Norwood Central station explained

Style:MBTA
Norwood Central
Address:164 Broadway
Coordinates:42.1888°N -71.1999°W
Platform:2 side platforms
Tracks:2
Parking:781 spaces ($4.00 fee)
Bicycle:27 spaces
Passengers:1,041 (weekday average boardings)
Pass Year:2018
Rebuilt:1899,
Accessible:yes
Zone:3
Former:Dedham Middle, Everett's
Other Services Header:Former services
Other Services Collapsible:yes
Mapframe:yes

Norwood Central station is an MBTA Commuter Rail Franklin/Foxboro Line station located near downtown Norwood, Massachusetts. The station has two side platforms serving the two tracks of the Franklin Branch, each with a mini-high section for accessibility. It serves as a park-and-ride location for Boston's southwest suburbs; with 1,041 daily riders it is the busiest station on the line outside Boston. The former station building, a one-story yellow brick structure, has been converted to commercial use.

The Norfolk County Railroad opened through South Dedham (now Norwood) in 1849. Dedham Middle station opened around 1852, and a small station building was constructed in 1865. The station was renamed Everett's by 1856 and Norwood Central in the 1870s. In 1875, the line became part of the New York and New England Railroad (NY&NE), which built its main shops adjacent to Norwood Central. The Old Colony Railroad opened its Wrentham Branch to Norwood in 1892. The New York, New Haven and Hartford Railroad leased the Old Colony in 1893 and obtained control of the NY&NE in 1895.

The New Haven eliminated an adjacent grade crossing in 1896 and built a new station structure in 1899, ending a decade-long controversy. As rail travel declined, Norwood Shops closed around 1930 and Wrentham Branch service ended in 1938. The Massachusetts Bay Transportation Authority (MBTA) began subsidizing service in 1966 and purchased the line in 1973. Under the MBTA, renovations to the station were made around 1977 and 1990. Along with Franklin Line commuter rail service, Norwood Central was a stop for Foxboro Stadium special events trains from 1986 to 1988 and 1995 to 2010.

Station design

Norwood Central station is located near downtown Norwood, about 0.4miles south of Norwood Common. The two-track Franklin Branch, used by the Franklin/Foxboro Line service, runs approximately north–south through Norwood. Just south of the station, the East Walpole Industrial Track diverges from the mainline, which becomes a single track. The station has two low-level side platforms, with accessible mini-high platforms at their southern ends.[1] Two parking lots – a large lot east of the tracks, and a smaller lot on the west side – together have 781 spaces.[2] [3] With 1,041 daily riders in 2018, it is the busiest station on the line outside Boston.

The former station building, located on the west side of the tracks, is owned by the MBTA but has been converted for commercial use. It is a one-story yellow brick building,, with a bay window on the track side.[4] A raised band of brick encircles the building just below the windows. The hipped slate roof connects with a wooden canopy along the platform. The ridges of the roof are edged with copper rails. Unusually, the downspouts are built into the station brickwork rather than affixed externally.[5]

History

Early history

The Norfolk County Railroad opened from to Walpole on April 23, 1849. South Dedham was originally the only station in what is now Norwood (then part of Dedham). Dedham Middle station was added around 1852.[6] By 1856 it was called Everett's.[7] A small wooden station building on the west side of the tracks was constructed in 1865.[8] The station became the outer terminus for some short turn service in 1867. Norwood separated from Dedham in 1872; the station was renamed Norwood Central within several years.[9] [10]

The railroad went through several mergers, eventually becoming part of the New York and New England Railroad in 1875. A parcel of land across the tracks from Norwood Central station had been purchased by the railroad in June 1874 to construct new car shops to replace a fire-destroyed facility at . The shops opened in 1876; they were expanded in 1889 for additional use as a locomotive shop.[11] Double track was extended from through Norwood to in 1873–1881.

1890s changes

Norwood Central station and Norwood Depot are located just 0.5miles apart. In March 1891, the NY&NE petitioned the Massachusetts Board of Railroad Commissioners for permission to consolidate the two stations and to eliminate grade crossings nearby. The station consolidation had been opposed in a town vote two months earlier.[12] [13] The board approved the railroad's petition on June 25, 1891.[14] An 1890 state law allowed town officials or a railroad company to petition the state to create an independent commission to determine whether a grade crossing could and should be eliminated. The costs of such eliminations were to be paid 65% by the railroad, not more than 10% by the town, and the remainder by the state.[15]

Surveying for the elimination of the Guild Street crossing at Norwood Central and the Washington Street crossing at nearby Winslows station began in July 1891.[16] By November 1892, the crossings of Chapel Street near Winslows and Railroad Avenue were also planned for elimination. However, the railroad objected to bearing 65% of the costs as laid out in the 1890 law, and challenged it in court.[17] On February 15, 1892, the Old Colony Railroad opened an extension of its Wrentham Branch to Norwood. The Wrentham Branch joined the NYN&NE mainline at Norwood Junction, slightly south of Norwood Central station, and used trackage rights on the line through Norwood. (Wrentham Branch trains left the mainline near, ran on little-used trackage to, then used lines of the Old Colony-controlled Boston and Providence Railroad to reach Boston.)[18] [19] The New York, New Haven and Hartford Railroad leased the Old Colony and its subsidiaries on March 1, 1893.

In June 1894, the issue of station consolidation again went before the state board.[20] The commissioners approved the replacement of the two stations with a single station between Day and Vernon Streets.[21] A second new station between Norwood Central and Winslows, replacing the latter, was also soon planned.[22] The New Haven acquired control of the NY&NE through its subsidiary New England Railroad on September 1, 1895, and leased the line as its Midland Division effective July 1, 1898.

With both lines through Norwood under its control, the New Haven moved forward with grade crossing elimination. The railroad was placed on a bridge over Guild Street in 1896, followed by Washington Street in 1897.[23] [24] By 1898, the New Haven planned to quadruple-track and grade-separate the line between Norwood Central and Boston, but this was never completed.[25]

In December 1897, a local business association appeared before the Massachusetts Supreme Judicial Court seeking to force the railroad to comply with the 1891 order and build a combined station.[14] A bill was put forward in the state legislature for the same purpose in March 1898.[26] The stations were never consolidated; a new one-story brick station building was constructed by the railroad at Norwood Central in 1899. It was similar to no-longer-extant stations built around the same time at Forest Hills, Atlantic, Quincy, and Warren.

20th century

The railroad's main car shops were relocated to the new Readville Shops in 1903, though Norwood Shops remained in use for locomotives.[27] [28] The former car shop buildings, closed in 1907, were subsequently used by the American Brake Shore and Foundry Company.[29] The remaining portion of Norwood Shops was closed around 1930; those buildings were sold off to other industrial users or demolished.[30] [31]

Norwood Central short turns decreased from nine daily in 1898 to four in 1906, and were discontinued entirely in 1932. The single daily round trip on the Wrentham Branch was discontinued on July 17, 1938, as part of a massive station closure.[32] Freight service on the line lasted for several more decades; it was gradually abandoned, except for about between Norwood and East Walpole, which remains in service as the CSX East Walpole Industrial Track.[33]

The outer portion of the Midland Division was reduced to single track in 1940–41, leaving Norwood Central as the south end of double track on the line. As well as serving local trains, Norwood Central was a stop for most intercity trains to and on the Midland Division.[34] Intercity service was discontinued in August 1955 when Hurricane Diane washed out a bridge near Putnam, Connecticut, leaving just local service on the Midland Division.

MBTA era

The three railroads providing Boston suburban commuter rail service threatened to discontinue remaining service in the 1960s, leading to the formation of the Massachusetts Bay Transportation Authority (MBTA) in 1964. The MBTA began subsidizing service on the Franklin Branch on April 24, 1966. Norwood Central again was a short turn location for some trains from 1967 until at least 1984.

The New Haven merged into Penn Central in 1969. On January 27, 1973, the MBTA purchased most of the Penn Central commuter lines, including the Franklin Branch and Norwood Central station. The MBTA gradually increased service on the Franklin Line from five daily round trips in 1967 to eight in 1975 and thirteen in 1984; Norwood Central short turns were reintroduced in 1967. In 1977, the agency began an $11 million track and station reconstruction project on the line, partially funded by the Urban Mass Transportation Administration, which included improvements to the platforms at Norwood Central.[35] [36]

When Boston– service for Foxboro Stadium events was moved to the Franklin Line from 1986 to 1988, Norwood Central was an intermediate stop.[37] [38] The service returned to the Franklin Line in 1995, again with Norwood Central as a stop.[39] [40] Norwood Central was dropped from these special event trains beginning with the 2011 season.[41] [42]

A 1988 MBTA historical survey remarked that the station building "is considered architecturally significant and is a very good, intact example of late 19th-century railroad station architecture", and determined that it was eligible for addition to the National Register of Historic Places. A $1.4 million MBTA project beginning in 1989 included renovation of the station building, accessible mini-high platforms, and parking lot expansion.[43] [44] The MBTA rented the restored station building for commercial use in 1991.[45] [46] The remaining buildings of Norwood Shops were demolished in the 1990s for an expanded station parking lot. Solar panels were installed over part of this parking lot in 2018 – one of the first three of a planned 37 such installations at MBTA parking lots.[47] The 120-year-old Guild Street bridge was replaced in 2016–17.[48]

External links

Notes and References

  1. Web site: Massachusetts Bay Colony Railroad Track Charts . https://web.archive.org/web/20131008000656/http://acm.jhu.edu/~sthurmovik/movies/MBCR+Maps+(2010).pdf . October 8, 2013 . 2010 . Held, Patrick R. . Johns Hopkins Association for Computing Machinery . 41.
  2. Web site: Inventory of Park-and-Ride Lots at MBTA Facilities . April 27, 2011 . Boston Region Metropolitan Planning Organization . Ariel . Godwin.
  3. Web site: Norwood Central . Massachusetts Bay Transportation Authority . January 30, 2022.
  4. Web site: 164-170 Broadway . Norwood GIS . Town of Norwood . 2022 . January 30, 2022.
  5. Web site: [{{MACRIS|NRD.249}} Historic Structure Inventory Form ]. MBTA Historical Property Survey, Phase II . McGinley Hart & Associates . Jane . Carolan . 1988 . Massachusetts Cultural Resource Information System.
  6. Book: Boston's Commuter Rail: The First 150 Years . Humphrey . Thomas J.. Clark . Norton D. . Boston Street Railway Association . 1985 . 9780685412947 . 43–46.
  7. Web site: American Railway Guide for the United States . 55 . June 1856 . Dinsmore & Company.
  8. Web site: Norwood, Massachusetts . 1882 . O.H. Bailey & Co.
  9. Book: Roy, John H. Jr. . A Field Guide to Southern New England Railroad Depots and Freight Houses . Branch Line Press . 2007 . 9780942147087 . 210–211.
  10. Book: Snow's Pathfinder Railway Guide . 30 . August 1877 . New England Railway Publishing Company.
  11. Book: Fanning, Patricia J. . Norwood: A History . 32–34, 110 . 2002 . Arcadia Publishing . 9781439630556.
  12. News: Norwood's Grievance . Boston Globe . March 13, 1891 . 7 . Newspapers.com.
  13. News: Many Grade Crossings . Boston Globe . March 18, 1891 . 6 . Newspapers.com.
  14. News: Old Fight Renewed . Boston Globe . December 28, 1897 . 5 . Newspapers.com.
  15. Book: https://archive.org/stream/actsresolvespass1890mass#page/462/mode/2up . Acts and resolves passed by the General Court . Chapter 428: An Act to Promote the Abolition of Grade Crossings . Secretary of the Commonwealth . 1890 . 463–468.
  16. News: Death Traps Going . Boston Globe . July 18, 1891 . 1 . Newspapers.com.
  17. News: Norwood Grade Crossing . Boston Globe . November 4, 1892 . 2 . Newspapers.com.
  18. News: Dedham to North Attleboro . Boston Globe . February 14, 1892 . 6 . Newspapers.com.
  19. News: Hitched on to Boston . Boston Globe . February 15, 1892 . 8 . Newspapers.com.
  20. News: Norwood's Three Depots . Boston Globe . June 12, 1894 . 4 . Newspapers.com.
  21. News: One Station for Norwood . Boston Globe . June 30, 1894 . 3 . Newspapers.com.
  22. Book: Tolles, Bryant Franklin Jr. . Norwood: the centennial history of a Massachusetts town . 1973 . Norwood Centennial Committee . 81–82, 126–131.
  23. Web site: [{{MACRIS|NRD.925}} Historic Structure Inventory Form: Franklin Railroad Bridge (Milepost #15.36) ]. MBTA Historical Property Survey, Phase II . McGinley Hart & Associates . Jane . Carolan . 1988 . Massachusetts Cultural Resource Information System.
  24. Web site: [{{MACRIS|NRD.926}} Historic Structure Inventory Form: Franklin Railroad Bridge (Milepost #14.79) ]. MBTA Historical Property Survey, Phase II . McGinley Hart & Associates . Jane . Carolan . 1988 . Massachusetts Cultural Resource Information System.
  25. News: Hay-Making Day . Boston Globe . September 2, 1898 . 9 . Newspapers.com.
  26. News: Want a New Station . Boston Globe . March 8, 1898 . 4 . Newspapers.com.
  27. News: Strike Breakers Quit . Boston Globe . June 4, 1904 . 7 . Newspapers.com.
  28. Book: Norwood, one of the newest and most progressive towns in Massachusetts . 14 . 1906 . Ambrose Bros., Printers . Internet Archive.
  29. Book: Sanborn Fire Insurance Map from Norwood, Norfolk County, Massachusetts . 10 . July 1923 . Sanborn Map Company.
  30. News: New Haven Budget Forecast Cheerful . Boston Globe . February 19, 1936 . 26 . Newspapers.com.
  31. News: Repair Schedule Has Been Met . Boston Globe . January 11, 1930 . 7 . Newspapers.com.
  32. News: Train service alibi for lateness today . Boston Globe . July 18, 1938 . 2 . Newspapers.com.
  33. Book: Karr, Ronald Dale . The Rail Lines of Southern New England . 2 . Branch Line Press . 2017 . 9780942147124 . 355–366.
  34. Book: The Scenic Shoreline Route Serving New York and New England . April 24, 1955 .

    commons:File:New Haven Railroad 1955 timetable.pdf

    . New York, New Haven and Hartford Railroad . 30 . Table 18: Waterbury–Hartford–Putnam–Boston . Wikimedia Commons.
  35. Book: 1977 Annual Report . 15 . Massachusetts Bay Transportation Authority . Internet Archive . 1977.
  36. Book: 1978 Annual Report . Massachusetts Bay Transportation Authority . Internet Archive . 1978.
  37. News: MBTA provides Patriots' train . Boston Globe . September 3, 1986 . 62 . Newspapers.com.
  38. News: MBTA to run trains to Patriots' games . Boston Globe . September 2, 1988 . 1 . Newspapers.com.
  39. News: How to get to the game . Boston Globe . December 4, 1994 . 63 . Newspapers.com.
  40. News: How to get to the game . Boston Globe . September 10, 1995 . 93 . Newspapers.com.
  41. Web site: https://web.archive.org/web/20101126113350/http://mbta.com/riding_the_t/patriots/ . November 26, 2010 . New England Patriots 2010 / 2011 Football Trains to Gillette Stadium . Massachusetts Bay Transportation Authority.
  42. Web site: https://web.archive.org/web/20110907004258/http://www.mbta.com/riding_the_t/patriots/ . September 7, 2011 . New England Patriots 2011/2012 Football Trains to Gillette Stadium . Massachusetts Bay Transportation Authority.
  43. News: MBTA mulls asking state for $6m . Boston Globe . August 28, 1989 . Ackerman . Jerry . Newspapers.com.
  44. News: Notice to Bidders . Boston Globe . April 28, 1989 . 60 . Newspapers.com.
  45. News: Massachusetts Bay Transportation Authority Invitation for Bids . Boston Globe . March 5, 1991 . 69 . Newspapers.com.
  46. News: Pick of the Weekly . Boston Globe . September 20, 1992 . 11 . Newspapers.com.
  47. News: MBTA turns to solar arrays at South Shore train stations . Patriot Ledger . November 17, 2018 . Joe . DiFazio . January 21, 2021 . January 30, 2021 . https://web.archive.org/web/20210130072958/https://www.patriotledger.com/news/20181117/mbta-turns-to-solar-arrays-at-south-shore-train-stations . dead .
  48. Web site: Franklin Line Guild Street Bridge Rehabilitation . 2019 . Massachusetts Bay Transportation Authority.