Oregon City-class cruiser explained

The Oregon City class was a class of heavy cruisers of the United States Navy. Although ten ships of this class were planned, only four were completed – one of those as a command ship. The three ships completed as cruisers were in commission from 1946 to 1980, one having been converted to a guided missile cruiser (CG).

Design and development

The Oregon City-class cruisers were a modified version of the previous design; the main difference was a more compact pyramidal superstructure with single trunked funnel, intended to improve the arcs of fire of the anti-aircraft (AA) guns. The same type of modification also differentiated the and classes, and to a lesser degree the and classes of light cruisers.[1]

History

Ten ships were authorized for the class with three being completed and the fourth suspended during construction. The final six ships were cancelled, five after being laid down. Construction on the incomplete fourth ship was resumed in 1948 and the ship served as a command ship . All three completed cruisers were commissioned in 1946. Oregon City was decommissioned after only 22 months of service, one of the shortest active careers of any World War II-era cruiser. Albany was later converted into a guided missile ship, becoming the lead ship of the and served until 1980. A similar conversion was planned for Rochester but was cancelled.

Ships in class

+Ships in class[2]
NameHull NumberBuilderLaid downLaunchedCommissioned/
Recommissioned
DecommissionedFate
CA-122Bethlehem Steel Corporation, Fore River Shipyard, Quincy, Massachusetts8 April 19449 June 194516 February 194615 December 1947Struck 1 November 1970; Sold for scrap, 17 August 1973
CA-1236 Mar 194411 Jun 194515 June 194630 June 1958Converted to Guided Missile Cruiser[3] Struck 30 June 1985; Sold for scrap, 12 August 1990
CG-103 November 1962 29 August 1980
CA-12429 May 194428 August 194520 December 194615 August 1961Struck 1 October 1973; Sold for scrap, 24 September 1974
CA-12531 August 194427 January 19517 March 19538 April 1970Converted to command ship during construction – Struck and sold for scrap, 31 Dec 1977
CLC-1
CambridgeCA-12616 December 1944Cancelled 12 August 1945 and scrapped on slip
BridgeportCA-12713 January 1945Cancelled 12 August 1945 and scrapped on slip
Kansas CityCA-1289 July 1945Cancelled 12 August 1945 and scrapped on slip
TulsaCA-129Cancelled 12 August 1945
NorfolkCA-137Philadelphia Naval Shipyard27 December 1944Cancelled 12 August 1945 and scrapped on slip
ScrantonCA-13827 December 1944Cancelled 12 August 1945 and scrapped on slip

See also

Bibliography

External links

Notes and References

  1. Norman Friedman, U.S. Cruisers, An Illustrated Design History 1984
  2. Whitley 1999, p. 269.
  3. Gardiner and Chumbley 1995, p. 578.