North American Electric Reliability Corporation Explained

North American Electric Reliability Corporation
Map2:NERC-RE-map.png
Map2 Caption:The six Regional Entities (2021)
Abbreviation:NERC
Founding Location:Atlanta, Georgia
Type:Nonprofit corporation
Status:501(c)(6)
Tax Id:20-4821888
Headquarters:Atlanta, Georgia, U.S.
Coords:33.8474°N -84.3667°W
Region:Contiguous United States, Canada and a portion of Baja California in Mexico
Membership:1,900+[1]
Membership Year:2015
Board Of Directors:
  • Roy Thilly
  • Janice B. Case
  • Jim Robb
  • Robert G. Clarke
  • Kenneth W. DeFontes Jr.
  • Frederick W. Gorbet
  • David Goulding
  • George S. Hawkins
  • Suzanne Keenan
  • Robin E. Manning
  • Jan Schori
  • Colleen Sidford
Leader Title:President & CEO
Leader Name:Jim Robb
Leader Title2:Senior Vice President
Leader Name2:Mark Lauby
Leader Title3:Sr. VP, CFO, & Treasurer
Leader Name3:(Vacant)
Leader Title4:Sr. VP & CSO
Leader Name4:Bill Lawrence
Subsidiaries:
Budget: $66.6 million[2]
Budget Year:2015
Staff:198[3]
Staff Year:2015
Purpose:To ensure the reliability of the bulk power system in North America, including the continental United States and Canada, and the northern portion of Baja California, Mexico.
Formerly:North American Electric Reliability Council

The North American Electric Reliability Corporation (NERC) is a nonprofit corporation based in Atlanta, Georgia, and formed on March 28, 2006, as the successor to the North American Electric Reliability Council (also known as NERC). The original NERC was formed on June 1, 1968, by the electric utility industry to promote the reliability and adequacy of bulk power transmission in the electric utility systems of North America. NERC's mission states that it "is to assure the effective and efficient reduction of risks to the reliability and security of the grid".[4]

NERC oversees six regional reliability entities and encompasses all of the interconnected power systems of Canada and the contiguous United States, as well as a portion of the Mexican state of Baja California.

NERC's major responsibilities include working with all stakeholders to develop standards for power system operation, monitoring and enforcing compliance with those standards, assessing resource adequacy, and providing educational and training resources as part of an accreditation program to ensure power system operators remain qualified and proficient. NERC also investigates and analyzes the causes of significant power system disturbances in order to help prevent future events.

NERC's standards for generating resources require that sufficient generating capacity be provided such that customers will need to be disconnected less often than once every ten years.[5] These standards are mandatory for only some of the regional entities.

Origins

Originally formed as a voluntary organization in 1968 by the electricity industry and called the National Electric Reliability Council, the name was changed to include "North American" in place of "National" in 1981 in recognition of Canada's participation and the broader scope of NERC's footprint. The name was changed from "Council" to "Corporation" in 2007.

In 2000, NERC established the Electricity Sector Information Sharing and Analysis Center, which provides industry with timely responses and alerts on cyber and physical security threats that have the potential to impact the bulk power system. The ES-ISAC, which changed its name in 2015 to Electricity Information Sharing and Analysis Center, shares timely information with industry through its secure web portal.

In August 2003, North America experienced its worst blackout to date, as 50million people lost power in the Northeastern and Midwestern United States and Ontario, Canada. A United States–Canada Power System Outage Task Force was formed to investigate the causes of the blackout and to make recommendations to prevent future blackouts.

The Energy Policy Act of 2005 (US) called for the creation of an Electric Reliability Organization (ERO) to develop and enforce compliance with mandatory reliability standards in the United States. This non-governmental, "self-regulatory organization" was created in recognition of the interconnected and international nature of the bulk power grid.

In April 2006, NERC applied for and was granted the designation of the ERO by FERC in July 2006. NERC also filed the first set of mandatory Reliability Standards with FERC, as well as filing the same information with the Canadian provincial authorities in Alberta, British Columbia, Manitoba, New Brunswick, Nova Scotia, Ontario, Quebec, Saskatchewan, and with the National Energy Board of Canada.

About NERC

Electricity Information Sharing and Analysis Center

NERC also operates the Electricity Information Sharing and Analysis Center (E-ISAC). E-ISAC offers security services to bulk power system owners and operators across North America. E-ISAC services includes specific cyber and physical security threat intelligence, tailored cyber security knowledge and physical security collaboration. The E-ISAC, which NERC established at the request of the U.S. Department of Energy, works closely with NERC's Bulk Power System Awareness team in Atlanta to monitor real-time cyber and physical security threats to the grid.

The E-ISAC, through capabilities including its Cybersecurity Risk Information Sharing Program (CRISP), works with critical asset owners and operators to analyze real-time cyber and physical security data for patterns of incidents with the potential to affect the bulk power system. NERC has a "firewall" separating the E-ISAC and NERC's compliance and enforcement activities. The separation extends to a physical separation of the E-ISAC from the rest of NERC.

Interconnections and regional entities

Interconnections

Regional entities

See main article: Regional Entity.

NERC authority

As part of the fallout of the Northeast Blackout of 2003, the Energy Policy Act of 2005 authorized the Federal Energy Regulatory Commission (FERC) to designate a national Electric Reliability Organization (ERO). On July 20, 2006, FERC issued an order certifying NERC as the ERO for the United States.

In September 2018, the Federal Energy Regulatory Commission (FERC) and NERC opened a joint investigation into a "winter load event" earlier in January that stressed the electrical grids in the Midwest. On January 17, Midwest and U.S. south central grid operators ordered emergency appeals for electricity conservation. This was due to high power demand caused by cold weather.[6]

See also

External links

Notes and References

  1. Web site: NERC Membership List. North American Electric Reliability Corporation. 29 October 2015. 2015.
  2. Web site: 2015 NERC Budget. NERC. 29 October 2015. 7. 13 August 2014.
  3. Web site: NERC Staff. NERC Roster. North American Electric Reliability Corporation. 30 October 2015. 44–65. 9 October 2015. PDF.
  4. Web site: NERC . June 22, 2023 .
  5. Loehr, George C. (August 16, 2021). "Federal Standards Should Also Apply to PNM Merger". Albuquerque Journal (Albuquerque, New Mexico). p. A9.
  6. News: FERC, NERC Open Inquiry into Winter Load Event that Stressed Midwest Grids . Bade . Gavin . 2018-09-13 . Utility Dive . 2018-09-13 .