Bethesda Trolley Trail Explained
Bethesda Trolley Trail |
|
Length Mi: | 5.9 |
Difficulty: | Easy, level, ADA accessible |
Season: | Year-round |
Months: | Year-round |
Surface: | Asphalt |
The Bethesda Trolley Trail, at one time known as the North Bethesda Trail, is a 5.9miles rail trail in southern Montgomery County, Maryland. It runs from Bouic Avenue next to the Twinbrook Metro Station in the city of Rockville to Battery Lane Park in Bethesda.[1] [2]
The trail runs primarily on the abandoned right-of-way of the streetcar line that connected Bethesda to Rockville, but also partially on roads, sidewalks, and side paths.
History
In 1891, the Tennallytown (Tenleytown) and Rockville Railroad began operations along a line that came north to Bethesda on Wisconsin Avenue, turned left on Old Georgetown Road, and terminated at Bethesda Park, a 50-acre amusement park built by the railroad on the west side of Old Georgetown Road between the modern-day streets of Cedar and Greentree Road.[3] [4] By 1900, the Washington and Rockville Electric Railway had laid tracks from the T&R's terminus to Rockville, though full operation would begin only in 1904.[5] [6] Streetcars stopped running to Rockville in 1935, when the service was converted to buses.[7] Some of the right-of-way then sat fallow for decades.
Building a trail on the unused part of the right-of-way was first suggested in Montgomery County's 1978 Countywide Bikeways Master Plan. Design of the trail began in the early 1990s. Construction was held up for many years by opposition from neighbors and lack of funding.[8] Funding for the bridges over I-495 and I-270 was approved in 1999.[9]
Construction of the trail began in fall of 2000 and lasted nearly a decade.[10] [11] [12] Money to rebuild existing sections of the trail was diverted to the Forest Glen Metro overpass project, delaying work on the trail. Work was further delayed by the bridge fabrication.[13] Bridges over I-495 and I-270 opened in 2002 and 2003 respectively, adding to narrow, discontinuous sections that existed before 2002 between Nicholson Lane and Beech Avenue.[14] [15] Paving and building the missing trail segments from the Old Georgetown Pike/Cedar Lane intersection to the intersection of Randolph Road with Rockville Pike began in November 2005, and continued into 2006.[16] Between Charles Street and Cedar Lane and north of Nicholson Lane, the trail was on sidewalks. Around the same time, the National Institutes of Health (NIH) built a trail along the south edge of their facility, which connected Rugby Avenue to the sidewalk along Old Georgetown Road. In 2008, the new sections of the trail, including the sidewalks, received signage.[17] As part of the Montrose Parkway West project in 2009, a section of trail — a side path along Rockville Pike — was constructed from Per Sei Place to Hubbard Drive, north of the White Flint Metro Station. That section connected to a path built along Montrose Parkway at the same time.
39.0156°N -77.1119°W
External links
Notes and References
- Web site: Bethesda Trolley Trail . 2009 . Montgomery County Department of Transportation (MCDOT) . Rockville, MD . Brochure.
- Web site: Bethesda Trolley Trail Map . 2009 . MCDOT.
- Web site: Hopkins . G.H. . 1894 . The vicinity of Washington, D.C. . live . https://web.archive.org/web/20230906060241/https://www.loc.gov/resource/g3850.ct003624/ . 2023-09-06 . 2023-09-06 . Library of Congress, Washington, D.C. 20540 USA.
- Allman . William G. . August 1991 . Bethesda Park: "The Handsomest Park in the United States" . live . The Montgomery County Story . 34 . 3 . https://web.archive.org/web/20230906060724/http://montgomeryhistory.org/wp-content/uploads/2016/09/Vol34No3_MCStory.pdf . 2023-09-06 . 2023-09-06.
- Web site: November 2002 . The Trolley Era in Rockville, 1900-1935 . live . https://web.archive.org/web/20230818192955/https://peerlessrockville.org/historic-rockville/rockvilles-past/the-trolley-era-in-rockville-1900-1935/ . 2023-08-18 . 2023-09-06 . Peerless Rockville . en-US.
- Book: MacMaster . Richard Kerwin . A Grateful Remembrance: The Story of Montgomery County, Maryland . Hiebert . Ray Eldon . 1996-11-01 . Innovation Game . 978-0-9643819-8-8 . 224 . en . 2023-09-06 . https://web.archive.org/web/20240207054315/https://books.google.com/books?id=G95ZAAAACAAJ . 2024-02-07 . live.
- Web site: 2022-05-15 . Then & Now: Tenallytown & Rockville Pike Trolley Line . live . https://web.archive.org/web/20230828053842/https://reedbrothersdodgehistory.com/2022/05/15/then-now-tenallytown-and-rockville-pike-trolley-line/ . 2023-08-28 . 2023-08-28 . Reed Brothers Dodge History 1915 – 2012 . en.
- News: Saffir . Barbara A. . Bethesda Neighbors seek detour for bike trail . The Washington Post . 19 June 1997.
- News: Trail to Get Bridges for Beltway, I-270 . The Washington Post . 1 December 1999.
- News: Otto . Mary . For Bicyclists, an Easier Commute; Expanded Path Network, Loaner Program Planned . The Washington Post . 17 August 2000.
- News: Schaffer . Ron . Out-of-Sequence Traffic Signals Frustrate Route 29 Commuter . The Washington Post . 2 November 2000.
- Web site: North Bethesda Trail Aug 2001 Status . https://web.archive.org/web/20010824082347/http://bikewashington.org/trails/bethesda/bethesda.htm . dead . 24 August 2001 . 4 June 2020.
- Web site: I-495 North Bethesda Bridge August 2002 . https://web.archive.org/web/20020823195316/http://engineering.dpwt.com/ProjectsMain/ped_northbethesda_I495/northbethesda_I495.htm . dead . 23 August 2002 . 4 June 2020 .
- Web site: North Bethesda I-495 Bridge . https://web.archive.org/web/20030509110614/http://engineering.dpwt.com/ProjectsMain/ped_northbethesda_I495/northbethesda_I495.htm . dead . 9 May 2003 . 4 June 2020.
- Web site: North Bethesda Trail Bridge over 270 . https://web.archive.org/web/20030804200836/http://engineering.dpwt.com/ . dead . 4 August 2003 . 9 June 2020.
- Web site: The North Bethesda Trolley Trail . https://web.archive.org/web/20060810110010/http://www.montgomerycountymd.gov/pedtmpl.asp?url=%2Fcontent%2Fdpwt%2Fcapital%2Fpedbike%2Fworks.asp . dead . 10 August 2006 . Montgomery County Department of Public Works and Transportation (MCDPWT).
- Web site: Projects Underway, Coming Up and Completions . https://web.archive.org/web/20080523142459/http://www.montgomerycountymd.gov/pedtmpl.asp?url=%2Fcontent%2Fdpwt%2Fcapital%2Fpedbike%2Fworks.asp . March 2008 . MCDPWT . dead . 23 May 2008.