Park Central Towers | |
Building Type: | Residential |
Location: | Makati Avenue, Makati, Philippines |
Coordinates: | 14.5594°N 121.0274°W |
Floor Count: | South Tower - 69 North Tower - 56 |
Status: | Topped-out (South Tower) Under construction (North Tower) |
Topped Out Date: | 2022 (South Tower) |
Est Completion: | 2025 |
Developer: | Ayala Land |
Main Contractor: | Makati Development Corporation |
Architecture Firm: | SCDA Design Leandro V. Locsin Partners |
Park Central Towers is a complex of two skyscrapers currently under construction in Makati, Metro Manila, Philippines. The first building, the Park Central South Tower is already topped-off.
The project for the Park Central Towers was publicly announced in August 2016 by its developer Ayala Land, replacing the Mandarin Oriental Manila, which was relocated to a new structure across the street. Park Central Towers was placed under the Ayala Land Premier brand.[1]
The first building to be built was the Park Central South Tower.[1] The South Tower was topped out on October 21, 2022.[2]
The Park Central South Tower is a 69-storey residential skyscraper with a height of 248m (814feet). Its exterior design was designed by Singaporean firm SCDA Design by Soo Chan, in collaboration with Philippine firm Leandro V. Locsin Partners.[2] The residential towers' interiors were designed by J. Antonio Mendoza Design Consultants, Asuncion Berenguer Inc. in collaboration with Studio Taku Shimizu for the retail podium’s interiors, Q-Works for environmental graphics, Ace and Associates for security, and BCL Asia for landscaping. [3]