Transitway (Ottawa) Explained

Transitway
Owner:City of Ottawa
Locale:Ottawa, Ontario, Canada
Operator:OC Transpo
Transit Type:Bus rapid transit
Lines:11
Stations:44
Began Operation:1983
Map State:show

The Transitway is a bus rapid transit (BRT) network operated by OC Transpo in Ottawa, Ontario, Canada. It comprises a series of bus-only roadways and reserved lanes on city streets and highways. The dedicated busways ensure that buses and emergency vehicles on the Transitway rarely intersect directly with the regular traffic, and make it possible for them to continue at full speed even during rush hour. OC Transpo operates a network of rapid routes which use the Transitway to connect communities with the O-Train light rail system. Additional bus routes also use segments of the Transitway.

The Transitway opened in 1983 with five stations. The network expanded greatly to include over fifty stations at its peak.

In the 2010s, the central segment of the Transitway began reaching capacity, with buses bumper to bumper. To combat this, segments of the Transitway were closed in 2015 to allow conversion to a higher capacity light rail line, which opened in 2019 as the Confederation Line. More segments of the Transitway have been closed since construction began on Stage 2 of the O-Train expansion, and more will converted when Stage 3 begins.

Ottawa's Transitway has been seen as a prime example of bus rapid transit internationally, and has influenced the design and creation of other systems worldwide.[1] The Ottawa Transitway has also been used as a model for how to design bus rapid transit, such as is the case for Brisbane, Australia and Mississauga, among others.[2] [3]

Design

Most of the Ottawa Transitway is grade separated from other modes of traffic, using trenches and elevated structures to bypass intersections. These parts of the Transitway have access controlled to only allow buses, and are accessed from side streets using ramps. Being controlled access, they have high top speeds of up to 90km/h.Other parts of the Transitway are at-grade, with signal priority given to buses at intersections. The city also has a large network of bus lanes on major roads, such as Highway 417 and Baseline Road, but it usually doesn't consider these a part of the rapid transit network.

All vehicles in Ottawa's bus fleet have on-board audio announcements and digital wayfinding. This is typically used to announce next stops, as well as what interchanges and notable destinations are available at that stop.[4]

Stations

Stations on the Transitway typically have at least four lanes, two for buses stopping at the station, and two for vehicles travelling through the station.

Almost all Transitway stations have shelters, and many Transitway stations have live departure boards, pedestrian bridges, and ticket machines.

Older Transitway stations use modernist architecture, accented with red features.[5]

Legacy

The Transitway was the first bus rapid transit system of its kind in North America, and has had a significant impact on Ottawa, as well as cities across the world.[6]

On the backs of the Transitway, Ottawa came to be seen as a gold standard for how to provide rapid transit cost effectively, and grew to champion one of the largest public transit mode shares in North America. Locally, the Transitway has come to form the backbone of the city's entire multi-modal transportation system, contributing to reducing congestion on the road network, making more of the city accessible to active transportation, and is the catalyst that enabled the current O-Train network. Abroad, the Transitway has created a perception of Ottawa as a "transit success story" in a continent otherwise resilient to taking transit, and is seen as a model for other cities internationally, especially within the United States.[7] [8]

History

During the 1970s and 1980s, the Regional Municipality of Ottawa-Carleton approved the construction of a new transit corridor called the Transitway. The purpose of this busway was to increase the speed of city-bound services from east and west. The first two sections opened in 1983: the southwestern Transitway between Lincoln Fields and Baseline and the east between Lees and Hurdman.[9]

The central Transitway was then added in the Westboro and Mechanicsville areas. In the downtown core, buses traveled along dedicated lanes on Albert and Slater streets. The eastern Transitway was extended in both directions, towards Laurier in the northwest and Blair in the east. These segments of the Transitway were serviced by route 95, travelling the full length of the Transitway from Baseline to Blair. Priority measures were later added to Woodroffe Avenue and Regional Road 174, extending service into the suburbs of Barrhaven and Orleans.[9]

In the 1990s, a rail corridor was gradually converted into the southeast Transitway, spanning from Hurdman to South Keys. This new section necessitated the creation of route 97. Route 97 followed the new southeast Transitway before joining route 95 along the existing Transitway segments. The 97 was extended to service the suburb of Kanata. The Kanata section was later split off into route 96.[9]

In 2001, the O-Train's Trillium Line (then simply the "O-Train") opened. Its northern terminus was at the new Bayview station on the central Transitway and its southern terminus at Greenboro on the southeast Transitway.[10]

The southwest Transitway was gradually extended southward, first to Fallowfield in 2005 and then to Barrhaven Centre in 2011. A median busway section was added along Chapman Mills Drive to Nepean Woods in 2014. The first segment of the western Transitway opened in 2009 connecting Pinecrest and Bayshore. This was extended to Moodie in 2017.[11]

Beginning in 2015, sections of the Transitway closed for conversion to light rail for the Confederation Line. Buses were rerouted to bus-only lanes along Highway 417, Regional Road 174, and city streets.[12] The Confederation Line opened in 2019, along with a major re-organization of the Transitway network. Rapid routes no longer travelled through downtown Ottawa. Instead, all rapid routes use the Transitway to connect communities to the Confederation Line at one of three stations: Tunney's Pasture, Hurdman, or Blair. Routes were also renumbered to correspond with their geographic service area, resulting in the retirement of route 95, the Transitway's busiest and oldest route.[13] Multiple sections of the Transitway were permanently closed for O-Train Stage 2 construction in 2021 and 2022. In September of 2021, the Transitway was closed between Moodie and Bayshore, followed by the section between Bayshore and Pinecrest in April of 2022. Buses were detoured along Highway 417, with Moodie station being relocated to temporary bus stops at the interchange ramps, and some bus routes bypassing Pinecrest and Bayshore stations eastbound as a result.[14] [15] In June, the entirety of the central Transitway between Tunney's Pasture and Dominion stations was closed, as well as the southwest Transitway between Iris and Baseline. Buses were detoured along Scott Street parallel to the former central Transitway, with a temporary extension and bridge connecting to Dominion Station. Buses were routed along Iris Street and Woodroffe Avenue between Iris and Baseline stations.[16]

Routes

The following are OC Transpo's rapid routes, which travel along the Transitway with frequent service connecting communities to the O-Train. Additional OC Transpo routes also use segments of the Transitway.

TerminusTerminusNotesMap
Millennium
Trim
Place d'Orléans
Blair
La Cité
Rideau
  • Select peak trips extend to/from La Cité and Samuel Genest school
  • Overnight extension N39 terminates at Rideau
http://www.octranspo.com/images/files/routes_pdf/map_carte_039.pdf
Hospital / HôpitalHurdman
Rideau
http://www.octranspo.com/images/files/routes_pdf/map_carte_045.pdf
Crystal Bay
Bayshore
Tunney's Pasture
Rideau
  • Frequent service provided between Tunney's Pasture and Bayshore during most time periods. All other trips start/end at the Department of National Defense Carling Campus.
  • Overnight extension N57 terminates at Rideau
http://www.octranspo.com/images/files/routes_pdf/map_carte_057.pdf
Stittsville
Terry Fox
Tunney's Pasture
Gatineau
Pimisi
Rideau
  • Trips are extended to/from Gatineau during peak hours.
  • Early morning trips travel via Pinecrest Garage on Queensview
  • Overnight extension N61 terminates at Rideau
  • Serves Pimisi on Canada Day for customers with accessibility needs.
http://www.octranspo.com/images/files/routes_pdf/map_carte_061.pdf
StittsvilleEagleson
  • AM peak: travels directly from Castlefrank to Highway 417 and Eagleson, bypassing Katimavik and Terry Fox
  • PM peak: serves Katimavik, but do not serve Castlefrank north of Katimavik, or Terry Fox station
http://www.octranspo.com/images/files/routes_pdf/map_carte_061.pdf
Terry FoxEagleson
  • Travels via Highway 417 between Castlefrank and Eagleson station. This route only operates during the AM peak periods.
http://www.octranspo.com/images/files/routes_pdf/map_carte_061.pdf
Stittsville
Terry Fox
Tunney's Pasture
  • Before noon on weekdays, eastbound buses travel via Fringewood between Abbott E. and Hazeldean, while westbound buses travel via Iber
  • After noon on weekdays, buses follow the reverse direction on both roads
http://www.octranspo.com/images/files/routes_pdf/map_carte_062.pdf
Briarbrook via InnovationTunney's Pasture via Briarbrook
Gatineau via Briarbrook
Pimisi
  • Eastbound AM peak period trips travel via March instead of the business park and are extended to Gatineau; the reverse occurs in the PM peak for westbound
  • Serves Pimisi on Canada Day for customers with accessibility needs.
http://www.octranspo.com/images/files/routes_pdf/map_carte_063.pdf
RiverviewLimebank (2024)Tunney's Pasture
  • When the Line 2 expansion opens in 2024, Route 74 will be extended from Riverview station east along Earl Armstrong, bringing its new terminus to Limebank station.[17]
  • Select late evening northbound trips terminate at Fallowfield.
http://www.octranspo.com/images/files/routes_pdf/map_carte_074.pdf
Barrhaven Centre
Cambrian
Tunney's Pasture
Gatineau
Pimisi
Rideau
  • Overnight extension N75 terminates at Rideau
  • Serves Pimisi on Canada Day for customers with accessibility needs.
http://www.octranspo.com/images/files/routes_pdf_future/map_carte_075.pdf
Airport
Airport via Uplands
South Keys
Hurdman
Rideau
  • Select late evening southbound trips travel via Hunt Club and Uplands instead of the Airport Parkway in the southbound direction only. Select peak tips are extended to start/end at Hunt Club loop but signed as 97 South Keys in the southbound direction.
  • Overnight extension N97 terminates at Rideau. Service to/from the Ottawa MacDonald Cartier International Airport will be replaced by Line 4 in the service change that was originally scheduled for fall 2022; that opening has been delayed.[18] This route could potentially be removed due to routes 98 and 99 offering parallel service along its entire route.
http://www.octranspo.com/images/files/routes_pdf/map_carte_097.pdf
HawthorneHurdmanhttp://www.octranspo.com/images/files/routes_pdf/map_carte_098.pdf
Barrhaven Centre
Citigate
E.S. Pierre-de-Blois
Greenboro
Greenboro via Uplands
Hurdman
Riverview
Spratt / LimebankLimebank (2024)
  • Extended from Greenboro to/from Hurdman during peak hours in both directions. Select trips extended from Barrhaven Centre to Citigate Barrhaven. Late night and early morning trips to/from Barrhaven Centre are shortened to start and end at Riverview. All weekend trips Travel via Uplands and Hunt Club instead of the Airport Parkway in the northbound direction only. Select weekday trips start/end at Spratt / Limebank. Some weekday trips start/end at E.S. Pierre-de-Blois.
  • When the Line 2 expansion opens in 2024, the 99 will be extended in both directions to follow Limebank Road south from Limebank / Spratt, in order to connect with the new Limebank terminus station. Once parallel bus service ends after the first winter of revenue service on Lines 2 and 4, service on Route 99 between Barrhaven Centre and Citigate will be replaced by Local Limited Service Route 110. Service between Riverside South and Greenboro will be replaced by O-Train Line 2.[19]
http://www.octranspo.com/images/files/routes_pdf/map_carte_099.pdf

Stations and segments

East

StationRapid connectionsNotes
  • Bus terminal
  • Park & Ride
  • Curbside
  • Curbside
  • Park & Ride
  • Bus terminal
  • Park & Ride
  • Curbside
  • Park & Ride
  • Bus terminal
  • Park & Ride
The east Transitway currently consists of a series of intermittent bus-only lanes along Regional Road 174 between Blair and Place d'Orléans.

Southeast

StationRapid connectionsNotes
  • Bus terminal
  • Busway
  • Busway
  • Busway
  • Busway
  • Busway
  • Busway
(future)
  • Busway
  • Busway
  • Park & Ride
(future)
  • Busway
  • Bus terminal
  • Park & Ride
(2024) (future) (future) (future)
  • Bus terminal
  • Curbside
  • Curbside
The southeast Transitway is a dedicated busway adjacent to some rail corridors between Hurdman and South Keys.

Central

StationRapid connectionsNotes
(future)
  • Bus terminal
(future) (future)
  • Curbside
(future) (future)
  • Busway
The central Transitway was a dedicated busway between Tunney's Pasture and Dominion. It was closed in preparation for O-Train Stage 2 construction in June 2022, with buses now running along Scott Street. A temporary Transitway was built from Dominion station to the intersection of Churchill Road and Scott Street. The new Transitway travels over the old one via the bailey bridge and then alongside until the intersection of Scott / Churchill.

Downtown

The former downtown section of the Transitway consisted of two single bus-only lanes on Albert and Slater Streets (one-way public streets in opposite westbound and eastbound directions, respectively), with stops in each direction at Bay, Kent, Bank and Metcalfe Streets as well as on the Mackenzie King Bridge. Traffic congestion here, where the buses mingle with private vehicles, often caused service delays and was seen by some as the main weakness in the Transitway system.

Initial plans for the Transitway included a bus-only tunnel in this section but the cost of a ventilated tunnel for conventional buses was deemed too expensive and was not warranted at the time. In 2006, it was proposed to extend the O-Train downtown as a tramway over the same streets while keeping existing bus and car traffic. The idea was met with objections from businesses along those streets, as normal access to the businesses would be impeded.

In 2019, the Confederation Line opened, replacing the downtown portion of the Transitway with an underground, high-capacity rapid transit rail line. This service change greatly reduced the number of buses travelling on Albert and Slater streets.

Southwest

StationRapid connectionsNotes
  • Bus terminal
  • Busway
  • Busway
  • Busway
  • Park & Ride
  • Connection to Via Rail services
  • Busway
  • Busway
  • Park & Ride
  • Busway
  • Busway
  • Curbside
  • Located across from Amazon's YOW3 facility on Citigate Drive
  • Curbside
  • Busway
  • Busway
  • Park & Ride
  • Bus terminal
  • Park & Ride
The southwest Transitway includes a dedicated busway from Lincoln Fields to Baseline. Buses then travel on reserved lanes before joining a busway before Fallowfield. This busway extends from Fallowfield to Barrhaven Centre. A separate median busway east of Marketplace connects Beatrice and Nepean Woods before traveling along reserved lanes to Riverview.

West

StationRapid connectionsNotes
  • Busway
  • Bus terminal
  • Busway
  • Curbside
  • Bus terminal
  • Park & Ride
  • Bus terminal
  • Park & Ride
  • Bus terminal
  • Park & Ride
  • Curbside
  • Curbside
  • Bus terminal
  • Park & Ride
The west Transitway consisted of a dedicated busway between Pinecrest and Moodie, however the section between Moodie and Bayshore closed permanently in September 2021, followed by the section between Bayshore and Pinecrest in April 2022. Buses also use reserved lanes on Highway 417 between Moodie and Eagleson.

See also

Other bus rapid transit systems in Ontario

References

  1. Web site: Emerging Technologies for Rapid Transit: Part One Future-proofing Investment Decisions . As case studies in Ottawa, Adelaide, and Brisbane show, the “best case” scenarios for BRT investment often result in subsequent upgrades to LRT or tunneling to separate BRT systems from surface traffic.
  2. Web site: Bus Rapid Transit (BRT) – Mississauga Segment Implementation Plan . City of Mississauga.
  3. Web site: April 2002 . Ottawa and Brisbane: Comparing a Mature Busway System with Its State-of-the-Art Progeny .
  4. Web site: Vehicles OC Transpo . 2024-07-26 . www.octranspo.com.
  5. Web site: Does Busway Architecture Matter? . 2024-08-08.
  6. Web site: Marching toward 1M: 7 moments that marked Ottawa's growth into a big city . CBC.
  7. Web site: Osman . Laura . January 3, 2024 . 'I am done': Amid rider woes, is Ottawa's transit system a victim of its own success? . The Ottawa Citizen.
  8. Web site: 2010-05-17 . Ottawa, Closer than Ever to Replacing Bus Rapid Transit with Light Rail . 2024-07-26 . The Transport Politic . en-US.
  9. Web site: Ottawa, Ontario: BRT Case Study. Transportation Research Board. April 16, 2020.
  10. Web site: Ottawa's O-Train rides the freight line. February 10, 2003. Canadian Consulting Engineer. April 16, 2020.
  11. Web site: Bayshore to Moodie Bus Rapid Transit (BRT) Conversion to Light Rail Transit (LRT) Environmental Assessment (EA). City of Ottawa. April 16, 2020.
  12. News: Ottawa light rail construction closing more of Transitway in December, January. October 14, 2015. CBC News. April 16, 2020.
  13. Web site: New route numbers. OC Transpo. April 16, 2020.
  14. Web site: 2022-04-22 . Section of the Transitway permanently closing in Ottawa's west end for LRT . 2022-08-25 . Ottawa . en.
  15. Web site: 2021-08-19 . Moodie Station to be temporarily relocated, Transitway detoured for Stage 2 O-Train construction . 2022-09-21 . Glen Gower . en.
  16. Web site: 2022-06-22 . Two sections of the Transitway permanently closing to buses this weekend . 2022-08-25 . Ottawa . en.
  17. Web site: 2023-05-26 . OC Transpo to keep parallel bus service through the first winter when Trillium Line launches . 2023-05-28 . Ottawa . en.
  18. Web site: O-Train to skip another September at Carleton University . Porter . Kate . March 29, 2023 . CBC News . CBC . April 3, 2023 . The 19-kilometre Trillium Line, also referred to as Line 2 of the O-Train, is under construction from Bayview Station to Riverside South, with a four-kilometre spur line to the Ottawa International Airport. The first of three extensions under the municipality's Stage 2 construction project, the Trillium Line was originally scheduled to open in time for the resumption of classes last fall. Best estimates by rail construction director Michael Morgan now see the City of Ottawa taking over that train line this October, after contractor Transit NEXT, a wholly owned subsidiary of SNC-Lavalin, does its final trial run in September..
  19. https://pub-ottawa.escribemeetings.com/filestream.ashx?DocumentId=150850

External links