Oroville–Thermalito Complex Explained

Oroville–Thermalito Complex
Above:Oroville–Thermalito Complex
Abovestyle:background:#ccf; font-size:18px;
Imagestyle:thumb
Captionstyle:font-size:14px;
Headerstyle:font-size:15px;
Labelstyle:background:#ddf; font-size:14px;
Header1:Location
Label2:State
Data2:California
Label3:Region
Data3:Northern California
Label4:County
Data4:Butte
Label5:Nearest City(s)
Data5:Oroville East, Ca, Oroville, Ca & Thermalito, Ca
Header6:Operations
Label7:Operator
Data7:California Department of Water Resources (DWR)
Label8:Other operators/co-operators
Data8:Feather River Recreation and Parks District (FRRPD), California Department of Fish and Game
Header9:Sources
Label10:Primary source
Data10:Lake Oroville
Label11:Other source(s)
Data11:Feather River
Header12:Construction & operations
Label13:Designed & built by
Data13:California Department of Water Resources
Label14:Construction period
Data14:1961-1969
Label15:Operations began
Data15:1968

The Oroville–Thermalito Complex is a group of reservoirs, structures, and facilities located in and around the city of Oroville in Butte County, California. The complex serves not only as a regional water conveyance and storage system, but is the headwaters for, and therefore perhaps is the most vital part of, the California Department of Water Resources' State Water Project, as one of the largest publicly built and operated water and power development and conveyance systems.[1]

Background

The Oroville–Thermalito Complex was designed as an efficient water and power storage and conveyance system. All reservoirs and canals, combined, store about 3620000acre.ft when at max capacity, and generate power from releases made through Hyatt Powerplant and two other generating plants in nearby Thermalito. A special fish barrier dam was built to lead salmon and steelhead, returning to spawn, into the Feather River Fish Hatchery. The California Office of Environmental Health Hazard Assessment (OEHHA) has developed a safe eating advisory for fish caught in the Thermalito Forebay and Afterbay based on levels of mercury or PCBs found in local species.[2]

Water released from Lake Oroville is used to produce electricity via Hyatt Powerplant, located in the bedrock beneath and inside of the core of Oroville Dam. Water can either enter the Feather River through the one-unit Thermalito Diversion Dam Powerplant and the Diversion Dam's 14 radial spill gates or up to 17000cuft/s can be diverted into the Thermalito Power Canal.

From there, the water enters the Thermalito Power Canal and flows into Thermalito Forebay. At the end of the forebay, water enters the Thermalito Afterbay by way of the Thermalito Pumping–Generating Plant to produce electricity. The plant can also pump water back into the lake to be reused for power generation at Hyatt Powerplant when needed.

Makeup

Lake Oroville

39.5561°N -121.4517°W

Lake Oroville is the second largest reservoir in California,[3] and stores winter and spring runoff which is released into the Feather River at controlled intervals to meet the Project's needs. It also provides pumped-storage capacity, 750000acre.ft of flood control storage, recreation, and freshwater releases to control salinity intrusion in the Sacramento-San Joaquin Delta and for fish and wildlife protection. The Lake is perhaps the most important of all the Oroville Complex facilities, being that it serves as the headwater of the entire State Water Project.[4]

Lake Oroville has a maximum operating storage of 3537580acre.ft, which, for purposes of scale, is equal to over 1.153 trillion gallons of water. The lake has a water surface area of 15810acres, a maximum water surface elevation of 901feet, and 167 miles of shoreline.

Oroville Dam and spillway

39.5375°N -121.4836°W

The Oroville Dam is the tallest and largest dam in the United States. Completed in 1968, it stands 770feet high with a crest length (top of the dam) 6920feet long. Over 80 million cubic yards of material were needed to build the Oroville Dam. There is enough material in the dam to build a two-lane highway around the Earth. Oroville Dam was named by the California Society of Professional Engineers as one of the seven wonders of engineering in California in 1967.[5]

The dam's inner core is a thin layer made of clay material which resists seepage. Gold dredged tailings, sand & gravel left from the early 20th century gold rush dredging operations along the Feather River, make up the remainder of Oroville Dam. Beneath the dam a giant cavern almost as large as the State Capitol Building has been hollowed out to house six power generation units. Coupled with four additional units in the Thermalito Pumping–Generating Plant, they will generate more than 2.8 billion kilowatt-hours of energy annually.[6]

Edward Hyatt Powerplant

39.5336°N -121.4853°W

Located in rock in the left abutment near the axis of Oroville Dam, the Edward Hyatt Powerplant is an underground, hydroelectric, pumping–generating facility. Construction of the plant began in and was completed in .

Hyatt Powerplant maximizes power production through a pumped-storage operation where water, released for power in excess of local and downstream requirements, is returned to storage in Lake Oroville during off-peak periods and is used for generation during peak power demands. Water from the lake is conveyed to the units through penstocks and branch lines. After passing through the units, water is discharged through the draft tubes to one free surface and one full-flow tailrace tunnel.

The facility was named for Edward Hyatt, who was State Engineer (1927–1950) of the Division of Water Resources under the Department of Public Works. The Division was the predecessor to the Department of Water Resources.

Thermalito Diversion Pool

39.5425°N -121.5436°W

The Thermalito Diversion Pool, in tandem with the Diversion Dam, serves to create a tailwater pool for Hyatt Powerplant, just around the bend to the East, at the base of Oroville Dam. The diversion pool also acts as a forebay when Hyatt Powerplant is pumping water back into Lake Oroville, as well as provides recreation opportunities.

Thermalito Diversion Dam

39.5286°N -121.5447°W

Sitting at the South end of, (and impounding), the Diversion Pool reservoir, the Thermalito Diversion dam can either divert water west-ward into the Thermalito Power Canal for power generation at Thermalito Pumping–Generating Plant at the tail end of the Thermalito Forebay, or can release flow straight through, south, into the Feather River. The Diversion Dam is 143' feet tall and has a crest length of 1300feet.

Thermalito Diversion Dam Powerplant

39.5289°N -121.5467°W

The Thermalito Diversion Dam Powerplant is located at the Thermalito Diversion Dam below the left abutment of the dam. The powerplant generates electricity from water released to the Feather River to maintain fish habitat between the diversion dam and Thermalito Afterbay river outlet. It was constructed in and was completed in . The powerplant has one generating unit with an installed capacity of 3.3 MW, and a maximum flow rate of 615cuft/s.

Thermalito Power Canal

39.5311°N -121.5653°W

The Thermalito Power Canal is a 10000adj=midNaNadj=mid east–west oriented concrete lined canal that extends from a headworks structure, which is part of Thermalito Diversion Dam, to the Thermalito Forebay. It conveys water in either direction between Thermalito Diversion Dam and Thermalito Forebay for pumping and power generation at Hyatt Powerplant and Thermalito Pumping–Generating Plant. Construction on the canal began in and was completed in . The Power Canal has a maximum generating flow of 16900cuft/s with a maximum pumping flow of 9000cuft/s.

Thermalito Forebay

39.47°N -121.675°W

Thermalito Forebay is an offstream reservoir contained by the Thermalito Forebay Dam on the east and south and by Campbell Hills on the north and west. It is located about four miles (6 km) west of Oroville. The forebay conveys generating and pumping flows between Thermalito Power Canal and Thermalito Powerplant, provides regulatory storage and surge damping for the Hyatt–Thermalito power complex, and serves as a recreational area. The Thermalito Forebay has a maximum operating storage of 11770acre.ft, a water surface area of 630acres at maximum storage, and a shoreline of (at maximum operating storage). Construction on the Forebay began in and was completed in .

Thermalito Pumping–Generating Plant

39.5153°N -121.6292°W

Thermalito Pumping–Generating Plant is a principal feature of the Oroville–Thermalito pumped storage power complex. A pumping–generating plant, the facility is operated in tandem with Thermalito Diversion Dam Powerplant and Hyatt Powerplant to produce power. Water released for power in excess of local and downstream requirements is conserved by pumpback operation during off-peak hours through both powerplants into Lake Oroville to be subsequently released for power generation during periods of peak power demand. The Plant has 4 units: 1 generating unit and 3 pumping–generating units, with an installed capacity of 120 MW, maximum flow rate of 17400cuft/s.[7]

Plant construction began in and was completed in, operation started prior to completion, in 1968. In October 2011, the plant was renamed the Ronald B. Robie Thermalito Power Plant.[8] [9] On Thanksgiving, November 22, 2012, there was a major fire originating in a plant lower level cable tray that forced immediate shutdown.[10] [11] Completion of repairs and upgrades was expected for late 2018[12]

Thermalito Afterbay

39.5153°N -121.6292°W

The Thermalito Afterbay is a significantly larger reservoir than that of the Forebay, and sits just 2miles southwest of the tail end of the Forebay, with only a 9100adj=midNaNadj=mid canal connecting them. The Afterbay provides storage for the water required by the pumpback operation to Lake Oroville, helps regulate the power system, produces controlled flow in the Feather River downstream from the Oroville–Thermalito facilities, and provides recreation to the area. It also serves as a warming basin for agricultural water delivery to the numerous rice and grain fields just west of the Afterbay. The Afterbay has a maximum operating storage of 57040acre.ft, a water surface area of 4300acres at max. storage, and a shoreline of 26 miles (at max. operating storage). Thermalito Afterbay Dam, at long, is the longest crest in the California State Water Project system. Construction on the Afterbay began in and was completed in .

Fish-barrier dam

39.5203°N -121.5475°W

The barrier dam, located right next to and just upstream of the Feather River Fish Hatchery, serves to divert fish away from the mainstream and into a fish ladder that leads to the hatchery. Flows at the barrier dam are controlled by releases at the Oroville Dam spillway and Thermalito Diversion Dam. The barrier dam prevents the fish from entering the lake and guides them to the fish ladder. The barrier dam is tall and has a crest length of . The dam was constructed in and completed in .

Feather River Fish Hatchery

39.5178°N -121.5542°W

The Feather River Fish Hatchery was built to compensate for spawning grounds lost to returning salmon and Steelhead trout with the construction of Oroville Dam in the early 1960s. Salmon and steelhead raised at the hatchery are transported in oxygenated, temperature-controlled tanks and released in the Feather and Sacramento Rivers, Lake Oroville, and/or in the Delta near the San Francisco Bay area. These fish account for an estimated 20 percent of the ocean sport and commercial catch in the Pacific Ocean. Hatchery salmon are also planted in Lake Oroville. The first salmon and steelhead entered the hatchery in September 1967. Today, the facility accommodates an average 8,000 fish. The Feather River Fish Hatchery was constructed between and

See also

Notes and References

  1. "California Department of Water Resources- Oroville" Web site: California Department of Water Resources- Oroville . 1 March 2022.
  2. News: California Fish Advisory Map. OEHHA. 2018-06-13. en.
  3. "World Atlas" https://www.worldatlas.com/articles/the-largest-reservoirs-in-california.html
  4. "California Department of Water Resources" Web site: California Department of Water Resources . 1 March 2022.
  5. "Great American Infrastructure" https://www.infrastructureusa.org/great-american-infrastructure-oroville-california-oroville-dam/
  6. Web site: Oroville City, Gold City, the Dam Page . 2012-02-08 . https://web.archive.org/web/20111203235554/http://www.oroville-city.com/sightseeing/thedam.html . 2011-12-03 . dead .
  7. Web site: Thermalito Facilities. CA.Gov Department of Water Resources. California Department of Water Resources. 22 February 2017. Thermalito Pumping–Generating Plant. 22 February 2017. https://web.archive.org/web/20170222200244/http://www.water.ca.gov/swp/facilities/Oroville/thermalito.cfm. dead.
  8. News: Water Commission Honors Former Department of Water Resources Director Ronald B. Robie. 21 February 2017. California Department of Water Resources. New Release. 5 October 2011.
  9. Web site: Former DWR Director Ronald B. Robie Honored with Renaming of Thermalito Pumping–Generating Plant. CA.Gov Department of Water Resources. California Department of Water Resources. 21 February 2017. 21 December 2016. https://web.archive.org/web/20161221152930/http://www.water.ca.gov/newsroom/video/general.cfm. dead.
  10. News: Fire at State Water Project Pumping–Generating Plant Controlled. California Department of Water Resources. News Release 23 November 2012. California Department of Water Resources. 23 November 2012.