Palatka-Lake Butler State Trail | |
Length Mi: | 47 |
Use: | Hiking/Biking/Horses/Rollerblading |
Season: | Year round |
Hazards: | Abandoned sand mines, unpaved segments, swampland |
The Palatka-Lake Butler State Trail (PLB) corridor stretches nearly from the vicinity of Lake Butler, Florida to Palatka, Florida. The project is located along the former Georgia Southern and Florida Railway right-of-way and the trail is being constructed on top of the existing abandoned railroad bed through (from east to west) Putnam, Clay, Bradford, and Union counties.
The corridor was purchased with Preservation 2000 funds through the Office of Greenways and Trails Acquisition Program. The Rails to Trails Conservancy played a key role in preserving the corridor for conversion to a rail-trail and the trail was designated as part of the Florida Greenways & Trails System in 2007.
Construction of a 12adj=midNaNadj=mid multi-use recreational trail along this corridor is being completed in phases, and the first paved section of opened in Clay County in 2008. The paved trail now runs from western Keystone Heights through and past Florahome through the southern edges of the Etoniah Creek State Forest.
The eastern end of the pavement is diagonally west of the Kay Larkin Airport in Palatka. The construction was administered by the Florida Department of Transportation (FDOT) and funded in part through the Transportation Equity Act of the 21st Century Act (TEA-21). The Trail is managed by the DEP Office of Greenways & Trails.[1]
The Clay County segment of the PLB Trail running through Keystone Heights ties into a 10adj=midNaNadj=mid, 5.5adj=midNaNadj=mid the FDOT constructed. This bike path runs north from downtown Keystone Heights to Mike Roess Gold Head Branch State Park. Twin Lakes Park in Keystone Heights serves as the main trailhead for the Clay County segment and was developed by Clay County with funding from the Florida Recreation Development Assistance Program.
The remainder of the PLB Trail is still in the design phase. The final design must be completed before any additional paving can occur and the 47miles recreational trail is fully constructed. There are plans to connect St. Augustine to Lake City by way of this trail system at some future date, to make the total length of the Trail over .
A section of the 1400miles Florida National Scenic Trail is being developed adjacent to the PLB Trail.