Oak Grove station explained

Oak Grove
Style:MBTA
Style2:Orange and Purple
Address:Washington Street at Winter Street
Coordinates:42.4369°N -71.0709°W
Other: MBTA bus:
Platform:1 island platform (Orange Line)
1 side platform (Commuter Rail)
Tracks:2 (Orange Line)
1 (Commuter Rail)
Parking:788 spaces ($9 fee / $3 fee on weekends)
Bicycle:140 spaces in "Pedal and Park" bicycle cage
Passengers:6,637 (daily average boardings)[1]
Pass Year:FY2019
Opened:March 20, 1977 (Orange Line)
Structure:At grade
Accessible:Yes
Zone:1A (Commuter Rail)
Mapframe:yes
Mapframe-Marker:rail
Mapframe-Zoom:12

Oak Grove station is a Massachusetts Bay Transportation Authority (MBTA) intermodal transit station in the northern section of Malden, Massachusetts, just south of the Melrose border. It is the northern terminus of the rapid transit Orange Line and a stop on the Haverhill Line commuter rail service. The accessible station has a 788-space park and ride lot and is served by MBTA bus routes.

The Boston and Maine Railroad opened through Malden in 1845, and a stop at Oak Grove was added by the 1870s. It closed in 1958 amid a series of cuts. The MBTA opened the modern station in March 1977 as the northern terminus of the Haymarket North Extension of the Orange Line. It also temporarily served as the southern terminus of Haverhill Line service in 1984–85 after a bridge fire at North Station. Renovation work on the Orange Line platform, including a new emergency exit ramp, took place in 2013–14. Three new elevators were added in 2019–2022, with one existing elevator replaced. Haverhill Line resumed stopping at the station during a 2022 closure of the Orange Line; Oak Grove was retained as a stop after.

Station layout

Oak Grove has a single island platform serving the two tracks of the Orange Line. Terminating trains use both tracks, changing tracks at a crossover just south of the station. A single side platform serves the Haverhill Line track on the east side of the Orange Line. A fare lobby is located over the tracks at the south end of the station. It has entrances from Washington Street on the west and Banks Place on the east, with elevators to the lobby from both entrances and the Orange Line platform for accessibility.

MBTA bus routes serve Oak Grove station. Routes and use a dedicated busway in the parking area on the east side of the station, while route runs on Washington Street on the west side of the station.

History

Former station

The Boston and Maine Railroad (B&M) opened its mainline from Wilmington Junction to Boston on July 1, 1845, allowing it to operate independently of the Boston and Lowell Railroad. Oak Grove was not initially a stop on the line, but was in service by 1859.[2] [3] The two-story wooden station building, located on the west side of the tracks just south of Oak Grove Court, had a prominent central gable.[4] [5] The Western Route became a busy commuter line, but service declined after World War I, and again after World War II.

On April 18, 1958, the Public Utilities Commission approved a vast set of cuts to Boston and Maine Railroad commuter service, including all stations on the Western Route south of save for Malden.[6] The stations were closed on May 18, 1958, amid the first of a series of cuts.[7] [8] The Oak Grove station building was reused as an antique store by 1962, and was later demolished.[9]

MBTA station

Oak Grove opened on March 20, 1977, as the northern terminus of the Haymarket North Extension of the Orange Line. The design of Oak Grove station was based on that of, opened in 1971.[10] The extension was originally intended to run to, but was cut back to Oak Grove. A platform (sized for Orange Line trains rather than longer commuter rail trains) was built to serve the single Western Route commuter rail track, for potential use should the remainder of the extension be built. In the fare mezzanine, a sign labels the platform as "Orange Line outbound".

Malden Center served as a stop for commuter rail trains from 1977 to 1979, while Oak Grove did not. After the approach trestles at North Station burned on January 20, 1984, Oak Grove became the inbound terminus for the Haverhill Line. When North Station reopened on April 20, 1985, Malden Center replaced Oak Grove as the Malden commuter rail stop. The switch may have been made due to a request by John A. Brennan Jr., who was then constructing a large development near Malden Center station.[11]

Because of its Orange Line connection, Oak Grove occasionally served as a temporary inbound terminus for Haverhill Line service during commuter rail service disruptions between Oak Grove and Boston's North Station. (Double track begins just north of the station, making operations easier than using Malden Center as the terminal.[12]) It served this role during the 2004 Democratic National Convention, when North Station was closed for a week for security purposes. In October 1997, Oak Grove was identified as a possible site for a parking garage, but this was never pursued.[13]

Renovations

During 2013, the MBTA performed heavy maintenance on the Orange Line platform, which had substantially deteriorated during 36 years of operation. High-pressure water was used to strip away the top layer of concrete; a smoother top coat and new tactile platform edging were installed. The work was performed on one side of the platform at a time with no station closures.[14] The project also included new track lighting, guardrails, and expansion joints.

The project, originally expected to cost $2.3 million, was issued a notice to proceed in December 2012. Phase 1, which lasted from April to August 2013, focused on the inbound side of the platform. Original plans called for an exit-only ramp on the north end of the Orange Line platform to be constructed as part of Phase 1; however, this was put off due to the discovery of buried utilities not present on site plans. Phase 2, from August to December 2013, focused on the outbound side of the platform.[15] From March 2 to June 30, 2014, the MBTA constructed the emergency exit ramp and a public restroom as Phase 3.

The existing elevators, which connect the fare mezzanine to the Orange Line platform and the busway, were built with the station and renovated in 1987.[16] [17] (This made Oak Grove the first Orange Line station to be accessible.)[18] [19] Three elevators are being added to the station – an elevator between Washington Street and the mezzanine, a redundant elevator between the mezzanine and the platform, and a redundant elevator between the busway and the mezzanine – and one existing elevator renovated. The MBTA awarded a $22.5 million construction contract in August 2019, and work began that December.[20] [21] [22] The Washington Street elevator opened on January 31, 2021, followed by the first new platform elevator in August.[23] [24] The new east elevator opened in May 2022, with the replacement platform elevator completed that November.[25]

The entire Orange Line, including the Orange Line portion of Oak Grove station, was closed from August 19 to September 18, 2022, during maintenance work. The Haverhill Line stopped at Oak Grove during the closure to provide alternate service.[26] [27] Oak Grove was retained as a permanent Haverhill Line stop after the Orange Line closure.[28] [29] Rail service on the inner Haverhill Line was suspended from September 9 to November 5, 2023, to accommodate signal work. Substitute bus service was operated between Reading and Oak Grove.[30]

External links

Notes and References

  1. Web site: A Guide to Ridership Data . MassDOT/MBTA Office of Performance Management and Innovation . June 22, 2020 . 8.
  2. 10.2307/3111453 . Commuter Services in the Boston Area, 1835-1860 . The Business History Review . 36 . 2 . Summer 1962 . 153–170 . Charles J. . Kennedy. 3111453 . 154294514 .
  3. Map of Boston and its vicinity. 1859 . 1:12,672 . Walling . Henry Francis . F.A. Baker .
  4. Web site: Oak Grove station, Malden, Mass., December 8, 1951. . December 8, 1951 . S.Y. . Whitney . Boston & Maine Railroad Historical Society.
  5. Book: Sanborn Fire Insurance Map from Malden, Middlesex County, Massachusetts . 69 . May 1925 . Sanborn Map Company.
  6. News: Drastic Service Cuts Approved on Five B.& M. Divisions . Daily Boston Globe . 11 . April 19, 1958 . Newspapers.com.
  7. Book: Boston's Commuter Rail: The First 150 Years . Humphrey . Thomas J.. Clark . Norton D. . Boston Street Railway Association . 1985 . 9780685412947 . 67–70.
  8. News: B.&M. Closes Saugus Branch, 3 Other Lines . Daily Boston Globe . May 17, 1958 . 3 . Newspapers.com.
  9. News: Passengers Will Find Gift Shops, Laundries Replacing Rail Depots . Boston Globe . October 6, 1962 . 5 . Robert E. . Glynn . Newspapers.com.
  10. Book: 9th Annual Report . Massachusetts Bay Transportation Authority . 1973 . 19 . Internet Archive.
  11. News: Malden senator has golden touch . October 23, 1988 . 1, 52 . Boston Globe . Brian C. . Mooney . Newspapers.com. (first page)
  12. Web site: Massachusetts Bay Colony Railroad Track Charts . https://web.archive.org/web/20131008000656/http://acm.jhu.edu/~sthurmovik/movies/MBCR+Maps+(2010).pdf . October 8, 2013 . 2010 . Held, Patrick R. . Johns Hopkins Association for Computing Machinery.
  13. Web site: INDEPENDENT STATE AUDITOR'S REPORT ON CERTAIN ACTIVITIES OF THE MASSACHUSETTS BAY TRANSPORTATION AUTHORITY: JULY 1, 1996 TO JULY 31, 2001 . April 3, 2002 . Auditor of the Commonwealth . October 24, 2019 . June 8, 2017 . https://web.archive.org/web/20170608140018/http://www.mass.gov/auditor/docs/privatization/200125133.pdf . dead .
  14. Web site: Oak Grove Platform Rehabilitation Project . Massachusetts Bay Transportation Authority . 12 October 2014 . https://web.archive.org/web/20170823141207/http://www.mbta.com/about_the_mbta/t_projects/default.asp?id=27512 . August 23, 2017 . dead .
  15. News: Work continues at Oak Grove MBTA station . Wicked Local Melrose . Jessica . Sacco . May 16, 2014 . 2 August 2016.
  16. Web site: Evaluation of MBTA Paratransit and Accessible Fixed Route Transit Services: Final Report . Massachusetts Bay Transportation Authority . Tran Systems and Planners Collaborative . August 24, 2007.
  17. News: MBTA plans reduced fare for disabled . Boston Globe . September 11, 1975 . 4 . Newspapers.com.
  18. Web site: Ridership and Service Statistics . 3 . November 1990 . 1-4 . Massachusetts Bay Transportation Authority . Operations Directorate Planning Division . Internet Archive.
  19. Book: Oak Grove Station, Malden . March 1977 . Massachusetts Bay Transportation Authority . Oak Grove is the first new station with an elevator for the use of handicapped persons when new elevators planned or under contract at several stations being modernized are installed..
  20. Web site: Oak Grove Station Improvements Project: MBTA Construction Contract No. A92CN01 . August 12, 2019 . Massachusetts Bay Transportation Authority.
  21. Construction Begins at Oak Grove Station . December 11, 2019 . Massachusetts Bay Transportation Authority.
  22. Web site: Oak Grove Station Improvements: Public Meeting November 25, 2019 . November 25, 2019 . Massachusetts Bay Transportation Authority.
  23. Web site: Report from the General Manager . 16 . May 10, 2021 . Massachusetts Bay Transportation Authority.
  24. Second New Elevator Installed at Oak Grove Station . August 23, 2021 . Massachusetts Bay Transportation Authority.
  25. Web site: System-Wide Accessibility Initiatives—December 2022 . December 6, 2022 . Massachusetts Bay Transportation Authority Department of System-Wide Accessibility . 3.
  26. Web site: A Rider's Guide to Planning Ahead: Upcoming Orange & Green Line Service Suspensions . August 2022 . Massachusetts Bay Transportation Authority.
  27. Web site: Haverhill Line: 2022 Orange Line Surge Schedule . August 19, 2022 . Massachusetts Bay Transportation Authority.
  28. Web site: Haverhill Line 2022 Spring/Summer Schedule . September 19, 2022 . Massachusetts Bay Transportation Authority.
  29. Web site: Alerts: Haverhill Line . https://web.archive.org/web/20220915233005/https://www.mbta.com/schedules/CR-Haverhill/alerts . September 15, 2022 . September 15, 2022 . Massachusetts Bay Transportation Authority.
  30. Service Disruption September 9 to November 5 on Haverhill Commuter Rail Line . August 10, 2023 . Massachusetts Bay Transportation Authority.