Panzer VII Löwe explained

German: Panzerkampfwagen VII German: Löwe
Origin:Nazi Germany
Type:Super-heavy tank
Is Vehicle:yes
Wars:World War II
Designer:Krupp
Design Date:1 November 1941–20 July 1942
Armour:
  • Frontal:
  • Side:
  • Roof:
  • Deck:
  • Floor:
Primary Armament:
  • KwK L/70
  • KwK L/35 or L/50
  • KwK L/35 or L/37 or L/40
Secondary Armament:1 MG-34 or MG-42
Engine:
Suspension:Torsion bar
Crew:5 (driver, commander, gunner, loader, radio operator)
or 6

The German: Panzerkampfwagen VII German: Löwe (Lion), initially known as project VK 70.01, was a series of designs for a super-heavy tank developed by Krupp from 1941 to 1942. The project would be cancelled in favour of even heavier tanks such as the Maus.

The project was only officially known as VK 70.01 or German: Panzerkampfwagen Löwe, with the names German: Panzerkampfwagen VII and VK 72.01 appearing inconsistently in various documents but were never officially recognised.

Development

The parameters for the tank project VK 70.01 were first discussed in October 1941 between Krupp and Wa Prüf 6, the Waffenamt’s development and testing office for armoured vehicles and motorized equipment, with the formal requirements ready by November 1. It would have a combat weight of, have of frontal armour and of side armour, and a 3-man turret with a total crew of 5. It was to be powered by the Daimler-Benz MB507, a Schnellboot engine producing, depending on its version, at 2200 RPM or at 2400 rpm. A top speed of or was expected. The armament was not specified, apart from a required traverse of +20/-10 vertically and 360 degrees horizontally. A weight limit of, set by railroad restrictions, was applied on December 17.

The first design was presented to Wa Prüf 6 on 21 January 1942. Designated W 1648, it weighed, had decreased frontal armour to, a lower top speed of . For its armament, Krupp proposed a 105 mm L/70 gun. A central turret arrangement was also agreed upon. The Maybach HL230, an petrol engine, supposed to enter production in January 1943, was also selected.

During a conference with Hitler on January 23, the proposal was approved, though further discussion regarding the powertrain took place, with the suitability of Porsche’s Diesel–electric powertrain to be reviewed. Hitler also indicated his preference for a large-calibre gun, ordering that different turrets be built: one that mounted a 105 or 128 mm gun, and another for a 150 mm gun.

To this latter requirement, following further discussion with Wa Prüf 6, Krupp was to build two identical hulls, plus a turret for the 105 mm gun and another for the 150 mm gun. The latter turret was to allow for a maximum elevation of 35 to 40 degrees, accommodating the indirect fire role.

On February 23, triggered by fears of heavier Soviet armour, two lighter 72-tonne prototype vehicles, with the same armour (100 mm front, 80 mm sides) and powertrain as the Tiger I, were to be constructed. These vehicles were to be then entered into series production without testing. The crew was also increased to 6. The requirements for these vehicles were finalised on March 5, with Krupp awarded a contract to produce the two vehicles, one of which would omit a turret and mount a test weight instead. VK 70.01 would be officially renamed to German: Panzerkampfwagen Löwe in March.

During another conference, Hitler ordered that a 100-tonne tank be developed instead. Porsche would receive contracts to independently design their own 100-tonne tank, while through April and May Krupp continued creating further designs ranging from 80 to 90 tonnes, including at least one rear-turreted design. Again, Krupp was to deliver two prototypes, one with a turret, and the other without but with a weight.

Further deliberation on the VK 70.01’s main armament continued, with Krupp’s favoured 105 mm still being regarded as insufficiently powerful. A turret with longer 128 mm L/35 and 150 mm L/40 turrets would be proposed, with the -long single-piece ammunition for the latter requiring a large overhang over the rear of the turret.

However, due to ever-increasing demands from Hitler for heavier tanks, the contracts for the prototypes would be cancelled by Wa Prüf 6 on May 18, with the Löwe project officially abandoned by June 7. Further design work continued at Krupp, until work on the Löwe turret was ordered to stop on 20 July 1942, with Krupp instead ordered to begin work on a turret that would evolve into the Maus.

Design

Design specifications for the VK 70.01 project changed throughout its developmental history. Primary armament would’ve been either a 105, 128, or 150 mm gun, while armour ranged from frontally and on the sides.

Powertrains varied from the original HL230, to a proposed Maybach petrol engine, planned for the heavier designs, with a pair of Porsche diesel engines also considered.

The only extant design blueprint, W 1661, dated 9 April 1942, shows a 90-ton tank armed with the 105 mm L/70 gun, the originally-proposed armour requirements (120 mm front, 100 mm sides), and the 800 hp HL230, with a top speed of .

See also

Tanks of comparable role, performance and era

References

Citations
Bibliography