Rail transport in Norway explained

Norway
Nationalrailway:Vy
Infrastructure:Bane NOR
Majoroperators:SJ Norge, SJ AB, Vy and Go-Ahead Norge
Ridership:40.401 million (2021)[1]
Passkm:1780 million (2021)[2]
Freight:37.55 million tonnes (2021)[3]
Notunnels:697
Longesttunnel:Blix Tunnel[4] [5]
Nobridges:2,760
Longestbridge:Minnesund Railway Bridge[6]
Highelevation:1237m (4,058feet)
Highelat:Finse

The Norwegian railway system comprises 4,109 km of (standard gauge) track of which 2,644 km is electrified and 274 km double track. There are 697 tunnels and 2,760 bridges.

The Norwegian Railway Directorate manages the railway network in Norway on behalf of the Ministry of Transportation. Bane NOR is a state enterprise which builds and maintains all railway tracks, while other companies operate them. These companies include Vy and subsidiaries Vy Gjøvikbanen and CargoNet, Flytoget, Go-Ahead, SJ Norge, Green Cargo, Grenland Rail and Hector Rail.

Norway is a member of the International Union of Railways (UIC). The UIC Country Code for Norway is 76.

History

See main article: History of rail transport in Norway. The first railway in Norway was the Hoved Line between Oslo and Eidsvoll and opened in 1854. The main purpose of the railway was to move lumber from Mjøsa to the capital, but passenger service was also offered. In the period between the 1860s and the 1880s Norway saw a boom of smaller railways being built, including isolated railways in Central and Western Norway. The predominant gauge at the time was (narrow gauge), but some lines were built in (standard gauge). The height of the era came in 1877 when the Røros Line connected Central Norway to the capital. In 1883 the entire main railway network was taken over by Norwegian State Railways (NSB), though a number of industrial railways and branch lines continued to be operated by private companies.

Three urban railways, in Oslo, Bergen and Trondheim, were started as in 1875 (Oslo), 1897 (Bergen) and Trondheim (1901). Oslo's system, as the only one, started with horse cars, the others were electrified from the beginning. Electric cars were introduced in Oslo in 1894 and the last horse car operated in 1900.

Bergen closed down its first generation system between 1944 and 1965, but (re-)introduced light rail transit (LRT) in 2006.

The second construction boom of the main railway arose in the 1910s and included the Bergen Line across Finse to Bergen, connecting Eastern and Western Norway. A number of other larger projects were also built in the 1920s, including a second line, the Dovre Line, to Trondheim. This period also saw the first electrified railways and a steady conversion from narrow gauge to standard gauge. Norway chose to electrify its network at .

During World War II there was a massive construction by the German Forces as part of creating Festung Norwegen, including large sections of the Nordland Line and the completion of the Sørland Line. After the war the main effort was to complete the Nordland Line (which reached Bodø in 1962) and the decision to electrify 50% of the network, a task not completed until 1970. This allowed the retirement of steam locomotives, which were replaced with electric engines like the El 11 and El 13 or the diesel powered Di 3. In 1966 Norway's only rapid transit, Oslo T-bane was opened, but in the same decade the Bergen tramway was closed. In the 1970s and 80s many branch lines were also abandoned.

In 1980 the massive project of connecting the eastern and western railway networks around Oslo was completed with the opening of the Oslo Tunnel and Oslo Central Station. In 1996 NSB was split into the Norwegian Railway Inspectorate, Jernbaneverket and an operating company NSB BA. Since then, the companies have been split into 10 separate corporations. In 1998 the first new line in 36 years was opened when the high-speed Gardermoen Line was opened to allow travel at 210 km/h between Oslo, Oslo Airport and Eidsvoll. The 1990s also saw the massive introduction of multiple units on passenger trains. In the 2000s the freight segment was deregulated and a number of freight companies have started competing with the NSB subsidiary CargoNet.

The national main routes in Norway are considered to be among the slowest in Europe,[7] and slower than parts of East Africa,[8] with average speeds below 80 km/h.

Network

Track

The main railway network consists of 4,087 km of lines, of which 262 km is double track and 60 km high-speed rail (210 km/h). In addition there is 225 km of urban railways, of which 218 km is double track. In addition there are some industrial tracks and minor branch lines and some abandoned and heritage railways. The entire main network is (standard gauge), as are the urban railways in Oslo and Bergen. Of the operational railways in Norway, only the Trondheim Tramway has a different gauge, the meter gauge, . Some heritage railways, though, operate with various kinds of narrow gauge.

The Kirkenes–Bjørnevatn Line used to be the northernmost railway in the world, but was in 2010 beaten by the Obskaya–Bovanenkovo Line in Russia. Still, Narvik is one of the northernmost towns in the world to have a railway connection, as the terminus for the Ofoten Line. It connects to Kiruna, Sweden, but not to Bodø, the northern terminus of the Norwegian railway network. Kiruna is, however, connected to the Swedish railway network, which again is connected to the Norwegian network at the Swedish stations of Charlottenberg, Storlien and Kornsjø.

Traction

2,622 km (64%) of the railway network is electrified, all of it at with overhead wires. The only sections that are not electrified are the lines north of Mjøsa, with the sole exception of the Dovre Line and the Ofoten Line. On non-electrified sections diesel locomotives are used. All of the urban railways use 600 or 750 V DC, via overhead wires on the tramways and via third-rail on the Oslo T-bane.

Future expansion plans

In its plans, Bane NOR will concentrate its expansions primarily on the cramped network around Oslo and the larger cities.

A new alignment between Larvik and Porsgrunn ca 23 km, cut 22 minutes of travel time. Double track between Drammen and Tønsberg is under construction and due by 2025. The plan is to make the whole line double tracked from Drammen to Porsgrunn.

Plans may include between Porsgrunn and Skorstøl, which would realign trains to southern Norway via Vestfold.

The Østfold Line is today double track both north and south of Moss, but in Moss 10 km remains as a single track bottleneck. Plans is to realign the railway through Moss, with double track through two tunnels.

Double track from Bergen to Arna. Later plans call for double track further east to Stanghelle and Voss.

Expanding the rest of the line between Eidsvoll and Hamar to double track by 2027. Realignment of Dovrebanen south of Trondheim may be done together with relocating of Trondheims freight terminal.

High speed rail

See main article: High-speed rail in Norway. The question about building a high-speed railway between the largest Southern Norwegian cities has been discussed at political level, and a report was ready by the end of 2007. Advocates for rail transport and environmentalists have wanted to build high speed railways, including upgrades to 250 km/h on the Sørland Line, Bergen Line, and Dovre Line while others, including Norsk Bane, have suggested construction of a new line through Haukeli to Stavanger, Haugesund and Bergen.

Heritage

There are also several operational museum railways in Norway, including the Krøder Line, Setesdal Line, Urskog–Høland Line, Thamshavn Line, Rjukan Line, Valdres Line, Nesttun–Os Railway and Old Voss Line. The Norwegian Railway Museum is located in Hamar and includes exhibits of train hardware, related objects, as well as document and photography archives.

Lines

Fully operational lines

Line nameTerminiLengthPowerOpenedOther info
Bergen LineHønefossBergen371 kmElectricOperated route Oslo S–Drammen–Bergen (495 km)
Flåm LineMyrdalFlåm20 kmElectricBranch to the Bergen Line
Randsfjord LineHokksundHønefoss54 kmElectricOperated as part of the Bergen Line
Bratsberg LineEidangerNordagutu47 kmElectricOperated route Porsgrunn–Notodden (incl. the Tinnos Line)
Eidanger–Skien operated as part of the Vestfold Line
Tinnos LineHjuksebøNotodden10 kmElectricOperated route Porsgrunn–Notodden as part of the Bratsberg Line
Dovre LineEidsvollTrondheim492 kmElectricOperated route Oslo S–Dombås–Trondheim (553 km)
Rauma LineDombåsÅndalsnes115 kmDieselOperated as branch to the Dovre Line
Drammen LineOslo SDrammen42 kmElectric
Asker LineSandvikaAsker15 kmElectricParallel line to the Drammen Line
Spikkestad LineAskerSpikkestad12 kmElectric
Branch to and originally part of the Drammen Line
Operated route Spikkestad–Oslo S–Lillestrøm
Gardermoen LineEtterstadEidsvoll64 kmElectricOperated route Oslo S–Lillestrøm–Gardermoen/–Eidsvoll
Gjøvik LineOslo SGjøvik123 kmElectric
Hoved LineOslo SEidsvoll84 kmElectric
Kongsvinger LineLillestrømCharlottenberg116 kmElectricOperated route Oslo S–Lillestrøm–Kongsvinger/–Sweden
Continues as Värmlandsbanan
Meråker LineHellStorlien70 kmDieselOperated route Trondheim–Hell–Meråker–Sweden
Continues as Mittbanan
Nordland LineTrondheimBodø734 kmDiesel
Ofoten LineNarvikBjørnfjell43 kmElectricContinues as Malmbanan
Røros LineHamarStøren382 kmDieselOperated route Oslo S–Hamar–Røros–Trondheim
Sørland LineDrammenStavanger549 kmElectricOperated route Oslo S–Kristiansand–Stavanger (588 km)
Arendal LineArendalNelaug36 kmElectric
Branch to the Sørland Line
Originally part of the Treungen Line
Vestfold LineDrammenEidanger138 kmElectricOperated route (Lillehammer–)Oslo S–Skien
Østfold LineOslo SKornsjø171 kmElectricOperated route Oslo S–Halden/–Sweden
Continues as Norway/Vänern Line
Follo LineOslo SSki22 kmElectric2022-12-11Parallel line to the Østfold Line
Eastern Østfold LineSki, NorwayRakkestad54 kmElectricOperated route Oslo S–Rakkestad

Freight only lines

Line nameTerminiLengthPowerOpenedOther info
Alnabru–Grefsen LineGrefsenAlnabru4 kmElectricConnecting the Hoved Line and Gjøvik Line
Brevik LineEidangerBrevik9 kmElectricBranch to the Vestfold Line
Dalane–Suldal LineDalaneSuldal1 kmElectricBypass to the Sørland Line
Loenga–Alnabru LineLoengaAlnabru3 kmElectricConnecting the Hoved Line and Østfold Line
Roa–Hønefoss LineRoaHønefoss34 kmElectricOperated as branch to the Bergen Line
Skøyen–Filipstad LineSkøyenFilipstad2 kmElectric
Branch to and originally part of the Drammen Line
Solør LineKongsvingerElverum88 kmDieselConnecting the Kongsvinger Line and Røros Line
Stavne–Leangen LineStavneLeangen6 kmDieselConnecting the Dovre Line and Nordland Line
Eastern Østfold LineRakkestadSarpsborg26 kmElectricAlternate for the Østfold Line

Lines with no regular traffic

Line nameTerminiLengthPowerOpenedDiscontinuedOther info
Nesttun LineBergenMinde4 kmElectricBranch to the Bergen Line
Hardanger LineVossPalmafoss3 kmElectricBranch to the Bergen Line
Kragerø LineNeslandsvatnMerkebekk6 kmDieselBranch to the Sørland Line
Namsos LineGrongNamsos52 kmDieselBranch to the Nordland Line
Numedal LineKongsbergRollag48 kmDieselBranch to the Sørland Line
Treungen LineNelaugSimonstad8 kmDieselBranch to the Sørland Line

Heritage railway

Line nameTerminiLengthPowerOpenedDiscontinuedOther info
Old Voss LineTunestveitMidttun22 kmSteamConnection to the Bergen Line
Krøder LineVikersundKrøderen26 kmSteamConnection to the Bergen Line
Tinnos LineNotoddenTinnoset30 kmElectricConnected by ferry
Connection to the Bratsberg Line
Rjukan LineMælRjukan16 kmElectric
Setesdal LineGrovaneRøyknes8 kmSteamConnection to the Sørland Line
Urskog–Høland LineSørumsandFossum4 kmSteam
Thamshavn LineBårdshaugSvorkmo22 kmElectric
Valdres LineEinaDokka47 kmDieselConnection to the Gjøvik Line

No traffic allowed

Line nameTerminiLengthPowerOpenedDiscontinuedOther info
Flekkefjord LineSiraFlekkefjord17 kmDieselBranch to the Sørland Line
Kragerø LineMerkebekkSannidal12 kmDieselBranch to the Sørland Line
Numedal LineRollagRødberg45 kmDieselBranch to the Sørland Line
Valdres LineDokkaBjørgo43 kmDieselBranch to the Gjøvik Line

Urban railways

Railway links with adjacent countries

Sweden is the only country with which Norway shares railway borders. Sweden and Norway share gauge, loading gauge, signaling system, electric system, GSM-R and automatic trains stop systems. Most rolling stock can cross the border. There are four border crossings: the Østfold LineNorway/Vänern Line, the Kongsvinger LineVärmland Line, the Meråker LineCentral Line and the Ofoten LineIron Ore Line. All crossings have electric traction on the Swedish side, but the Meråker Line lacks it on the Norwegian side. There have previously been operational train ferries to Denmark.

There are proposals to connect Northern Norway to Finland (the planned Arctic Railway) and Russia. At Kirkenes, the Kirkenes–Bjørnevatn Line is proposed to be connected to Russia's Murmansk–Nikel Railway,[10] and the line is also proposed for connection to the Finnish network in Rovaniemi (there has been a line between Rovaniemi and the Murmansk railway).[11] [12] Russia has generally dismissed this proposal in favour of using Russian ports instead of Kirkenes. Another proposal has been to build a line from Kolari to Skibotn and Tromsø,[13] even if connecting to the existing line to Narvik is the main suggestion.

Operation

Railway companies

Traditionally, all trains were operated by Vy (formerly NSB), but the deregulation in the 2000s has led to the introduction of a number of new freight operators, including CargoNet, Hector Rail, Tågåkeriet and Ofoten Line. The conservative-liberal government tried to introduce public service obligation bids on subsidized passenger routes in 2005, but the contract was won by the NSB subsidiary NSB Anbud and the following red-green government has cancelled further PSO contracting. Also the Airport Express Train has been made a separate company.

In 2017 Norway's Ministry of Transport and Communications decided to develop tenders for the operation of passenger rail services. On 4 February 2018, it launched a tender to deliver Traffic Package 1 that will commence on 15 December 2019, comprising long-distance services on the Sørlandet Line from Oslo to Stavanger.[14] In October 2018 this package was awarded to Go-Ahead Norge.[15]

In March 2018, the Norwegian Railway Directorate launched tenders for Traffic Package 2, passenger services on the Røros Line, Meråker Line, Rauma Line, and Nordland Line, plus regional services in Trøndelag county.[16] SJ will commence operating the package on 7 June 2020.[17]

On 21 December 2018, the Norwegian Railway Directorate launched tenders for Traffic Package 3, passenger services on the Oslo to Bergen line starting on 13 December 2020.[18]

Passenger services

RouteLine(s)StationsTractionOperator
F1 Oslo SCharlottenberg [– [[Stockholm Central Station|Stockholm C]]] Electric SJ 5
L1 Electric Vy 4
Electric Flytoget 4
Electric Flytoget 2
RE10 DrammenOslo SOslo AirportEidsvollHamarLillehammer (– Dombås)Electric Vy 1
RE11 Electric Vy 1
R12 Electric Vy 1
R13 Electric Vy 2
R14 Electric Vy 1
L2 Electric Vy 4
RE20 Oslo SSkiMossHalden Station [(– [[Gothenburg Central Station|Gothenburg C]])] Electric Vy 1
R21 Electric Vy 2
R22 Oslo SSkiMysen (– Rakkestad) Electric Vy 1
RE30 Electric Vy 1
R31 Oslo SHakadal (– Jaren) Electric Vy 1
F4 Electric Vy 5
Electric Vy 2
BergenArnaVoss (– Myrdal) Electric Vy 1
R45 Electric Vy
F5 Electric Go-Ahead
Stavanger StationSkeiane (– NærbøEgersund) Electric Go-Ahead 4
R50 Electric Go-Ahead
R55 Electric Vy
F6 Electric SJ 6
R60 HamarRørs (– StørenTrondheim S) Diesel SJ
R65 Diesel SJ 4
F7 Diesel SJ 3
Mixed SJ 1
R71 Diesel SJ 2
R75 Diesel SJ
F8 Electric Vy 2

Passenger rolling stock

Until the 1990s only commuter and regional trains were operated with multiple units, but since then Vy has ordered numerous multiple units for its regional and express lines. Express trains are operated with 16 BM 73 units with tilting technology, regional trains with 16 BM 70, 6 BM 73b (both electric) and 15 BM 93 (diesel) units while the local trains are operated by 71 BM 69 and 36 BM 72 (both electric) while the local trains around Trondheim, Trøndelag Commuter Rail, uses 14 BM 92 diesel multiple unit. The Airport Express Train uses 16 BM 71 and Vy Gjøvikbanen operates 9 BM 69g units. The Ofoten Line operates three BM 68 electric multiple units.

Vy still uses locomotive hauled passenger trains on a few of the long-distance lines. For this task they use 22 El 18s and 5 Di 4s in addition to six El 17 on the Flåm Line. Most of the cars are B7 on long-distance services and B5 on regional services. Most of the locomotives have been transferred to the freight division CargoNet.

Freight rolling stock

CargoNet uses a combination of 30 El 14, 15 El 16, 19 Di 8 and 6 CD66. The other companies use stock retired by NSB, including the Ofoten Line's 7 El 13, 5 Di 3 and 2 T43, HectorRail's 6 El 15 (now known as 161) and Tåkåkeriet's Rc2.

Abandoned railways

See Chronology of Norwegian railway lines.

Abandoned urban railways

See also

External links

Notes and References

  1. Web site: Passenger transport by rail . no . Ssb.no . 2022-06-23 . 2022-06-28.
  2. Web site: Passenger transport by rail . no . Ssb.no . 2022-06-23 . 2022-06-28.
  3. Web site: Transport of goods by rail . no . Ssb.no . 2022-06-23 . 2022-06-28.
  4. Web site: Tunnelen - Bane NOR . www.banenor.no . 11 December 2022 . no.
  5. News: Snart skal togene suse i 200 km/t gjennom Nordens lengste togtunnel . 11 December 2022 . www.aftenposten.no . nb.
  6. Web site: Jernbanebroer . no . broer.no . 2022-01-01 . 2022-06-28.
  7. Web site: Norske tog blant Europas tregeste. 7 September 2017. 28 September 2021. nb. Norwegian Broadcasting Corporation.
  8. Web site: Norske tog sakker akterut. 16 October 2018. 28 September 2021. nb. Dagsavisen.
  9. Web site: Prosjekter . Jernbaneverket. no . 2007-04-09. 2015-12-18 . https://web.archive.org/web/20151218023719/http://www.jernbaneverket.no/Prosjekter/ . dead .
  10. Web site: Kirkenes RailPort May 2003 . World Port Kirkenes . 2003 . 27–33 . 20 February 2012 . 9 May 2004 . https://web.archive.org/web/20040509024154/http://www.wpk.no/Rapport.pdf . live.
  11. News: Jernbane Kirkenes - Rovaniemi? . 4 September 2009 . . no . 21 February 2012 . 7 September 2009 . https://web.archive.org/web/20090907033637/http://www.finnmarkdagblad.no/nyheter/article4562805.ece . live.
  12. Web site: Forstudie Jernbaneforbindelse Kirkenes – Rovaniemi . . 20 February 2012 . 4 March 2016 . https://web.archive.org/web/20160304082836/http://img2.custompublish.com/getfile.php/1287594.652.aqqyusbbbs/Forstudie+jernbane+Rovaniemi+-+Kirkenes.pdf?return=www.svk.no . live.
  13. News: Finland positiv til jernbane . . Mortensen . Martin . Nilsen . Kari Stokke . no . 20 September 2011 . 21 February 2012 . 22 September 2012 . https://web.archive.org/web/20120922215348/http://www.nrk.no/nyheter/distrikt/troms_og_finnmark/1.7784883 . live.
  14. Web site: Norway launches tenders for passenger services . Barrow . Keith . 4 February 2018 . . 7 January 2019 .
  15. Web site: Go-Ahead Nordic signs historic contract in Norway . Burroughs . David . 2 November 2018 . International Railway Journal . 7 January 2019 .
  16. Web site: Tendering begins for train services in northern Norway . Barrow . Keith . 15 March 2018 . International Railway Journal . 7 January 2019 .
  17. https://web.archive.org/web/20190617135041/https://www.railwaygazette.com/news/passenger/single-view/view/sj-wins-north-norway-operating-contract.html SJ wins north Norway operating contract