North Tarrant Express Explained

State:TX
Maint:NTE Mobility Partners
North Tarrant Express
Map Custom:yes
Map Notes:North Tarrant Express highlighted in red
Length Mi:13.5
Length Ref:[1]
Length Round:1
Established:2010
Direction A:West
Direction B:East
Terminus A: in Fort Worth
Junction: in Fort Worth, Haltom City, and North Richland Hills
Terminus B: in Fort Worth

The North Tarrant Express (NTE) project is a total highway reconstruction of the Interstate 820 (I-820) and State Highway 121/State Highway 183 (SH 121/SH 183, Airport Freeway) corridor between I-35W and Industrial Boulevard in Northeast Tarrant County, Texas. The NTE and the Texas Department of Transportation (TxDOT) anticipate the new highway system will relieve traffic congestion, improve safety on its roadways and have integrated plans for the anticipated traffic growth in one of the country’s fastest developing regions.[2] When the improvements are completed, the $2.5 billion North Tarrant Express will have upgraded main highway lanes, continuous frontage roads, and 13.3miles of newly added tolled managed lanes (TEXpress Lanes).[3]

Construction began in late 2010 and was scheduled to be completed before the end of 2014, at least six months ahead of schedule.[4]

Also included in the North Tarrant Express' scope is the 10miles of I-35W from north of I-30 (Downtown Fort Worth) to the I-820 interchange. The project will provide over $1.5 billion of needed infrastructure to the Fort Worth area.[5]

The NTE project is completely reconstructing and upgrading existing general highway lanes. It is also improving and expanding frontage lanes to double the existing capacity. Moreover, adding TEXpress managed lanes, or tolled express lanes, is designed for commuters seeking the most reliable and time-saving trip. The variable tolls are based on travel time with a minimum goal to maintain a 50 mph traffic flow on the highway; motorists can choose to use general highway lanes or tolled express lanes depending on their traveling objectives.[6]

History

A study by the free-market Reason Foundation in 2009 that focused on 11 metro areas, showed that North Texas would have a huge economic boost by alleviating traffic congestion, calculating the extra productivity from better movement of people and goods around the region. Wise infrastructure investments that eliminate gridlock and produce free-flowing road conditions will more than pay for themselves by boosting the region’s economy, and thus tax revenues to maintain the mobility.[7]

The Dallas–Fort Worth metroplex (DFW) was singled out in the study due to its poor showing in congestion indexes and ranked poorly in many indexes in the annual mobility study by the Texas Transportation Institute. The Reason study says the biggest economic gains would come from eliminating severe congestion, which could add $46 billion a year to the regional economy and over $3 billion in annual tax revenues.[8] Dallas is the fourth fastest-growing city in the country.[9]

For the 150,000+ cars a day that travel through the I-820 and SH 121/SR 183 corridor, drivers are no stranger to some of the bottlenecks that cause these delays. As one of the region's most important corridors, this stretch of highway has not kept up with the growth and North Texas' nearly seven million residents.[10] Dallas/Fort Worth commuters spend an average of two days a year stuck in traffic—the fifth-highest in the nation.[11]

On January 29, 2009, the Texas Transportation Commission voted 5–0 to hire Cintra's NTE Mobility Partners to rebuild phase 1 of North Tarrant Express corridors.[12]

Route description

NTE Project (1 & 2W)

On June 23, 2009, TxDOT awarded a comprehensive development agreement (CDA) for the North Tarrant Express project to NTE Mobility Partners. This concessions includes the design, development, construction, finance, maintenance, and operation of Segment 1 (West) and Segment 2 (East) for the duration of 52 years.[13]

West Segment

The West Segment (I-820) is 6.4miles in length and runs from I-35W on the west to the North East Mall interchange on the east across three cities (Fort Worth, Haltom City and North Richland Hills). This segment includes 9 cross-street bridges and 21 on-ramps/off-ramps.

East Segment

The East Segment (SH 121/SR 183) is 6.9miles in length and runs from the North East Mall interchange on the west to Industrial Boulevard in the east, across four cities (North Richland Hills, Hurst, Bedford and Euless). This segment includes 9 cross-street bridges and 31 on- or off-ramps).

I-35W Project

A construction agreement with TxDOT has initiated construction on Segments 3A (I-35W from downtown Fort Worth) & 3B (I-35W from I-30 to U.S. 287). Segment 3A has an expected completion date in 2018 and 3B in 2017. The I-35W project is the next part of the North Tarrant Express. It is divided into three segments:[14]

Partners

The North Tarrant Express is a collaboration of private and public partners (P3 or PPP), including TxDOT and the North Central Texas Council of Governments (NCTCOG).[14]

The NTE is being designed, built, financed, operated and maintained by NTE Mobility Partners, which is working in close collaboration with TxDOT and local communities. This important highway project will be wholly owned by TxDOT.

Pursuant to the additional agreement between TxDOT and NTE Mobility Partners Segments 3 LLC (NTEMP3), the developer (NTEMP3) will design, build, operate and maintain segment 3A (35W). TxDOT will build segment 3B (35W), from north of Loop 820 to U.S. 287, and will then turn it over to NTEMP3 who will be responsible for the operations and maintenance. NTEMP3 will also collect tolls generated on the managed toll lanes of the facility until 2061 paying off the PAB's, TIFIA loan, private equity partners and then sharing profits with TxDOT.[5]

Developer

NTE Mobility Partners LLC is a company with three shareholders, including Cintra, a world leader in private-sector development of transportation infrastructure; Meridiam, a global public-private partnership investor/developer of public facilities; and the Dallas Police and Fire Pension System, the first U.S. pension fund in the country to invest in the building and maintenance of a major toll road project like NTE.[17]

External links

Notes and References

  1. Web site: Staff . Project Timeline . NTE Mobility Partners . December 12, 2014.
  2. Web site: Staff . July 28, 2011 . North Tarrant Express: Meeting the Needs of North Texas Commuters . PDF . NTE Mobility Partners . December 12, 2014.
  3. Web site: Staff . About the NTE . NTE Mobility Partners . December 12, 2014.
  4. News: A. Lee . Graham . April 16, 2014 . North Tarrant Express Remains Ahead of Schedule . Fort Worth Business Press . December 12, 2014 .
  5. Web site: Patricia . de la Peña . September 19, 2013 . NTE Segments 3A & 3B Project Reaches Financial Close . Infra Insight Blog . Nossaman LLP . https://web.archive.org/web/20140715025447/http://www.infrainsightblog.com/tags/nte-mobility-partners-segments/ . July 15, 2014.
  6. Web site: Fort Worth District . TxDOT Project Tracker: North Tarrant Express (NTE) . . December 12, 2014.
  7. Web site: David T. . Hartgen . M. Gregory . Fields . amp . August 27, 2009 . Gridlock and Growth: The Effect of Traffic Congestion on Regional Economic Performance . Reason Foundation . Policy Study 371 . December 12, 2014.
  8. News: Rodger . Jones . August 28, 2009 . Ending Traffic Congestion Would Boost DFW Economy by $17 Billion, Report Says . Transportation Blog . The Dallas Morning News . December 12, 2014.
  9. News: Erin . Carlyle. February 14, 2014 . America's 20 Fastest-Growing Cities . . December 12, 2014.
  10. Web site: Top Metropolitan Areas . June 13, 2014 . dead . https://web.archive.org/web/20140529015756/http://www.ntc-dfw.org/northtexas/poplargestmetro.html . May 29, 2014 .
  11. Web site: Tim . Lomax . David . Schrank . Bill . Eisele . amp . InconsIstent TraffIc CondItIons ForcIng Texas Commuters to Allow Even More Extra TIme . Texas A&M Transportation Institute . December 12, 2014.
  12. News: Michael A. . Lindenberger . January 30, 2009 . Private Toll Lanes, Free Highways Merge First in Tarrant Project . The Dallas Morning News . TTC News Archives.
  13. Web site: Office of Innovative Program Delivery . Project Profiles: North Tarrant Express Segments 1 and 2A . . December 12, 2014.
  14. Web site: Staff . North Tarrant Express . Texas Department of Transportation . December 12, 2014.
  15. Web site: Robert . Hinkle . Tony . Hartzel . amp . Infrastructure Projects: Interstate 35W . City of Fort Worth, Texas . December 12, 2014.
  16. Web site: I-35W Corridor .
  17. Web site: Staff . North Tarrant Express Mobility Partners . Cofiroute USA . December 12, 2014.