Nouvelle route du Littoral explained

Nouvelle route du Littoral
Image Notes:The Grande Chaloupe viaduct under construction in May 2015.
Alternate Name:NRL
Established:Partial (southbound) :
Length Km:12.5
Direction A:East
Direction B:South-east
Terminus A:Saint-Denis
Terminus B:La Possession
Country:REU

The Nouvelle route du Littoral  "New Coastal Road" or NRL is a project to reroute National route 1 from the coast to over the ocean in Réunion, a French overseas department in the south-west Indian Ocean. Built on viaducts and causeway, the road will pass over the sea for around and eventually link Saint-Denis to La Possession, replacing the current route du Littoral, which is too exposed to rockfalls from the cliff at the foot of which it is located and to heavy waves. This project has faced technical, ecological and financial challenges, and the awarding of some of the contracts is the subject of a legal inquiry.[1] [2] [3]

Project

The project has been the subject of many studies and many designs, ranging from an entirely viaduct solution over the sea to a causeway doubling the existing road with various intermediate solutions. A tunnel under La Montagne was also studied.

The cost of the project was €1.6 billion (in December 2011), which equates to €130 million per kilometre.[4] This high cost has earnt the NRL the nickname of "the most expensive road in the world"

The project was the subject of an assessment by the Autorité environnementale in October 2011, endorsed by the Minister for the Environment and Sustainable Development,[5] and was also assessed by the Conseil national de la protection de la nature (CNPN).[6]

Construction

In 2019, the supply of rocks for the causeway caused the work to be interrupted. The road requires 3 million tonnes of large boulders, the supply of which requires the opening of quarries at Saint-Leu and Bois-Blanc. Following legal challenges by environmental groups, citing the impact of the quarries, and the impact on the sea cliffs of the proposed causeway portion, the administrative court suspended the opening authorisations in April 2019, asking for a reflection on the departmental plan of the mines.

On 3 April 2020, the Council of State confirmed the suspension of construction.[7] On 20 June, Didier Robert, then president of the Regional Council of Réunion, announced that the project would only be partially completed[8] pending reconsideration of the plans for the project. An agreement between the region and the contractors was reached on 31 July 2020, the terms of which remain to be published.[9]

On 30 March 2021 the viaduct portion between Grande Chaloupe and Saint-Denis was completed, with opening expected for the end of 2021.[10]

In 2021, the incorrect installation of several hundred tetrapods caused additional delays[11]

In mid-February 2022, the new president of the regional council Huguette Bello, announced that the La Possession to Grande Chaloupe section, originally planned as a causeway, was to be built as a viaduct similar to that of the Saint-Denis to Grande Chaloupe section.[12] This is expected to add €500 and €700 million to the cost of the road. Opening is planned seven years after the administrative procedures and preliminary studies, for an estimated opening date around 2029 or 2030. The revised plan consists of a succession of three viaducts, with causeway only being used for short distances to connect between viaducts. One of the arguments raised for the use of viaducts, rather than causeway was based on the effects of the passage of the Cyclone Batsirai at the beginning of February 2022. The cyclone caused waves which partially submerged the existing causeway, requiring it to be closed and emergency repairs were needed prior to reopening.[13] However, the viaduct portion was not impacted by the passage of the cyclone.

On 28 August 2022, the new road was partially opened, in one direction only, on the between St Denis and La Grande Chaloupe.[14]

References

  1. Web site: La Réunion. Une route dans un océan de scandales. Adrien Rouchaléou. L'Humanité. fr. 2015-02-13. 26 September 2022. 24 September 2015. https://web.archive.org/web/20150924131145/http://www.humanite.fr/la-reunion-une-route-dans-un-ocean-de-scandales-565509. live.
  2. Web site: Le projet fou de Vinci et Bouygues qui va ruiner l’île de La Réunion. Philippe Desfilhes. Reporterre. fr. 2015-06-03. 26 September 2022. 1 February 2022. https://web.archive.org/web/20220201200505/https://reporterre.net/Le-projet-fou-de-Vinci-et-Bouygues-qui-va-ruiner-l-ile-de-La-Reunion. live.
  3. Web site: Nouvelle Route du Littoral à La Réunion : La route la plus chère de France. Clémence Alméras. La Revue parlementaire. fr. 26 September 2022. 21 July 2015. https://web.archive.org/web/20150721210440/http://www.larevueparlementaire.fr/pages/RP960/rp960-nouvelle-route-du-littoral-a-la-reunion.html. live. .
  4. Web site: À La Réunion, de lourds soupçons pèsent sur la route à 1,6 milliard. Julien Sartre. Mediapart. fr. 24 September 2015. 24 September 2015. 25 September 2015. https://web.archive.org/web/20150925084203/http://www.mediapart.fr/journal/france/240915/la-reunion-de-lourds-soupcons-pesent-sur-la-route-16-milliard?onglet=full. live.
  5. Web site: Avis d'autorité environnementale sur le projet de nouvelle route du littoral. Ministère de l'Écologie. PDF. October 2011. 26 September 2022. 3 March 2016. https://web.archive.org/web/20160303234931/http://www.developpement-durable.gouv.fr/IMG/pdf/11094-IDPP2-11-10-2919-AvisAE_RouteLittoralReunion.pdf. live. .
  6. Web site: Avis sur le projet de route du littoral de la Réunion. Laurent Roy. Ministère de l'Écologie. fr. 2013-09-10. 26 September 2022. 4 March 2016. https://web.archive.org/web/20160304122037/http://www.developpement-durable.gouv.fr/IMG/pdf/Avis_CNPN_du_24_06_projet_Rte_du_Littoral_REUNION.pdf. live.
  7. News: Route du littoral à La Réunion: Le conseil d'État confirme la suspension du chantier. AFP. Le Figaro. fr. 2020-04-14. Coastal road in Reunion: The Council of State confirms the suspension of the construction site. 26 September 2022. 7 September 2022. https://web.archive.org/web/20220907195452/https://www.lefigaro.fr/flash-eco/route-du-littoral-a-la-reunion-le-conseil-d-etat-confirme-la-suspension-du-chantier-20200414. live.
  8. Web site: La Réunion renonce à finir l'absurde « nouvelle route du littoral ». Philippe Desfilhes. Reporterre. fr. 2020-06-21. Reunion renounces to finish the absurd "new coastal road". 2 September 2022. https://web.archive.org/web/20220902150737/https://reporterre.net/La-Reunion-renonce-a-finir-l-absurde-nouvelle-route-du-littoral. live.
  9. News: À La Réunion, un accord trouvé pour terminer le chantier de la route du littoral. Jérôme Talpin. Le Monde. fr. 2020-08-01. In Reunion, an agreement reached to complete the construction of the coastal road. 26 September 2022. 26 September 2022. https://web.archive.org/web/20220926044520/https://www.lemonde.fr/economie/article/2020/08/01/a-la-reunion-un-accord-trouve-pour-terminer-le-chantier-de-la-route-du-littoral_6047900_3234.html. live.
  10. Web site: NRL : le viaduc, qui "n’aboutit nulle part" selon EELV, sera livré le 30 mars. LH. Réunion 1ère. 26 March 2021. 27 March 2021. NRL: the viaduct, which "ends nowhere" according to EELV, will be delivered on March 30. 26 March 2021. https://web.archive.org/web/20210326101930/https://la1ere.francetvinfo.fr/reunion/nrl-le-viaduc-qui-n-aboutit-nulle-part-selon-eelv-sera-livre-le-30-mars-968710.html. live.
  11. Web site: Nouvelle Route du Littoral : 775 accropodes mal installés, du retard dans les travaux et une facture qui s'alourdit. Adjaya Hoarau. Jean-Marc Collienne. Réunion 1ère. fr. 30 September 2021. 16 January 2022. Nouvelle route du Littoral: 775 badly installed accropods, work delayed and an increasing bill. 16 January 2022. https://web.archive.org/web/20220116203531/https://la1ere.francetvinfo.fr/reunion/nouvelle-route-du-littoral-775-accropodes-mal-installes-du-retard-dans-les-travaux-et-une-facture-qui-s-alourdie-1116913.html. live. .
  12. News: A La Réunion, un second viaduc pour terminer la nouvelle route du littoral . Le Monde . 14 February 2022 . 15 February 2022 . In Reunion, a second viaduct to complete the new coastal road . 15 February 2022 . https://web.archive.org/web/20220215014723/https://www.lemonde.fr/economie/article/2022/02/14/a-la-reunion-un-second-viaduc-pour-terminer-la-nouvelle-route-du-littoral_6113592_3234.html . live .
  13. Web site: Le point sur la situation quatre jours après le passage du cyclone Batsirai . Update on the situation four days after the passage of cyclone Batsirai . France Info . 7 February 2022 . 16 February 2022 . 15 February 2022 . https://web.archive.org/web/20220215161124/https://la1ere.francetvinfo.fr/reunion/le-point-sur-la-situation-quatre-jours-apres-le-passage-du-cyclone-batsirai-1224042.html . live .
  14. News: Le Monde. 2022-08-28. A La Réunion, ouverture (très) partielle de la Nouvelle route du littoral. In Reunion, (very) partial opening of the New Coastal Road. 26 September 2022. 26 September 2022. https://web.archive.org/web/20220926044139/https://www.lemonde.fr/economie/article/2022/08/28/a-la-reunion-ouverture-tres-partielle-de-la-nouvelle-route-du-littoral_6139293_3234.html. live.

External links