Parramatta Light Rail Explained

Parramatta Light Rail
Color:EE1F35
Status:Under construction
Start:Westmead
End:
Stations:16 (stage 1)
Routes:2
Planopen:2024 (stage 1)
Owner:Transport for NSW
Operator:Transdev Australasia
Depot:Camellia
Stock:13 Urbos 100
Website:www.parramattalightrail.nsw.gov.au
Map:[{ "type": "ExternalData", "service": "page", "title": "Parramatta Light Rail stage 2.map" }, { "type": "ExternalData", "service": "page", "title": "Parramatta Light Rail.map" } ]

The Parramatta Light Rail is a 120NaN0 standard gauge light rail line currently under construction in Sydney, New South Wales, Australia.

The first stage of the line will run from Westmead to Carlingford via the Western Sydney centre of Parramatta. Construction commenced in 2019, with the first stage due to start passenger services in mid-2024. In July 2024, it was officially announced that services running on the first stage will be running as the L4 Westmead & Carlingford Line.

A second stage is planned for a branch from Camellia or Rydalmere to Sydney Olympic Park. Construction of stage two is expected to commence in 2024.

The line is physically completely separate from the rest of the Sydney light rail network. It is being managed by Transport for NSW.

Background

Parramatta - Duck River tramway

Between 1883 and 1943, a tramway, operated by Sydney Ferries Limited, travelled from the Parramatta Park end of George Street to the mouth of the Duck River,[1] where it originally connected with the company's Parramatta River ferry services to Sydney CBD.[2] [3] [4] The connecting ferries ceased in 1928; the line then primarily carried freight until it closed in March 1943.[5] [6] [7] Part of the Parramatta Light Rail will run via a very similar route including via Tramway Avenue in Parramatta, named after the original line.

Rogans Hill Tramway

See main article: article and Rogans Hill railway line. The Rogans Hill railway (originally a steam tramway) was a short-lived railway line in Parramatta. Upon its opening in 1902, it ran between Parramatta and Baulkham Hills and was later extended to Castle Hill in 1910.[8] After a decision by the NSW Government in 1919 to convert the line into a railway, the tramway was relaunched in 1923 as such with the final extension to Rogans Hill opening in 1924.[9] However, the line was never successful after its conversion into a railway due to competition with cars and buses on Old Windsor Road (which ran parallel to it) and as a result it closed in 1932.[10] During the feasibility study for the Parramatta Light Rail in 2013, the route of the old Rogans Hill railway line was investigated as a possible corridor for the new light rail.

Route investigation

In 2013, Parramatta City Council published a $1 million feasibility study into a proposed Western Sydney Light Rail Network, designed to improve transport links throughout Western Sydney and meet the challenges posed by the projected rise in population in the region in the coming decades. The study found that a light rail system was a viable solution to address the growing transport needs of Parramatta and Western Sydney. The report estimated $20 million in funding was required to undertake a detailed investigation and to prepare a business case.[11] It proposed that construction of the network would take place in several stages, the first of which comprised a route from Macquarie Centre to Castle Hill via Eastwood, Dundas, Parramatta and Baulkham Hills, with a branch from Parramatta to Westmead. Further extensions were proposed from Parramatta to Bankstown and Rhodes.

As part of its 2014/15 budget, the New South Wales Government announced Transport for NSW would investigate ten potential light rail routes in Western Sydney. The government allocated $400 million to ensure funds for detailed planning and construction of an initial project would be 'ready to go', should the investigations prove favourable.[12] Six of the ten routes being investigated were eliminated from contention in October 2014.[13] The routes investigated were:

Route Status Notes
Not selected
Parramatta to Castle Hill via Old Northern Road Not selected
Eliminated in October 2014 Based on the route proposed by Parramatta City Council. Old alignment of the Rogans Hill railway line
Eliminated in October 2014
Parramatta - Carlingford section selected
Eliminated in October 2014 Based on the route proposed by Parramatta City Council
Strathfield option selected Route extended from Sydney Olympic Park to Strathfield/Burwood in October 2014
Eliminated in October 2014
Eliminated in October 2014
Eliminated in October 2014

Of the final four routes, the Macquarie Park via Carlingford and the Strathfield via Olympic Park options were perceived as the frontrunners to be selected.[14] The Macquarie Park route was supported by Parramatta, Ryde and The Hills councils.[15] [16] [17] The Strathfield route was supported by The WestLine Partnership, a lobby group consisting of businesses and organisations with a presence in the area.[18] Auburn and Canada Bay councils were later joined by Strathfield Council as members of the group.[19] [20]

The Strathfield route passes through industrial areas of Sydney and the potential for these areas to generate funding and patronage was a key point of contention during the lobbying period. The WestLine Partnership suggested the Strathfield route could be partially financed via value capture. Property developers building urban renewal projects along the line would provide a financial contribution to the government.[21] The group also suggested building a branch from Newington to Rhodes and indicated its funding model could allow a route to Carlingford to be built as well.[22] Supporters of the Macquarie Park route argued the needs of that corridor were more pressing and the Strathfield route would be poorly utilised in its early years.[23] [24]

Official announcement

The Parramatta Light Rail scheme was officially unveiled on 8 December 2015, when the government announced it had selected the Strathfield route plus a truncated version of the Macquarie Park route that ends at Carlingford.[25] The two routes were proposed to converge at Camellia and proceed through Parramatta to Westmead.

The government's announcement included a $1 billion contribution towards the project. The government will also adopt the value capture approach advocated by The WestLine Partnership, by instigating an infrastructure contribution on new residential developments along the route. The revenue raised by the levy will be used to help fund the light rail and other infrastructure for the area. The government's investigations into the value capture process held up the announcement of the preferred route but would reportedly have allowed the two lines to be built together. The state government will also explore funding contributions from the federal and local tiers of government. The convenor of the partnership stated that the light rail project's funding model would be used as a test case for funding future infrastructure projects.

Construction of the lines was expected to commence in late 2018 but there was no announcement of an expected completion date or a total budget for the project.[26] [27] An early estimate from January 2016 put the total cost at $3.51 billion.[28]

Deferral and redesign of the eastern branch

In August 2016, Transport for NSW noted the project could be delivered in stages.[29] A new metro line between the Sydney central business district and Parramatta was announced in November 2016.[30] The metro would adopt a similar route to the Strathfield branch of the light rail; media reports indicated the metro project would most likely cause the deferral of construction of this branch.[31] This was confirmed in February 2017, when it was announced that the Westmead - Camellia section and the Carlingford branch would be built as stage 1 of the light rail project.

Despite the deferral of construction, planning work for the Strathfield via Sydney Olympic Park branch continued. Media reports from 2017 indicated the route could shift from running to the south of the Parramatta River to the north of the river and that the section from Sydney Olympic Park to Strathfield could be dropped.[32]

The preferred stage 2 route was announced in October 2017. The changes reported on by the media were confirmed. The redesigned route runs from either Rydalmere or Camellia to Sydney Olympic Park via Ermington, Melrose Park and Wentworth Point. No details about the project's cost or construction dates were announced.

In November 2020, it was reported that the block of land at Camellia, bought by the NSW government for $53.5 million for the stabling and maintenance depot, was effectively worthless because of high levels of soil contamination.[33] [34] The purchase was referred to the Independent Commission Against Corruption (ICAC) because an internal investigation by the NSW transport department found the purchase of the land, for three times what the Valuer-General estimated it was worth, broke basic rules, and the land was bought from a developer without a valuation. The developer had bought the six-hectare parcel of land only months before, for $38 million.[35]

In 2022, it was reported that it would take until 2031 to open stage 2 for passenger operations, 5 years longer than originally planned.[36]

In February 2024, stage 2 of the Parramatta Light Rail was approved by the New South Wales Government, with the 2023-24 state budget committing $200 million to the project.[37]

Design

The routes will begin at Westmead before proceeding east to Camellia or Rydalmere via North Parramatta and the Parramatta CBD. At Camellia/Rydalmere the two routes split. The stage 1 route goes north to Carlingford, while the stage 2 route continues east to Sydney Olympic Park.

Stage 1 - Parramatta and branch to Carlingford

The stage 1 route was announced on 17 February 2017. The stage 1 route runs between Westmead and Carlingford via North Parramatta, the Parramatta CBD, Camellia, Rydalmere, Dundas and Telopea. It includes sixteen stops along a 12km (07miles) route. It includes two wire-free sections—one between Westmead and Cumberland Hospital—and another between Prince Alfred Square and Tramway Avenue. The maintenance and stabling facility will be located east of Rosehill Racecourse. Trams will access the facility via a short branch line that uses the alignment of the Sandown railway line.[38] [39] Extension from Carlingford to Epping is under study.[40]

The Environmental Impact Statement for stage 1 was released in August 2017.[41] Planning approval was granted in May 2018.[42] The stops are, from west to east:[43] [44]

Westmead - Westmead light rail stop will be the western terminus of both lines of the Parramatta Light Rail. Located on Hawkesbury Road in the suburb of Westmead, the stop will consist of one island platform (two platforms) and one side platform, adding up to a total of 3 platforms. Located on the intersection with Railway Parade,[45] its close location relative to Westmead Railway Station will enable quick transfers with Sydney Trains at Westmead railway station and future Sydney Metro West.[46] This stop also contains one of the 7 traction power substations that serve the line.[47]

Westmead Hospital - Also located in the suburb of Westmead, this station will be located north of the intersection of Caroline Street. It will consist of 2 side platforms and serve Westmead Hospital.

Childrens Hospital, previously the Children's Hospital at Westmead, this station is an island-platform station along Hainsworth Street which will serve the Westmead Children's Hospital. During the naming process of the station, the Darug word for infant, 'Gurung', was proposed but rejected.

Ngara, previously called Cumberland Hospital station, got its name from the Darug word meaning "To listen, to hear, think".[48] The station consists of two side platforms and will serve Cumberland Hospital. Ngara station is located on Factory Street, in the suburb of North Parramatta.

Benaud Oval, formerly Factory Street, is named after the nearby Richie Benaud Oval which the station also serves. Consisting of two side platforms, it is located on the corner of Factory Street and Church Street in North Parramatta and contains the second of the power substations.[47]

Fennell Street consists of two side-platforms on the corner of Fennell Street and Church Street in the suburb of Parramatta. Prince Alfred Square is located on Church Street adjacent to its namesake in the suburb of Parramatta. The last stop before the line enters the Parramatta CBD over the Parramatta River. When opened, it will serve the Western Sydney Stadium and consist of 2 side platforms.

Church Street, formerly Eat Street, is a light rail stop that will serve the newly-pedestrianised section of Church Street in the Parramatta CBD. It will consist of two side platforms; most of the street excluding the station were opened in late 2021.[49]

Parramatta Square is the second stop within Parramatta CBD. Consisting of two side platforms, when opened Parramatta Square station will be between Parramatta railway station and the future Parramatta metro station[50] and will be directly connected to both by Civic Link.[51] Parramatta Square station contains another traction substation.

Robin Thomas, called Harris Street during planning, is a two side-platform station located at the intersection between Macquarie Street and Harris Street in Parramatta. It is located directly before the light rail line takes two sharp 90 degree turns onto Harris, then George Street. Named after nearby Robin Thomas Reserve.[52]

Tramway Avenue is located after the second pair of adjacent 90 degree turns on the line. This stop is located on its namesake street. After this station, the street-running section ends at Bidgee Bidgee bridge (formerly James Ruse Drive Bridge), named after an Indigenous tribal leader. Tramway Avenue station is also where the 5.7 km (3.5 mi) long shared path (formally called the Carlingford Light Rail Active Transport Link) to Carlingford begins,[53] and is the location of the fourth power substation. Initially planned to have an island platform, the design was revised in 2018 to two side platforms.

Rosehill Gardens station (formerly Camellia station) is the first of the 5 stations on the Parramatta Light Rail Stage 1 line that were reused from the Carlingford railway line. The station consists of two side platforms and serves the nearby Rosehill Gardens Racecourse, which the station is named after. Just before Rosehill Gardens station, the line branches off towards the tram Stabling and Maintenance Facility[54] and the future Stage 2 line via a reused section of the Sandown Line.

Yallamundi, formerly Rydalmere Station, takes its name from a Darug word meaning storytelling. It is the second station reused from the Carlingford Line and consists of two side platforms on the site of the old station. Yallamundi station serves the nearby Western Sydney University (South Parramatta Campus) and the suburb of Rydalmere.

Dundas is the first of three old Carlingford Railway Line stations to retain its name, and the only one to retain its heritage-listed station building.[55] Located just south of Kissing Point Road, it consists of two side platforms and contains the second-last power substation and a backup operational control centre in case the maintenance facility malfunctions. The station serves the suburb of Dundas.Telopea consists of two side platforms and is the second station on the line to retain its old name. Serving the suburb of Telopea, it contains the last traction power substation on the line. Just after the station is the only single-track section on the entire system; the entirety of the original Carlingford railway line was single-track, and as a consequence the bridge above this section was built to accommodate only one, not two tracks. Since the road that runs above it is Pennant Hills Road, a 6 lane major arterial road, the bridge cannot be modified or removed.

Carlingford is the terminus of the Parramatta Light Rail Stage 1 route. The single track splits back into two just before the approach to the station, where they end in two side platforms. Carlingford station is also the terminus of the aforementioned Active Transport shared path and serves the suburb of Carlingford.

Stage 2 - Branch to Sydney Olympic Park

The second branch of the light rail continues east to Sydney Olympic Park.

There are two options being considered for the connection to the stage 1 route. The first option would utilise the Carlingford railway line (and stage 1) corridor over the Parramatta River to Rydalmere, where it would then branch. The second option would leave the main stage 1 route at Camellia and utilise the branch line built to provide access to the tram depot. It would continue via the Sandown railway line corridor and Grand Avenue, then cross the Parramatta River just east of Rydalmere ferry wharf. Both versions of the route then continue via Ermington and Melrose Park, cross back to the south of the Parramatta River, pass through Wentworth Point and terminate at Sydney Olympic Park. The stage 2 route is around nine kilometres (six miles) long and will include ten to twelve stops. The second option is shown as the planned route on the Parramatta Light Rail website.[56]

The original plans for this branch followed a route similar to that taken by Grand Avenue through Camellia before crossing the Duck River, passing through Newington, crossing Haslams Creek, serving Sydney Olympic Park and terminating at the major transport hub of Strathfield.

In 2024, the NSW Legislative Council Inquiry into Current and future public transport needs in Western Sydney recommended "that the Government urgently investigate extending Stage 2 of the Parramatta Light Rail project so that the line no longer terminates at the Carter Street precinct but continues from there to terminate at Lidcombe railway station".[57] This recommendation has been endorsed by Cumberland Council[58] and public transport advocacy groups such as EcoTransit Sydney.[59]

Construction

Stage 1

In November 2017, a CPB Contractors/Downer Group joint venture and John Holland were shortlisted to build stage 1. At the same time, three consortia were shortlisted to supply the rolling stock, maintain the infrastructure and operate the services:[60] [61]

The winning bidders were announced in December 2018. The CPB/Downer joint venture will build the majority of the infrastructure, while Great River City Light Rail will build the depot, light rail stops and power systems, supply the vehicles, the signalling systems and operate the network. The total budget for stage 1 is 2.4 billion.[62] [63]

Construction began in 2018,[64] with the line expected to open in 2024.[65]

In July 2018, work commenced on site remediation at the Camelia depot site.[66] Major construction was originally planned to start in June 2020.[67] This was brought forward to January 2020 and the first sod was turned on 31 January 2020.[68] [69]

Micro tunnelling will be used to build drainage and stormwater capacity underneath Church Street, to minimise construction impacts and disruptions in comparison to traditional pipeline construction such as excavating above the ground.[70] The first micro-tunnel machine was launched in June 2020 from Centenary Square to Parramatta Town Hall and will connect to an existing pipe to extend stormwater capacity. A second micro-tunnel machine will also be launched from Centenary Square to Lennox Bridge to build drainage and stormwater capacity underneath Church Street.[71]

Major construction of Stage 1 commenced at Westmead in July 2020.[72]

Traffic changes

Traffic changes were implemented along and surrounding the light rail alignment as part of enabling works.[73]

Church Street

Church Street between Macquarie Street and Market Street became a pedestrian-only zone on 1 February 2020 prior to the start of major construction in June that year. This included "Eat Street", a section of Church Street between George Street and Lennox Bridge where restaurants and outdoor tables and seating are located. The NSW government previously stated that work on 'Eat Street' would not start until 2020.[74] [75] [76] During construction, outdoor dining infrastructure along "Eat Street" would be removed and construction hoarding would be erected. The initial plan was, between 1 November to 31 January each year, 'Eat Street' would benefit from a construction 'grace period', when construction hoardings would be removed and outdoor tables and seating would be temporarily reintroduced.[77] This was to ensure that business owners, diners, tourists and shoppers do not experience constant construction works during the busy holiday season. However, after consulting with the Parramatta Light Rail Business Reference Group and Eat Street businesses, the plan was changed to 'fast tracking' the works during the initial grace period and delaying the grace period.[78] This would allow major construction to be completed earlier (scheduled on August 2021), followed by a delayed grace period, before installation of stops, testing and commissioning begins.[79] The "Eat Street" reopened to outdoor dining in October 2021 following the lifting of COVID-19 lockdown restrictions.[80]

Church Street between Barney Street and Victoria Road was closed to traffic on 3 July 2020.[81] Bus services along Church Street were redirected to travel along O'Connell Street.

George Street

On 29 November 2019, George Street between O'Connell Street and Harris/Macarthur Street was converted from the existing one-way eastbound configuration into two-way traffic.[82] The parking and the travel lanes along the southern side of George Street were temporarily removed one week prior, to allow eastbound motorists to get used to travelling on the northern side of George Street. The conversion of George Street to two-way traffic is to offset the loss of westbound lanes on Macquarie Street, which is along the light rail alignment.

O'Connell Street

In June 2020, works to widen O'Connell Street to four lanes between Barney Street and Albert Street were completed.[83] The intersection of O'Connell Street and Barney Street was also reconstructed to allow continuous flow between both roads.

Bus service changes

After Church Street closed on 1 February 2020, the Parramatta free shuttle service 900 ran on a modified route, running along George Street instead of Macquarie Street.[84]

Railway line closures

Carlingford and Sandown railway lines. The section of the Carlingford line to be converted to light rail is highlighted.">[{ "type": "ExternalData", "service": "page", "title": "Carlingford line conversion to light rail - shaded.map" }, { "type": "ExternalData", "service": "page", "title":"Sandown railway line.map" }, { "type": "ExternalData", "service": "page", "title": "T6 Carlingford Line.map" } ]The northern branch to Carlingford will reuse most of the Carlingford railway line, which closed on 5 January 2020.[85] The closure included Rosehill railway station, located between Clyde and Camellia, which will not be served by the light rail project.[86] [87] The level crossing across Parramatta Road was also removed later that month.[88]

The Carlingford line was single track for most of its length, had shorter platforms than other lines in Sydney and had long been seen as under-utilised. Patronage declined from 446,000 journeys in 2001 to 260,000 journeys in 2014.[89] 2016-17 patronage figures based on Opal card tap on and off data recorded 511,000 journeys on the line during the year. This placed the line last among all train lines in the Opal network.[90] Various modification schemes to revitalise the line had been proposed. Action for Transport 2010, a New South Wales Government plan released in 1998, included the Parramatta Rail Link; a heavy rail line from Parramatta to Chatswood that would have utilised the Carlingford line between Camellia and Carlingford. As part of the CityRail Clearways Project announced in 2004, a passing loop was to have been built at Rydalmere, enabling a more frequent service.[91] [92] Neither scheme came to fruition.

The Sandown railway line was officially closed in June 2019 and removal of the line and tracks began in July 2019.[93] This 1.5 kilometre line diverged from the Carlingford line at Camellia and ran close to the southern bank of the Parramatta River. Passenger services had ceased in December 1991, though the line's Rosehill platform remained in use for special charters, while freight trains ceased in June 2010 when trains from the Clyde Refinery last ran.[94] [95] [96] The western end of the Sandown line will be used by the light rail to provide access to a tram stabling and maintenance facility.

Operation

When operations begin, Transdev will operate the network for eight years, with a possible extension of up to an additional ten years.[97]

A document produced by Transport for NSW in February 2017 stated services would operate every 7.5 minutes throughout the day. However, a press release from December 2018 said services would operate every 7.5 minutes during peak periods, with frequencies at other times left unspecified.

Westmead & Carlingford Line, numbered L4, is the service name of the stage 1 route.[98]

Fleet

Stage 1 will be operated by a fleet of thirteen Urbos 100 built by Construcciones y Auxiliar de Ferrocarriles (CAF). Urbos 100 are also already in operation on the Inner West Light Rail in five module configuration. The Urbos 100 on the Parramatta Light Rail will instead operate in seven modules with a length of 45.5m (149.3feet), feature onboard batteries and in-ground charging.[99] [100]

External links

Notes and References

  1. Web site: Parramatta Trams Parramatta History and Heritage . 2024-01-28 . historyandheritage.cityofparramatta.nsw.gov.au . en.
  2. Web site: 2 October 1883 . The Parramatta Tram . live . https://web.archive.org/web/20160822132852/http://trove.nla.gov.au/newspaper/article/13555261 . 22 August 2016 . 14 July 2016 . The Sydney Morning Herald.
  3. Book: Dunn, John . Comeng: A History of Commonwealth Engineering Volume 1, 1921-1955 . Rosenberg Publishing . 2006 . 1877058424 . Kenthurst . 95.
  4. Book: Oakes, John . Sydney's Forgotten Industrial Railways . Australian Railway Historical Society . 2009 . 9780980510645 . Redfern . 29.
  5. Web site: 7 February 1928 . Parramatta Ferry to Terminate at Bridge: Company's Decision . live . https://web.archive.org/web/20171019220823/http://trove.nla.gov.au/newspaper/article/224219189 . 19 October 2017 . 7 June 2017 . The Sun.
  6. Web site: Hoskins . Ian . 2015 . River Cycles - A History of the Parramatta River . live . https://web.archive.org/web/20161022095701/http://dictionaryofsydney.org/entry/river_cycles_-_a_history_of_the_parramatta_river . 22 October 2016 . 7 June 2017 . Dictionary of Sydney.
  7. McCarthy . Ken . April 1973 . The Era of the Steam Tramway . live . . 14 No. 2 . 145 . 3 . https://web.archive.org/web/20160311061311/http://www.sydneytramwaymuseum.com.au/members.old/Trolley_Wire/145%20-%20Trolley%20Wire%20-%20Apr%201973.pdf . 11 March 2016 . 28 July 2016.
  8. Web site: Rogans Hill Branch . 2024-01-28 . www.nswrail.net.
  9. Web site: February 2018 . February 1867 - Loco Express . 31 January 2024 . Loco Express.
  10. Web site: Rogans Hill Branch . 2024-01-31 . www.nswrail.net.
  11. Web site: Western Sydney Light Rail Network . dead . https://web.archive.org/web/20150607105355/http://www.parracity.nsw.gov.au/work/business_in_parramatta/strategy/solving_transport_problems/light_rail_for_western_sydney . 7 June 2015 . 3 July 2013 . Parramatta City Council.
  12. Web site: 17 June 2014 . Parramatta light rail: $400 million reserved to transform travel to Sydney's second CBD . dead . https://web.archive.org/web/20140621044116/http://www.transport.nsw.gov.au/media-releases/parramatta-light-rail-400-million-reserved-transform-travel-sydneys-second-cbd . 21 June 2014 . 18 June 2014 . Transport for NSW.
  13. Web site: 27 October 2014 . Four Western Sydney corridors shortlisted for Parramatta Light Rail . dead . https://web.archive.org/web/20141027053218/https://www.transport.nsw.gov.au/media-releases/four-western-sydney-corridors-shortlisted-parramatta-light-rail . 27 October 2014 . Transport for NSW.
  14. News: Lehmann . John . 8 June 2015 . Sydney Olympic Park light rail project promises long-overdue 'linking up' of infrastructure . 7 December 2015 . The Daily Telegraph.
  15. Web site: 11 June 2015 . MEDIA RELEASE: Parramatta City Council's vision for Western Sydney Light Rail . live . https://web.archive.org/web/20151210193734/http://www.cityofparramatta.com.au/uncategorized/media-release-parramatta-city-councils-vision-for-western-sydney-light-rail/ . 10 December 2015 . 7 December 2015 . Parramatta City Council.
  16. Web site: 8 May 2015 . Parramatta to Macquarie Park Light Rail . live . https://web.archive.org/web/20151208225534/http://www.ryde.nsw.gov.au/Council/Media-Centre/News-and-Public-Notices/Parramatta-to-Macquarie-Park-Light-Rail . 8 December 2015 . 7 December 2015 . City of Ryde.
  17. Web site: 13 March 2015 . Hills Mayor calls on James Shaw to change track on Light Rail route . live . https://web.archive.org/web/20151217175323/http://www.thehills.nsw.gov.au/News-Publications/Hills-Mayor-calls-on-James-Shaw-to-change-track-on-BorgerFoley-Light-Rail-route . 17 December 2015 . 7 December 2015 . The Hills Shire Council.
  18. Web site: About The WestLine Partnership . live . https://web.archive.org/web/20160304235715/http://sopba.com.au/sites/sopba.com.au/files/uploads/news/About%20WestLine%20Partnership.pdf . 4 March 2016 . 7 December 2015 . Sydney Olympic Park Business Association . The WestLine Partnership.
  19. Web site: 27 March 2015 . Strathfield Council commits $20,000 to support the WestLine Partnership . live . https://web.archive.org/web/20151217131839/http://www.strathfield.nsw.gov.au/news-and-events/media/media-releases-2015/march-27-strathfield-council-commits-20-000-to-support-the-westline-partnership . 17 December 2015 . 28 December 2015 . Strathfield Council.
  20. Web site: The WestLine Partnership . Full Steam Ahead for Light Rail Along Olympic Corridor . live . https://web.archive.org/web/20160304233950/http://www.sopba.com.au/full-steam-ahead-light-rail-along-olympic-corridor . 4 March 2016 . 28 December 2015 . Sydney Olympic Park Business Association.
  21. News: Clennell . Andrew . 7 December 2015 . Western Sydney light rail project worth more than $2b to be announced . 7 December 2015 . The Daily Telegraph.
  22. News: FitzGerald . Deborah . 24 February 2015 . Corporate push to connect light rail from Parramatta to Olympic Park with $1.1 billion in private funding . Parramatta Advertiser.
  23. Web site: 8 June 2015 . The time is NOW for Light Rail to Carlingford . live . https://web.archive.org/web/20151217181507/http://www.thehills.nsw.gov.au/News-Publications/The-time-is-NOW-for-Light-Rail-to-Carlingford . 17 December 2015 . 7 December 2015 . The Hills Shire Council.
  24. News: Kembrey . Melanie . Saulwick . Jacob . 7 December 2015 . Premier Mike Baird to announce light rail from Parramatta to Sydney Olympic Park . live . https://web.archive.org/web/20151208013250/http://www.smh.com.au/nsw/premier-mike-baird-to-announce-light-rail-from-parramatta-to-sydney-olympic-park-20151207-glh36y.html . 8 December 2015 . 7 December 2015 . The Sydney Morning Herald.
  25. Web site: 8 December 2015 . Making it happen in Western Sydney: Parramatta light rail network unveiled . dead . https://web.archive.org/web/20151208175129/http://www.transport.nsw.gov.au/media-releases/making-it-happen-western-sydney-parramatta-light-rail-network-unveiled . 8 December 2015 . Transport for NSW . dmy-all.
  26. Web site: Parramatta Light Rail . live . https://web.archive.org/web/20151210053828/http://www.transport.nsw.gov.au/parramatta-light-rail . 10 December 2015 . 8 December 2015 . Transport for NSW.
  27. News: O'Sullivan . Matt . 8 December 2015 . Parramatta light rail line via Sydney Olympic Park gets green light . live . https://web.archive.org/web/20151208082734/http://www.smh.com.au/nsw/parramatta-light-rail-line-via-sydney-olympic-park-gets-green-light-20151207-glhxhg.html . 8 December 2015 . 8 December 2015 . The Sydney Morning Herald.
  28. News: Saulwick . Jacob . 16 October 2016 . Parramatta light rail costs blow out to more than $3.5 billion . live . https://web.archive.org/web/20161017133000/http://www.smh.com.au/nsw/parramatta-light-rail-costs-blow-out-to-more-than-35-billion-20161014-gs300q.html . 17 October 2016 . 17 October 2016 . The Sydney Morning Herald.
  29. Web site: August 2016 . Parramatta Light Rail Project Overview . live . https://web.archive.org/web/20161011174208/http://data.parramattalightrail.nsw.gov.au/s3fs-public/PLR002_Parra%20promo_1%20Factsheet%20Project%20Overview_FA.pdf . 11 October 2016 . 17 September 2016 . Transport for NSW . 2.
  30. Web site: 14 November 2016 . Sydney Metro West: a new railway, more trains for Western Sydney . live . https://web.archive.org/web/20170429171125/http://www.transport.nsw.gov.au/newsroom/media-releases/sydney-metro-west-new-railway-more-trains-western-sydney . 29 April 2017 . 14 November 2016 . Transport for NSW.
  31. News: O'Sullivan . Matt . 2 October 2016 . Change of course looms for multibillion-dollar Parramatta light rail . live . https://web.archive.org/web/20161004124303/http://www.smh.com.au/nsw/change-of-course-looms-for-multibilliondollar-parramatta-light-rail-20160929-grrg7s.html . 4 October 2016 . 4 October 2016 . The Sydney Morning Herald.
  32. News: 14 July 2017 . Change of route leaves Sydney suburb out of light rail plans . live . https://web.archive.org/web/20170717065325/http://www.9news.com.au/national/2017/07/14/19/17/change-of-route-leaves-sydney-suburb-out-of-light-rail-plans . 17 July 2017 . 16 July 2017 . . Nine Digital.
  33. News: 2021-05-18 . Scathing report refuses to rule out corruption over NSW government's $53m land deal . Jamie . McKinnell . live . https://web.archive.org/web/20220108224922/https://www.abc.net.au/news/2021-05-18/nsw-auditor-general-delivers-scathing-report-over-parramatta-lan/100146234 . 8 January 2022 . 2022-01-07 . ABC News . en-AU.
  34. Web site: 2021-05-18 . Acquisition of 4–6 Grand Avenue, Camellia . live . https://web.archive.org/web/20220107114318/https://www.audit.nsw.gov.au/our-work/reports/acquisition-of-4%E2%80%936-grand-avenue-camellia . 7 January 2022 . 2022-01-07 . Audit Office of New South Wales . en.
  35. News: Ferguson . Adele . O'Sullivan . Matt . 2020-12-14 . Internal probe into toxic land scandal reveals agency flouted rules . registration . live . https://web.archive.org/web/20201213204256/https://www.smh.com.au/national/nsw/internal-probe-into-toxic-land-scandal-reveals-agency-flouted-rules-20201211-p56msh.html . 13 December 2020 . 2020-12-14 . Sydney Morning Herald.
  36. Web site: O'Sullivan . Matt . 9 November 2022 . Second stage of Parramatta light rail line will not open until 2031 . 4 July 2024 . The Sydney Morning Herald . en.
  37. News: https://archive.today/20240305054808/https://www.parranews.com.au/2024/02/parramatta-light-rail-stage-2-gets-greenlight/ . 5 March 2024 . live . 23 February 2024 . Parramatta Light Rail Stage 2 gets greenlight. Ellie . Busby . 5 March 2024 . parranews.com.au .
  38. Web site: Transport for NSW 2015-16 Annual Report Volume 1. Transport for NSW. 18 November 2016. 30. https://web.archive.org/web/20161118164655/http://www.transport.nsw.gov.au/sites/default/files/b2b/publications/tfnsw-annual-report-2015-16-volume-1.pdf. 18 November 2016. dead.
  39. Web site: Preferred route - stage 1. Transport for NSW. 17 February 2017. https://web.archive.org/web/20190228051101/http://data.parramattalightrail.nsw.gov.au/s3fs-public/PLR_alignment_map.pdf. 28 February 2019. live.
  40. Web site: Alex . 2017-03-29 . Parramatta Light Rail part 3: Stage 1 extension and Stage 2 options . 2023-11-30 . StrategicMatters . en.
  41. News: Gilbert. Ewan. Parramatta Light Rail: Consultation for stage one nears end as Government confirms acquisitions. ABC News. Australian Broadcasting Corporation. 23 August 2017. 30 August 2017. 27 July 2021. https://web.archive.org/web/20210727225747/https://www.abc.net.au/news/2017-08-23/parramatta-light-rail-consultation-nears-end/8835444?WT.ac=statenews_nsw. live.
  42. Web site: Parramatta Light Rail approved . www.transport.nsw.gov.au . Transport for NSW . 30 May 2018 . en-AU . 30 May 2018 . 8 June 2018 . https://web.archive.org/web/20180608091200/https://www.transport.nsw.gov.au/news-and-events/media-releases/parramatta-light-rail-approved . live .
  43. Web site: Parramatta light rail to connect communities. Transport for NSW. 17 February 2017. 17 February 2017. https://web.archive.org/web/20170220112756/http://www.transport.nsw.gov.au/newsroom/media-releases/parramatta-light-rail-connect-communities. 20 February 2017.
  44. Web site: Parramatta Light Rail | Stage 1 – Westmead to Carlingford via Camellia: Environmental Impact Statement. Transport for NSW. 24 August 2017. 5-31–5-52, 5-84–5-85. 16 June 2020. https://web.archive.org/web/20200616013133/https://majorprojects.accelo.com/public/e321246b890ccdedc23308fbc50f77ab/01.%20PLR_EIS_Volume%201A.pdf. live.
  45. Web site: Government . NSW . 20 April 2020 . Construction work hours extended at Hawkesbury Road, Westmead . 28 January 2024 . Parramatta Light Rail.
  46. Web site: Westmead metro station Sydney Metro . 2024-01-28 . www.sydneymetro.info . en.
  47. Web site: Parramatta Light Rail Stage 1 - Infrastructure Package - Infrastructure Pipeline . 2024-01-28 . infrastructurepipeline.org.
  48. Web site: Ngara* Wireless Information and Communication Technologies – SIEF . 2024-01-28 . sief.org.au.
  49. Web site: Eat Street Open for Business – Sydney Olympic Park Business Association . 28 January 2024 . en-AU.
  50. Web site: Parramatta metro station Sydney Metro . 2024-01-28 . www.sydneymetro.info . en.
  51. Web site: Civic Link . 2024-01-28 . cityofparramatta.nsw.gov.au . en.
  52. Web site: Robin Thomas Reserve . 2024-01-28 . www.cityofparramatta.nsw.gov.au . en.
  53. Web site: New shared pathway connects Parramatta communities nsw . 2024-01-28 . www.mysydney.nsw.gov.au.
  54. Web site: Parramatta Light Rail . 2024-01-28 . Laing O’Rourke . en.
  55. Web site: 2020-01-03 . Station Stories . 2024-01-28 . Transport NSW Blog . en.
  56. Web site: Parramatta Light Rail Stages 1 and 2 . NSW Government Parramatta Light Rail . 2022-10-04 . 5 October 2022 . https://web.archive.org/web/20221005070908/https://www.parramattalightrail.nsw.gov.au/maps . live .
  57. Web site: NSW Parliament . Portfolio Committee No. 6 - Transport and the Arts . 29 April 2024 . Report No. 21 - PC 6 - Current and future public transport needs in Western Sydney . NSW Parliament.
  58. Web site: Busby . Ellie . 14 June 2024 . Lake's Lidcombe call: Mayor wants Light Rail extended . Parra News.
  59. Web site: Network . Action . Extend Parramatta Light Rail Stage 2 to Lidcombe and Strathfield . 2024-06-24 . actionnetwork.org . en-US.
  60. https://web.archive.org/web/20171125023308/https://www.transport.nsw.gov.au/news-and-events/media-releases/worlds-best-to-build-and-operate-parramatta-light-rail World's best to build and operate Parramatta Light Rail
  61. https://web.archive.org/web/20171125024713/http://www.metro-report.com/news/news-by-region/asia-pacific-ex-china/single-view/view/parramatta-light-rail-shortlists-announced.html Parramatta light rail shortlists announced
  62. Web site: Parramatta Light Rail contracts signed . www.transport.nsw.gov.au . Transport for NSW . en-AU . 20 December 2018 . 21 December 2018 . 21 December 2018 . https://web.archive.org/web/20181221090548/https://www.transport.nsw.gov.au/news-and-events/media-releases/parramatta-light-rail-contracts-signed . live .
  63. https://www.downergroup.com/downer-jv-awarded-parramatta-light-rail-contr Downer JV awarded Parramatta Light Rail contract
  64. Web site: Parramatta Light Rail – Stage 1: frequently asked questions. Transport for NSW. 17 February 2017. 17 February 2017. https://web.archive.org/web/20170217144506/http://data.parramattalightrail.nsw.gov.au/s3fs-public/PLR%20FS_FAQs_accessible2.pdf. dead.
  65. Web site: Stage 1 Frequently Asked Questions . Parramatta Light Rail . . 19 October 2022 . 24 March 2023 . https://web.archive.org/web/20230324135427/https://www.parramattalightrail.nsw.gov.au/faqs . live .
  66. https://web.archive.org/web/20180517062517/https://www.railexpress.com.au/future-parramatta-light-rail-stabling-site-to-be-decontaminated/ Future Parramatta light rail stabling site to be decontaminated
  67. Web site: Parramatta CBD's construction schedule released. Parramatta Light Rail. 23 October 2019. 4 November 2019. https://web.archive.org/web/20191026103940/http://www.parramattalightrail.nsw.gov.au/news/parramatta-cbd-construction-schedule-released. 26 October 2019. live.
  68. Web site: Major construction to begin in January 2020. Parramatta Light Rail. 19 December 2019. 3 February 2020. 3 February 2020. https://web.archive.org/web/20200203045149/http://www.parramattalightrail.nsw.gov.au/news/major-construction-begin-january-2020. live.
  69. Web site: First sod turned for Paramatta Light Rail. Transport for NSW. 31 January 2020. 3 February 2020. 2 February 2020. https://web.archive.org/web/20200202235439/https://www.transport.nsw.gov.au/news-and-events/media-releases/first-sod-turned-for-paramatta-light-rail. live.
  70. Web site: Micro Tunnelling. Parramatta Light Rail. 16 June 2020. 16 June 2020. https://web.archive.org/web/20200616014352/http://parramattalightrail.nsw.gov.au/micro-tunnelling. live.
  71. Web site: Micro-tunnel machine launches to Parramatta Town Hall. Parramatta Light Rail. 15 June 2020. 16 June 2020. 16 June 2020. https://web.archive.org/web/20200616014353/http://www.parramattalightrail.nsw.gov.au/news/micro-tunnel-machine-launches-parramatta-town-hall. live.
  72. http://www.parramattalightrail.nsw.gov.au/news/light-rail-taking-shape-westmead Light rail taking shape in Westmead
  73. Web site: Enabling Road Works. Parramatta Light Rail. 6 November 2019. 26 October 2019. https://web.archive.org/web/20191026103928/http://www.parramattalightrail.nsw.gov.au/enabling-road-works. live.
  74. Web site: Parramatta Light Rail – Stage 1: Connecting great places. Transport for NSW. 7 June 2017. 1, 4. March 2017. https://web.archive.org/web/20170621041838/http://data.parramattalightrail.nsw.gov.au/s3fs-public/AnnouncementBrochureA4.pdf. 21 June 2017. dead.
  75. https://www.railexpress.com.au/nsw-guarantees-later-start-of-parramatta-light-rail/ "NSW 'guarantees' later start of Parramatta Light Rail"
  76. https://www.transport.nsw.gov.au/news-and-events/media-releases/construction-certainty-for-parramatta-eat-street Construction certainty for Parramatta 'Eat Street'
  77. Web site: Construction on 'Eat Street' in 2020. Parramatta Light Rail. 23 October 2019. 4 November 2019. https://web.archive.org/web/20191104011728/http://data.parramattalightrail.nsw.gov.au/s3fs-public/Parramatta%20Light%20Rail%20-%20Eat%20Street%20Construction%202020_0.pdf?UxHxZDjyV1RiEBtijN0NwrNLqzi.kEaG. 4 November 2019. live.
  78. Web site: Eat Street light rail works fast-tracked. Parramatta Light Rail. 14 October 2020. 25 January 2021. 30 January 2021. https://web.archive.org/web/20210130052942/https://www.parramattalightrail.nsw.gov.au/Eat-Street-light-rail-works-fast-tracked. live.
  79. Web site: Eat Street light rail works fast-tracked. Minister for Transport and Roads. 15 October 2020. 25 January 2021. 29 January 2021. https://web.archive.org/web/20210129180625/https://s3.ap-southeast-2.amazonaws.com/stage.data-new.parramattalightrail.nsw.gov.au/s3fs-public/2020-10/Media-release-Eat-Street-light-rail-works-fast-tracked.pdf. live.
  80. Web site: Parramatta's Eat Street open for business. Parramatta Light Rail. 15 October 2021. 19 October 2021. 18 October 2021. https://web.archive.org/web/20211018060609/https://www.parramattalightrail.nsw.gov.au/eat-street-open. live.
  81. Web site: Closure Church St North Parramatta - Driver Notice. CDC NSW. 20 July 2020. 20 July 2020. https://web.archive.org/web/20200720032907/https://www.cdcbus.com.au/images/files/news/CDCNSW_Internal_Communication__Driver_Notice_040_Closure_Church_St_North_Parramatta_03072020_Revised.pdf. live.
  82. Web site: Pedestrians Urged To Look Both Ways As Parramatta's George Street Becomes Two-Way. NSW Government - Tomorrow's Sydney. 6 November 2019. 6 November 2019. https://web.archive.org/web/20191106012911/https://www.mysydney.nsw.gov.au/Pedestrians_urged_to_look_both_ways_as_Parramatta%E2%80%99s_George_Street_becomes_two-way. live.
  83. Web site: Major roads makeover in Parramatta. Parramatta Light Raildate=10 June 2020. 15 June 2020. 15 June 2020. https://web.archive.org/web/20200615034610/http://www.parramattalightrail.nsw.gov.au/news/major-roads-makeover-parramatta. live.
  84. Web site: Upcoming changes in Parramatta CBD. 27 January 2020. 3 February 2020. 3 February 2020. https://web.archive.org/web/20200203001434/http://www.parramattalightrail.nsw.gov.au/news/upcoming-changes-parramatta-cbd. live.
  85. http://data.parramattalightrail.nsw.gov.au/s3fs-public/FAQ%20-%20%20T6%20Line%20closure%20for%20Parramatta%20Light%20Rail.pdf?kCPd2x5Hz6dteOvl5XnnCAaF4D__RSic T6 Carlingford Line closure for Parramatta Light Rail –Temporary Transport Plan
  86. Web site: Parramatta Light Rail - How the preferred network was chosen . Transport for NSW . https://web.archive.org/web/20151210184912/http://www.transport.nsw.gov.au/parramatta-light-rail/how-preferred-network-was-chosen . 10 December 2015 . dead . 8 December 2015.
  87. Web site: Parramatta Light Rail | Stage 1 – Westmead to Carlingford via Camellia: Environmental Impact Statement. Transport for NSW. 5-65, 5-66, 8-27. 24 August 2017. 16 June 2020. https://web.archive.org/web/20200616013133/https://majorprojects.accelo.com/public/e321246b890ccdedc23308fbc50f77ab/01.%20PLR_EIS_Volume%201A.pdf. live.
  88. Web site: Boom! Gates are gone on Parramatta Road. Parramatta Light Rail. 29 January 2020. 3 February 2020. 3 February 2020. https://web.archive.org/web/20200203021616/http://www.parramattalightrail.nsw.gov.au/news/boom-gates-are-gone-parramatta-road. live.
  89. Web site: Journeys by line and year. Bureau of Transport Statistics. Journeys by line. 28 July 2016. https://web.archive.org/web/20151011070718/http://www.bts.nsw.gov.au/ArticleDocuments/223/NSW-SydneyTrains_Usage_summary_journeys_Mar2015.zip.aspx. 11 October 2015. dead.
  90. Web site: Train Patronage - Monthly Figures. 8 June 2017. Transport for NSW. 13 July 2017. 7 August 2017. https://web.archive.org/web/20170807232704/https://www.transport.nsw.gov.au/performance-and-analytics/passenger-travel/train-patronage/train-patronage-monthly-figures. live.
  91. "Big mini-budget for Sydney's rail network" Railway Digest May 2004 page 8
  92. Web site: State Environmental Planning Policy No 63—Major Transport Projects (Amendment No 3) under the Environmental Planning and Assessment Act 1979. NSW Parliamentary Counsel's Office. 22 April 2017. 7. September 2005. 22 April 2017. https://web.archive.org/web/20170422033015/http://www.legislation.nsw.gov.au/EPIs/2005-543.pdf. live.
  93. Web site: News Update September 2019 Newsletter. Parramatta Light Rail. September 2019. 4 November 2019. https://web.archive.org/web/20191104023211/http://data.parramattalightrail.nsw.gov.au/s3fs-public/190209%20PLR%20Q3%20Newsletter_Sept19_web.pdf. 4 November 2019. live.
  94. 1992. Cityrail launches new timetable. Railway Digest. February 1992. 45.
  95. News: Walters. Chris. The Last Train to Carlingford. March 2020. Railway Digest.
  96. Sandown: End of the Line Railway Digest September 2010 page 24
  97. Web site: Transfer Australasia Consortium Secures Parramatta Light Rail. 20 December 2018. 4 November 2019. 4 November 2019. https://web.archive.org/web/20191104031119/https://www.transdev.com.au/press-release/transdev-australasia-consortium-secures-parramatta-light-rail-contract/. live.
  98. Web site: NSW Government . 4 July 2024 . Parramatta Light Rail enters final testing phase as network's name is revealed . 4 July 2024 . en-AU.
  99. Web site: Parramatta Light Rail Overview. Parramatta Light Rail. 4 November 2019. https://web.archive.org/web/20191203230015/http://data.parramattalightrail.nsw.gov.au/s3fs-public/Parramatta%20Light%20Rail%20Overview.pdf?FUmoPP3rT2H_VcsH63IirPjvWM_Dckid. 3 December 2019. dead.
  100. Web site: Transport for NSW . Parramatta Light Rail . 2024-02-19 . Light rail vehicles NSW Government . 2024-03-28 . www.nsw.gov.au . en-AU.