and Parsons Boulevard.[72] At the Parsons Boulevard end of the station, there is a fenced off storage area.[73] A pump station for draining water after floods is located at the geographical west end of the station at 153rd Street.[74]

Exits

The main entrance is at the north end of the station. It has a turnstile bank and a full-time token booth,[75] which had seven regular turnstiles .[61] Two street stairs lead to either southern corner of Parsons Boulevard and Hillside Avenue, and a single staircase to the northwest corner. This entrance formerly was the station's full-time entrance.[76]

The entrance at the south end is unstaffed; in 2007, it had three HEET turnstiles.[61] This fare array leads to three street stairs to the intersection of 153rd Street and Hillside Avenue–one each at the northern, southwest, and southeast corners of the intersection. The part-time token booth at 153rd Street was removed in 2003.

External links

Notes and References

  1. Web site: Parsons Boulevard Neighborhood Map. mta.info. Metropolitan Transportation Authority. August 26, 2019. April 2018.
  2. See:
  3. News: Queens Lauded as Best Boro By Chamber Chief. September 23, 1929. The Brooklyn Daily Eagle. October 4, 2015. 40.
  4. News: March 21, 1925. New Subway Routes in Hylan Program to Cost $186,046,000. en-US. 1. The New York Times. March 27, 2020. 0362-4331.
  5. News: $17,146,500 Voted For New Subways; Estimate Board Appropriates More Than $9,000,000 for Lines in Brooklyn. $6,490,000 For The Bronx Smaller Items for Incidental Work --Approves the Proposed Queens Boulevard Route. October 5, 1928. The New York Times. August 4, 2016. 0362-4331.
  6. News: 178th Street Subway Stop Now Assured. Place Is Designated for Station by Transportation Board.. December 1, 1930. Long Island Daily Press. April 25, 2019. 1.
  7. News: July 23, 1933 . 22 Stations On New Subway Into Queens: Five Are Designated Express Stops on Transit Route, Which Ends at Jamaica . H2 . New York Herald Tribune . 1941-0646 . .
  8. News: New Subway to Jamaica Ahead of Schedule Time. September 17, 1933. New York Daily News. September 12, 2019.
  9. Book: Forest Hills. Hirshon. Nicholas. Romano. Foreword by Ray. January 1, 2013. Arcadia Publishing. 978-0-7385-9785-0. en.
  10. News: August 19, 1933. Two Subway Links Opened In Queens. 13. The New York Times. December 11, 2016. 0362-4331.
  11. News: Unfinished Sections of Subway Lines To Be Completed. December 13, 1933. The New York Sun. July 30, 2016. 47.
  12. News: Trains Testing Jamaica Link Of City Subway. April 10, 1937. The Brooklyn Daily Eagle. April 24, 2018. 3.
  13. News: Men Toil Under Earth to Build Subway. Neufeld. Ernest. August 23, 1936. Long Island Daily Press. August 12, 2016. 2 (Section 2).
  14. See:
  15. News: Last Jamaica Subway Stop May Be at 169th Street. Can't Have Expresses and Distance, Too, Official Says.. April 26, 1936. Long Island Sunday Press. April 25, 2019. 1.
  16. News: Men Toil Under Earth to Build Subway. Neufeld. Ernest. August 23, 1936. Long Island Daily Press. August 12, 2016. 2 (Section 2).
  17. News: Two Crews Rush to Finish Last 200 Feet of Subwav: Work Must End April 3 to Allow Time for Tests. March 19, 1937. Long Island Daily Press. April 25, 2019. 1.
  18. News: December 31, 1936. City Subway Opens Queens Link Today. 3. The New York Times. April 26, 2016. 0362-4331.
  19. News: April 10, 1937 . Jamaica Ready For Opening of Subway April 24: Mayor Announcers Program Including Official Trip, Luncheon and a Parade . 13 . New York Herald Tribune . 1941-0646 . .
  20. Book: Kramer, Frederick A.. Building the Independent Subway. 1990. Quadrant Press. 978-0-915276-50-9. en.
  21. News: New Subway Link to Jamaica Opened; La Guardia, City Officials and Civic Groups Make Trial Run on 10-Car Train. April 25, 1937. The New York Times. 0362-4331. March 8, 2019.
  22. News: April 25, 1937 . Jamaica Linked To City Subway With Ceremony: LaGuardia Assures 2,000 Queens Celebrants 'We'll Build More,' if Funds Hold Express Service Begun Official Inspection Held as Civic Groups Parade . 13 . New York Herald Tribune . 1941-0646 . .
  23. News: Jamaica Will Greet Subway. April 23, 1937. The New York Sun. April 24, 2018. 8.
  24. News: Transit Link Open Today; 8th Ave. Line Extended to Jamaica—Celebration Arranged. April 24, 1937. The New York Times. August 4, 2016. 0362-4331.
  25. News: LaGuardia Heads Speakers Marking Subway Opening Ceremonies Planned Saturday Celebrating Hillside Avenue Extension. April 23, 2017. North Shore Daily Journal. November 19, 2017. 3.
  26. See:
  27. Book: Report including analysis of operations of the New York City transit system for five years, ended June 30, 1945. Board of Transportation of the City of New York. 1945. New York City. 2027/mdp.39015020928621.
  28. News: Subway Link Opens Monday. December 6, 1950. The New York Times. 0362-4331. June 30, 2015.
  29. See:
  30. See:
  31. News: All 'F' Trains Will Run to 179 Street. October 4, 1951. Long Island Star-Journal. August 12, 2016. Fultonhistory.com. 1.
  32. News: Queens Subway Changes: Parsons Boulevard, 179th Street Stations Are Accepted. October 4, 1951. New York Times. January 25, 2016.
  33. Book: Report. 1953. New York City Transit Authority. en.
  34. News: 2 Subway Lines to Add Cars, Another to Speed Up Service. Ingalls. Leonard. August 28, 1953. The New York Times. January 25, 2016. 0362-4331.
  35. News: 16-Point Plan Can Give Boro Relief Now. August 10, 1962. Long Island Star–Journal. April 24, 2018.
  36. News: 12 Murals to Decorate Parsons Blvd. Station. October 29, 1976. The New York Times. December 25, 2019. en-US. 0362-4331.
  37. Web site: An old adopt a station sign for the Hillcrest High School for cleaning I suppose, don't think this program still exists. Cox. Jeremiah. January 3, 2012. subwaynut.com. August 26, 2019.
  38. News: M.t.a. Making Major Addition to Capital Plan. Goldman. Ari L.. April 28, 1983. The New York Times. December 25, 2019. en-US. 0362-4331.
  39. News: Big Changes For Subways Are to Begin. Johnson. Kirk. December 9, 1988. The New York Times. July 5, 2009. 0362-4331.
  40. See:
  41. News: Big Changes For Subways Are to Begin. Johnson. Kirk. December 9, 1988. The New York Times. June 6, 2016. 0362-4331.
  42. Book: Alternatives Analysis/Supplemental Draft Environmental Impact Statement for the Queens Subway Options Study. May 1990. United States Department of Transportation, Metropolitan Transportation Authority, Urban Mass Transit Administration. August 13, 2016.
  43. Archer Avenue Corridor Transit Service Proposal. New York City Transit Authority, Operations Planning Department. August 1988.
  44. News: New Subway Line Finally Rolling Through Queens. Polsky. Carol. December 11, 1988. Newsday.
  45. 1988. Archer Avenue Extension Opens December 11. Welcome Aboard: Newsletter of the New York City Transit Authority. New York City Transit Authority. 1. 4. 1.
  46. Web site: Service Change Monitoring Report Six Month Evaluation of F/R Queens Boulevard Line Route Restructure. April 1993. www.laguardiawagnerarchive.lagcc.cuny.edu. Metropolitan Transportation Authority. December 28, 2018.
  47. Web site: Service Changes September 30, 1990. September 30, 1990. subwaynut.com. New York City Transit Authority. May 1, 2016. October 26, 2014. https://web.archive.org/web/20141026015324/http://www.subwaynut.com/brochures/1990servicechanges.pdf. dead.
  48. Web site: Van Wyck Blvd Station. May 1992. www.laguardiawagnerarchive.lagcc.cuny.edu. Metropolitan Transportation Authority. December 28, 2018.
  49. Web site: October 1992 New York City Subway Map. October 1992. Flickr. New York City Transit Authority. October 30, 2016.
  50. Web site: An Examination of the Finances of the Metropolitan Transportation Authority April 2003. April 2003. Office of the State Deputy Comptroller for the City of New York. 35. August 26, 2019.
  51. News: Closing of token booths draws near for borough. Newman. Philip. August 6, 2003. Queens Courier. August 26, 2019.
  52. News: MTA to close token booths at 9 boro sites. Newman. Philip. August 13, 2003. Queens Courier. August 26, 2019.
  53. Web site: Token Booth Closings. Markowitz. Michael. February 24, 2003. Gotham Gazette. August 26, 2019.
  54. Web site: Parsons Boulevard Token Booth Closure. 2003. mta.info. https://web.archive.org/web/20030518043903/http://www.mta.info/nyct/booths/pdf/queens/parsons_f.pdf. May 18, 2003. dead. August 26, 2019.
  55. Web site: MTA Will Completely Close 30 Subway Stations For Months-Long "Revamp". Whitford. Emma. January 8, 2016. Gothamist. July 18, 2016. dead. https://web.archive.org/web/20160801200338/http://gothamist.com/2016/01/08/subway_facelift_shutdown.php. August 1, 2016.
  56. Web site: MTAStations. governor.ny.gov. Government of the State of New York. July 18, 2016.
  57. News: New York Subway Cuts Back Plans to Renovate Stations. Berger. Paul. April 3, 2018. Wall Street Journal. April 3, 2018. en-US. 0099-9660.
  58. Web site: Press Release - MTA Headquarters - MTA Announces 20 Additional Subway Stations to Receive Accessibility Improvements Under Proposed 2020-2024 Capital Plan. December 19, 2019. MTA. December 20, 2019. April 21, 2020. https://web.archive.org/web/20200421204344/http://www.mta.info/press-release/mta-headquarters/mta-announces-20-additional-subway-stations-receive-accessibility. dead.
  59. News: Collins. Keith. July 11, 2024. See How Your Subway Service May Suffer Without Congestion Pricing. July 12, 2024. The New York Times. en-US. 0362-4331.
  60. Book: Jamaica Rezoning Final Environmental Impact Statement . . 17.4 . Chapter 17: Transit and Pedestrians . April 1, 2021 . 2007.
  61. Web site: A limited rush hour service E train stopped on the express track beneath its sign. Cox. Jeremiah. January 3, 2012. subwaynut.com. August 15, 2017. August 15, 2017. https://web.archive.org/web/20170815180213/http://www.subwaynut.com/ind/parsonsf/parsonsf44.jpg. dead.
  62. Web site: A close up of the 'parsons' text on a column at Parsons Blvd.. Cox. Jeremiah. June 2, 2008. subwaynut.com. August 15, 2017. March 9, 2016. https://web.archive.org/web/20160309185356/http://www.subwaynut.com/ind/parsonsf/parsonsf6.jpg. dead.
  63. Web site: The orange wall trim that's three tiles wide and the 1/2 tile black border with Parsons letting one full tile below it along the local track walls at Parsons Blvd.. Cox. Jeremiah. June 2, 2008. subwaynut.com. August 15, 2017. March 9, 2016. https://web.archive.org/web/20160309181413/http://www.subwaynut.com/ind/parsonsf/parsonsf8.jpg. dead.
  64. News: August 22, 1932 . Tile Colors a Guide in the New Subway; Decoration Scheme Changes at Each Express Stop to Tell Riders Where They Are . en-US . The New York Times . live . July 1, 2022 . https://web.archive.org/web/20220701184626/https://www.nytimes.com/1932/08/22/archives/tile-colors-a-guide-in-the-new-subway-decoration-scheme-changes-at.html . July 1, 2022 . 0362-4331.
  65. Web site: Carlson . Jen . Map: These Color Tiles In The Subway System Used To Mean Something . Gothamist . February 18, 2016 . May 10, 2023.
  66. Web site: Gleason . Will . The hidden meaning behind the New York subway's colored tiles . Time Out New York . February 18, 2016 . May 10, 2023.
  67. Web site: Original, now very dirty, black lettering on a white background 'Parsons' signs are still intact along the columns between the express tracks.. Cox. Jeremiah. June 2, 2008. subwaynut.com. August 26, 2019.
  68. Web site: Looking down towards the very end of the Jamaica-bound platform at Parsons Blvd.. Cox. Jeremiah. February 9, 2004. subwaynut.com. August 26, 2019.
  69. Web site: A view down the mezzanine to the HEET exit to 153 Street at Parsons Blvd.. Cox. Jeremiah. June 2, 2008. subwaynut.com. August 26, 2019.
  70. Web site: This non-public area has been built in a portion of the middle of the mezzanine. Cox. Jeremiah. January 3, 2012. subwaynut.com. August 26, 2019.
  71. Web site: The long out of fare control passageway to the 24 hour booth. Cox. Jeremiah. January 3, 2012. subwaynut.com. August 26, 2019.
  72. Web site: There is a fenced off storage area at the Parson's Blvd end of the mezzanine. Cox. Jeremiah. January 3, 2012. subwaynut.com. August 26, 2019.
  73. Web site: August 8, 2007 Storm Report. Metropolitan Transportation Authority. September 20, 2007. October 27, 2007 . dead. https://web.archive.org/web/20071029025238/http://mta.info/mta/pdf/storm_report_2007.pdf . October 29, 2007.
  74. Web site: The one station token booth, the mezzanine is so wide it is just plopped in the middle of it. Cox. Jeremiah. January 3, 2012. subwaynut.com. August 26, 2019.
  75. Web site: Exit to 153 St or the 24 hour booth, an old Standard font sign. Cox. Jeremiah. January 3, 2012. subwaynut.com. August 26, 2019.