Nyagak Hydroelectric Power Station Explained

Nyagak Power Station
Location Map:Uganda
Location Map Caption:Map of Uganda showing the location of
Nyagak Power Station
Coordinates:2.4306°N 30.9639°W
Country:Uganda
Location:Paidha
Status:O
Dam Crosses:Nyagak River
Res Elevation:1380m (4,530feet)
Plant Commission:September 2012[1]
Plant Type:R
Plant Turbines:2
Plant Capacity:3.5MW

Nyagak Power Station is a mini hydroelectric power plant in Uganda.

Location

The power station is located across the Nyagak River, in Nyapea Sub-county, Okoro County, Zombo District, in West Nile sub-region, Northern Region. This location is in the town of Paidha, close to the border with the Democratic Republic of the Congo. This location is approximately, by road, south of Arua, the largest town in the sub-region.[2] The coordinates of the power station are 2°25'50.0"N 30°57'50.0"E (Latitude: 2.430556; Longitude: 30.963889).

Overview

The site and the development concept for the project have been extensively studied, including:

The Nyagak hydropower project, in its first phase, is expected to generate 3.5 megawatts, using a run-of-river scheme. A diversion weir high will be constructed about downstream from the Paidha-Nyapea Road Bridge. A power intake will be located at the left abutment of the weir. The water conveyance works are composed of a 1km (01miles) long pipeline, a surge shaft, and a 400m (1,300feet) long surface penstock. The powerhouse will be configured to accommodate two generating units along with the associated electro-mechanical equipment. The sub-region is not connected to the national electric grid and is not expected to be connected to the grid until the planned Karuma Power Station comes online in 2018.

It is anticipated that power produced from Nyagak will serve a population exceeding one million people in Arua District, Nebbi District, and Zombo District. A 33 kilovolt powerline connecting the towns of Arua and Nebbi is being developed. A 33 kilovolt powerline already exists between the towns of Nebbi and Paidha and is just a short distance away from the proposed powerhouse. The structural design allows for future expansion of the generation capacity to of power.

All the studies carried out before construction of the powerhouse indicated that potentially low environmental and social impacts would result from the implementation of the Nyagak Hydropower Project. The main reason for this is that the hydro scheme is small and its impact is limited. The area is sparsely populated with low aquatic and terrestrial ecological characteristics.

The Nyagak Hydropower project is in line with the Ugandan government’s plans for the decentralization and privatization of hydropower systems. The government of Uganda, through support from the World Bank, is in the process of implementing the Energy for Rural Transformation (ERT) through the African Rural Renewable Energy Initiative (AFRREI). West Nile Rural Electrification Company (WENRECO), a subsidiary of Industrial Promotion Services, was selected to develop the power plant. Construction began in December 2006.[4]

Construction delays

The project was delayed for nearly two decades because of financial and procurement hurdles at the government level.

President Yoweri Museveni broke ground in February 2006. In December 2006, the Czech construction firm Skodaexport Company Limited started construction. Since 2006, about ten deadlines were issued for completion of the dam.[5]

After multiple interruptions, construction of the power station resumed in August 2010. Spencon Services of India was selected as the new contractor. Under the revised terms of the contract, the government of Uganda took a 10 percent shareholding in the power station.[6]

By July 2012, the construction of the power station was complete.[7] On 14 September 2012, President Yoweri Museveni commissioned the power plant.[8]

Construction costs

The estimated costs for the dam and power plant were approximately US$14 million.[9]

The German Investment Corporation, a subsidiary of KfW, has provided US$11 million for construction of the power station, as well as US$13 million for the West Nile Electric Grid Extension and Rehabilitation Project.[10]

Photos and diagrams

See also

External links

Notes and References

  1. Web site: Museveni Switches On Nyagak . Felix Warom . Okelo . 16 September 2012 . 7 May 2014 . . Kampala.
  2. Web site: 12 April 2016 . 12 April 2016 . Globefeed.com . Distance between Arua, Northern Region, Uganda and WENRECo Nyagak Power Plant, Okoro, Uganda . Globefeed.com.
  3. Web site: 12 April 2016. Environmental Impact Statement For Nyagak Minihydro Power Station. Lindhjem.info (LJI). 7 September 2005. LJI. dead. https://web.archive.org/web/20140211164126/http://www.lindhjem.info/Nyagak%20EIA%20_revised%20ver2_.pdf. 11 February 2014.
  4. Web site: Paidha Power Plant Launched . . Ronald . Kalyango . 6 February 2006 . Kampala . 12 April 2016.
  5. Web site: Felix Warom . Okello . 19 September 2011 . Patients Pay For Electricity As Black-outs Hit West Nile . 12 April 2016 . Kampala . Daily Monitor.
  6. Web site: Ronald . Kalyango . Construction of Nyagak Power Dam to Resume . . 5 August 2010 . 12 April 2016 . Kampala.
  7. Web site: Benedict . Nyagak power dam to be commissioned on July 31 . . 12 April 2016 . 20 July 2012 . Okethwengu . Kampala.
  8. Web site: Museveni commissions Nyagak hydropower plant . 12 April 2016 . 14 September 2012 . Vision Reporter . Kampala.
  9. Web site: 26 December 2005 . 12 April 2016 . Power station to cost $14m . Aidah . Nanyonjo . . Kampala.
  10. Web site: 12 April 2016 . . 15 November 2013 . Ayiga . Ondoga . Kampala . West Nile power line extension begins.