Lakvijaya Power Station | |
Location Map Zoom: | 8 |
Country: | Sri Lanka |
Location: | Puttalam |
Owner: | Government of Sri Lanka |
Operator: | Ceylon Electricity Board |
Employees: | About 1000 |
Ps Units Operational: | 3 × 300 MW |
Ps Electrical Capacity: | 900 MW |
Ps Annual Generation: | 2200 GWh |
The Lakvijaya Power Station (Sinhala; Sinhalese: ලක් විජය බලාගාරය|translit=Lak Vijaya Balāgāraya) (also known as the Norochcholai Power Station (Sinhala; Sinhalese: නොරොච්චෝලෙ ගල් අඟුරු බලාගාරය|translit=Noroccōle Gal An̆guru Balāgāraya; Tamil: நுரைச்சோலை அனல்மின் நிலையம்|translit=Nuraiccōlai Aṉalmiṉ Nilaiyam), after its location) is the largest power station in Sri Lanka.
The power station is in Norocholai, Puttalam, on the southern end of the Kalpitiya Peninsula. Construction of the facility began on 11 May 2006, with the first unit commissioning on 22 March 2011.[1] The first phase was completed and ceremonially commissioned by President Mahinda Rajapaksa on, with the presence of Minister of Energy Champika Ranawaka, deputy Minister of Energy Premalal Jayasekara.[2] [3]
According to the Ceylon Electricity Board, the generates nearly of electricity annually — a significant amount when compared to Sri Lanka's total production of in 2011. The plant is connected to the grid via 1150NaN0 220-kilovolt transmission line to Veyangoda. Power station exhausts are emitted through a 1500NaN0 tall chimney, one of the country's tallest man-made structures.[1]
During its pre-development stages, protests were launched by residents living at the project site, claiming that they were deceived by the government.[4]
Since its creation the power plant has faced several breakdowns.[5] It has been alleged by the Power and Renewable Energy Deputy Minister, Ajith P. Perera, that the power plant was built with substandard and outdated material and is below international standards, and that the government is unable to claim any damages as the Rajapaksa government agreed to use the materials specified in the agreement which are sub-standard.[6]
In the plant, the electricity is produced using a steam turbine which is capable of producing 300MW. Coal is used as the fuel to produce steam that will then be used to rotate the turbine at a speed of 3000 rpm. The coal is imported from Indonesia. The coal in India is cheaper as compared with Indonesia, but Indonesian coal is used since the Indian coal contains more sulfur. Despite this, the vessels that carry coal come from a Russian port.[14]
At first the coal is brought from Indonesia via ships (65 tons per ship). The ships are anchored around 5 km from shore. This coal is brought in to the plant by using barges (long flat-bottomed boats) and then by conveyors.
The coal should be maintained around 10% moisture content immediately before it is used. It needs to be ground as powder before it is burnt. There are five "mills" that pulverize (grind) the coal. Four ball mills work at a time while another one is in standby.