Nishi-Kyūshū Expressway Explained

Country:JPN
Nishi-Kyūshū Expressway
Alternate Name: 西九州自動車道
Length Km:150
Established:1988
Cities:Karatsu, Imari, Matsuura
Sasebo
Terminus B:Takeo Junction in Takeo
Nagasaki Expressway

The is one of the expressways of Japan which goes from Fukuoka to Takeo running through the prefecture of Saga and the northern half of the Nagasaki prefecture. The total length is 150 km.

Part of the road is specified as Route 497. This road has two toll zones. The Fukuoka and Maebaru toll zone is managed by Fukuoka Prefectural Road Public Corporation. The Takeo and Sasebo toll zone is managed by West Nippon Expressway Company. The other roadway is managed by MLIT. This road is connected to Fukuoka Expressway Circular Route in Nishi-ku, Fukuoka, and to Nagasaki Expressway in Takeo. From Nijō to Nijō Shika Interchange this expressway overlaps a section of Nijō Hamatama road.

Overview

The first section of the expressway was opened to traffic in 1988. As of April 2016 the expressway was incomplete in many areas. The next sections were scheduled to open in 2017 (Minamihata Taniguchi Interchange to Imari Higashi Interchange) and (Imabuku Interchange to Tsukinokawa Interchange). After this, most of the incomplete areas were to be built according to the New Direct Control System, whereby the burden for construction costs will be shared by the national and local governments and no tolls were to be collected. Currently the section between Nijō Shikaka Interchange and Minamihata Taniguchi Interchange, Yamashiro Kubara Interchange and Imabuku Interchange, and Saza Interchange and Sasebo Daitō Interchange operates according to this principle.

The expressway is four lanes wide from Fukushige Junction to Higashi Intersection (temporary interchange) and Saza Interchange to Sasebo Chūō Interchange, and two lanes for all remaining sections.

History

Interchanges

No.NameConnectionsDist.
from
Origin
Bus
stop
NotesLocation
JCTFukushige JCT0.0FukuokaNishi-ku, Fukuoka
Jyūrokuchō IC (Imajuku Road)0.8Sasebo-bound entrance
2.0Sasebo-bound exit
TB/PAFukuoka Nishi TB/PA2.1
Imajuku IC (Imajuku Road)3.5For Fukuoka only
Susenji IC6.6For Sasebo only
TBMaebaru TB12.1Itoshima
Maebaru IC12.6For Fukuoka only
Higashi Intersection (temporary interchange) (Imajuku Road)
Pref. Route 573 (Hon Kafuri Teishajō Route)
14.2
Nijō ICPref. Route 49 (Onojō Nijō Route)Planned
Planned route
Through to Nijō Hamatama Road
Nijō Shikaka IC0.0
Hamatama IC3.8SagaKaratsu
Karatsu ICPref. Route 40 (Hamatama Ōchi Route)
Pref. Route 258 (Handa Onizuka Route)
Saga Karatsu Road (planned)
10.4
Karatsu Chichika Yamada ICPref. Route 320 (Chichika Kōda Route)14.9
Kitahata ICPref. Route 50 (Karatsu Kitahata Route)18.4
Minamihata Taniguchi ICPref. Route 297 (Shioya Omagari Route)23.2Imari
Imari Hagashi IC28.5
Planned route
Imari Naka ICPlanned
Imari Nishi ICPlanned
Kusuku ICPref. Route 5 (Imari Matsuura Route)Planned
Yamashiro Kubara IC0.0
Imabuku IC5.5NagasakiMatsuura
Tsukinokawa IC8.1For Fukuoka only
Matsuura IC (Matsuura Bypass)10.3
Planned route
Hirado Mikuriya Emukae ICPlannedNagasakiSasebo
Emukae Shikamachi ICPlanned
8Saza IC38.9Saza
7Ainoura Nakazato ICPref. Route 11 (Sasebo Hino Matsuura Route)34.9Sasebo
6Sasebo Chūō ICPref. Route 11 (Sasebo Hino Matsuura Route)29.9
5Sasebo Minato ICPref. Route 11 (Sasebo Hino Matsuura Route)
Pref. Route 26 (Sasebo Port Route)
27.0For Takeo only
4Sasebo Daitō IC/TB (Hario Bypass)22.1
3Sasebo Mikawachi IC/TB14.8
2Hasami Arita ICPref. Route 4 (Kawatana Arita Route)10.1Hasami
1Takeo Minami IC/TB0.0For Fukuoka onlySagaTakeo
6Takeo JCT Nagasaki Expressway0.7